NOTICE TO OFFERORS
PLEASE READ BEFORE COMPLETION OF BID SCHEDULE:
In accordance with DFARS 252.247-7008(a)(1), an offeror must bid on all items within a specified area of performance for a given schedule. Failure to do so may be cause for rejection of the bid for that area of performance of that Schedule.
This requirement consists of three (3) separate schedules, each consisting of four (4) individual areas. In order to be considered for award, an offeror must bid on all items for a particular area. Please insert your unit pricing for each item within your preferred area(s) of performance for the base and each of four option years. The spreadsheet is functioned to calculate the totals upon your insertion of unit prices.
Please also ensure to insert your Guaranteed Daily Capability in NCWT (net hundred-weight), as seen at the top of each spreadsheet in column “D.” This must be inserted for each area and each schedule for which you intend to be considered for award.
SCH III BLANK BASE
| BLANK INTRA-CITY AND INTRA-AREA MOVES |
| ESTIMATED QUANTITIES FOR 01 JANUARY 2020 - 31 DECEMBER 2020 (BASE YEAR) |
| The quantities shown by area of performance for each item in this Solicitation are the Government's |
| estimates of requirements, which may be ordered during the period of the contract. |
| The Government's estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local |
| holidays are listed below by area of performance within each schedule. Bidders must complete the "Bidder's |
| Guaranteed Daily Capability", which must equal or exceed the Government's minimum acceptable daily capability, for |
| all items within an area of performance for which they submit bids. Failure to do so must render the bid non responsive. |
Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800 – 1700, before being committed to non-Government requirements.
| Government's | |
| Government's | Minimum | Bidder's |
| Est Maximum | Acceptable | Guaranteed |
| Daily | Daily | Daily |
| Requirement | Capability | Capability |
| Area 1 Zone 55 |
| Aurora, Beadle, Bon Homme, Brookings, Brown, Brule, Buffalo, Campbell, Charles Mix, Clark, Clay, Codington, Corson, |
| Davison, Day, Deuel, Dewey, Douglas, Edmunds, Faulk, Grant, Gregory, Hamlin, Hand, Hanson, Hughes, Hutchinson, Hyde, |
| Jerauld, Jones, Kingsbury, Lake, Lincoln, Lyman, Marshall, McCook, McPherson, Mellette, Miner, Minnehaha |
| Moody, Potter, Roberts, Sanborn, Spink, Stanley, Sully, Todd, Tripp, Turner, Union, Walworth, Yankton, ziebach |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 2 Zone 56 |
| Bennett, Butte, Custer, Fall River, Haakon, Harding, Jackson, Lawrence, Meade, Pennigton, Perkins, Shannon |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 3 Zone 64 |
| Burt, Cedar, Cuming, Dakota, Dixon, Madison, Pierce, Staton, Thurston, Wayne |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 4 Zone 65 |
| Cherokee, Crawford, Ida, Lyon, Monona, O'Brien, Osceola, Plymouth, Sioux, Woodbury |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Item 0031. Complete Service for Intra‑City and Intra‑Area Moves. Service must include a premove survey, servicing of appliances, packaging |
| and packing at member’s/employee's residence to protect household goods properly during transit, tagging of items, inventorying, loading, |
| weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee's new residence as directed by member/employee |
| or member's /employee's designated representative and removal of all empty containers and materials from residence. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 10 NCWT $0.00 $0.00
Area .......2.......… 1670 NCWT $0.00 $0.00
Area .......3.......… 1 NCWT $0.00 $0.00
Area .......4.......… 1 NCWT $0.00 $0.00
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee's residence is |
| unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor's notification, |
| the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within |
| one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence. |
| Area.........1..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........2..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........3..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........4..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area |
| of performance, not to exceed _100_ miles. Mileage must be computed on the shortest highway distance commencing with the point of |
| departure from the outer boundary of the contract area of performance to the destination point. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 5 per loaded mi $0.00 $0.00
Area .......2......… 5 per loaded mi $0.00 $0.00
Area .......3.......… 5 per loaded mi $0.00 $0.00
Area .......4.......… 5 per loaded mi $0.00 $0.00
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory |
| completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the |
| state regulatory bodies or SDDC, in effect at the time of the order. |
NOTE: All Above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
| Schedule Total ‑ Area ...1............. | $0.00 |
| Schedule Total ‑ Area …2............. | $0.00 |
| Schedule Total ‑ Area …3............. | $0.00 |
| Schedule Total ‑ Area …4............ | $0.00 |
SCH III BLANK OPT 1
| BLANK INTRA-CITY AND INTRA-AREA MOVES |
| ESTIMATED QUANTITIES FOR 01 JANUARY 2021 - 31 DECEMBER 2021 (OPTION YEAR 1) |
| The quantities shown by area of performance for each item in this Solicitation are the Government's |
| estimates of requirements, which may be ordered during the period of the contract. |
| The Government's estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local |
| holidays are listed below by area of performance within each schedule. Bidders must complete the "Bidder's |
| Guaranteed Daily Capability", which must equal or exceed the Government's minimum acceptable daily capability, for |
| all items within an area of performance for which they submit bids. Failure to do so must render the bid non responsive. |
Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800 – 1700, before being committed to non-Government requirements.
| Government's | |
| Government's | Minimum | Bidder's |
| Est Maximum | Acceptable | Guaranteed |
| Daily | Daily | Daily |
| Requirement | Capability | Capability |
| Area 1 Zone 55 |
| Aurora, Beadle, Bon Homme, Brookings, Brown, Brule, Buffalo, Campbell, Charles Mix, Clark, Clay, Codington, Corson, |
| Davison, Day, Deuel, Dewey, Douglas, Edmunds, Faulk, Grant, Gregory, Hamlin, Hand, Hanson, Hughes, Hutchinson, Hyde, |
| Jerauld, Jones, Kingsbury, Lake, Lincoln, Lyman, Marshall, McCook, McPherson, Mellette, Miner, Minnehaha |
| Moody, Potter, Roberts, Sanborn, Spink, Stanley, Sully, Todd, Tripp, Turner, Union, Walworth, Yankton, ziebach |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 2 Zone 56 |
| Bennett, Butte, Custer, Fall River, Haakon, Harding, Jackson, Lawrence, Meade, Pennigton, Perkins, Shannon |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 3 Zone 64 |
| Burt, Cedar, Cuming, Dakota, Dixon, Madison, Pierce, Staton, Thurston, Wayne |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 4 Zone 65 |
| Cherokee, Crawford, Ida, Lyon, Monona, O'Brien, Osceola, Plymouth, Sioux, Woodbury |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Item 0031. Complete Service for Intra‑City and Intra‑Area Moves. Service must include a premove survey, servicing of appliances, packaging |
| and packing at member’s/employee's residence to protect household goods properly during transit, tagging of items, inventorying, loading, |
| weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee's new residence as directed by member/employee |
| or member's /employee's designated representative and removal of all empty containers and materials from residence. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 10 NCWT $0.00 $0.00
Area .......2.......… 1670 NCWT $0.00 $0.00
Area .......3.......… 1 NCWT $0.00 $0.00
Area .......4.......… 1 NCWT $0.00 $0.00
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee's residence is |
| unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor's notification, |
| the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within |
| one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence. |
| Area.........1..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........2..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........3..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........4..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area |
| of performance, not to exceed _100_ miles. Mileage must be computed on the shortest highway distance commencing with the point of |
| departure from the outer boundary of the contract area of performance to the destination point. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 5 per loaded mi $0.00 $0.00
Area .......2......… 5 per loaded mi $0.00 $0.00
Area .......3.......… 5 per loaded mi $0.00 $0.00
Area .......4.......… 5 per loaded mi $0.00 $0.00
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory |
| completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the |
| state regulatory bodies or SDDC, in effect at the time of the order. |
NOTE: All Above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
| Schedule Total ‑ Area ...1............. | $0.00 |
| Schedule Total ‑ Area …2............. | $0.00 |
| Schedule Total ‑ Area …3............. | $0.00 |
| Schedule Total ‑ Area …4............ | $0.00 |
SCH III BLANK OPT 2
| BLANK INTRA-CITY AND INTRA-AREA MOVES |
| ESTIMATED QUANTITIES FOR 01 JANUARY 2022 - 31 DECEMBER 2022 (OPTION YEAR 2) |
| The quantities shown by area of performance for each item in this Solicitation are the Government's |
| estimates of requirements, which may be ordered during the period of the contract. |
| The Government's estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local |
| holidays are listed below by area of performance within each schedule. Bidders must complete the "Bidder's |
| Guaranteed Daily Capability", which must equal or exceed the Government's minimum acceptable daily capability, for |
| all items within an area of performance for which they submit bids. Failure to do so must render the bid non responsive. |
Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800 – 1700, before being committed to non-Government requirements.
| Government's | |
| Government's | Minimum | Bidder's |
| Est Maximum | Acceptable | Guaranteed |
| Daily | Daily | Daily |
| Requirement | Capability | Capability |
| Area 1 Zone 55 |
| Aurora, Beadle, Bon Homme, Brookings, Brown, Brule, Buffalo, Campbell, Charles Mix, Clark, Clay, Codington, Corson, |
| Davison, Day, Deuel, Dewey, Douglas, Edmunds, Faulk, Grant, Gregory, Hamlin, Hand, Hanson, Hughes, Hutchinson, Hyde, |
| Jerauld, Jones, Kingsbury, Lake, Lincoln, Lyman, Marshall, McCook, McPherson, Mellette, Miner, Minnehaha |
| Moody, Potter, Roberts, Sanborn, Spink, Stanley, Sully, Todd, Tripp, Turner, Union, Walworth, Yankton, ziebach |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 2 Zone 56 |
| Bennett, Butte, Custer, Fall River, Haakon, Harding, Jackson, Lawrence, Meade, Pennigton, Perkins, Shannon |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 3 Zone 64 |
| Burt, Cedar, Cuming, Dakota, Dixon, Madison, Pierce, Staton, Thurston, Wayne |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 4 Zone 65 |
| Cherokee, Crawford, Ida, Lyon, Monona, O'Brien, Osceola, Plymouth, Sioux, Woodbury |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Item 0031. Complete Service for Intra‑City and Intra‑Area Moves. Service must include a premove survey, servicing of appliances, packaging |
| and packing at member’s/employee's residence to protect household goods properly during transit, tagging of items, inventorying, loading, |
| weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee's new residence as directed by member/employee |
| or member's /employee's designated representative and removal of all empty containers and materials from residence. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 10 NCWT $0.00 $0.00
Area .......2.......… 1670 NCWT $0.00 $0.00
Area .......3.......… 1 NCWT $0.00 $0.00
Area .......4.......… 1 NCWT $0.00 $0.00
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee's residence is |
| unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor's notification, |
| the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within |
| one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence. |
| Area.........1..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........2..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........3..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........4..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area |
| of performance, not to exceed _100_ miles. Mileage must be computed on the shortest highway distance commencing with the point of |
| departure from the outer boundary of the contract area of performance to the destination point. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 5 per loaded mi $0.00 $0.00
Area .......2......… 5 per loaded mi $0.00 $0.00
Area .......3.......… 5 per loaded mi $0.00 $0.00
Area .......4.......… 5 per loaded mi $0.00 $0.00
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory |
| completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the |
| state regulatory bodies or SDDC, in effect at the time of the order. |
NOTE: All Above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
| Schedule Total ‑ Area ...1............. | $0.00 |
| Schedule Total ‑ Area …2............. | $0.00 |
| Schedule Total ‑ Area …3............. | $0.00 |
| Schedule Total ‑ Area …4............ | $0.00 |
SCH III BLANK OPT 3
| BLANK INTRA-CITY AND INTRA-AREA MOVES |
| ESTIMATED QUANTITIES FOR 01 JANUARY 2023 - 31 DECEMBER 2023 (OPTION YEAR 3) |
| The quantities shown by area of performance for each item in this Solicitation are the Government's |
| estimates of requirements, which may be ordered during the period of the contract. |
| The Government's estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local |
| holidays are listed below by area of performance within each schedule. Bidders must complete the "Bidder's |
| Guaranteed Daily Capability", which must equal or exceed the Government's minimum acceptable daily capability, for |
| all items within an area of performance for which they submit bids. Failure to do so must render the bid non responsive. |
Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800 – 1700, before being committed to non-Government requirements.
| Government's | |
| Government's | Minimum | Bidder's |
| Est Maximum | Acceptable | Guaranteed |
| Daily | Daily | Daily |
| Requirement | Capability | Capability |
| Area 1 Zone 55 |
| Aurora, Beadle, Bon Homme, Brookings, Brown, Brule, Buffalo, Campbell, Charles Mix, Clark, Clay, Codington, Corson, |
| Davison, Day, Deuel, Dewey, Douglas, Edmunds, Faulk, Grant, Gregory, Hamlin, Hand, Hanson, Hughes, Hutchinson, Hyde, |
| Jerauld, Jones, Kingsbury, Lake, Lincoln, Lyman, Marshall, McCook, McPherson, Mellette, Miner, Minnehaha |
| Moody, Potter, Roberts, Sanborn, Spink, Stanley, Sully, Todd, Tripp, Turner, Union, Walworth, Yankton, ziebach |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 2 Zone 56 |
| Bennett, Butte, Custer, Fall River, Haakon, Harding, Jackson, Lawrence, Meade, Pennigton, Perkins, Shannon |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 3 Zone 64 |
| Burt, Cedar, Cuming, Dakota, Dixon, Madison, Pierce, Staton, Thurston, Wayne |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 4 Zone 65 |
| Cherokee, Crawford, Ida, Lyon, Monona, O'Brien, Osceola, Plymouth, Sioux, Woodbury |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Item 0031. Complete Service for Intra‑City and Intra‑Area Moves. Service must include a premove survey, servicing of appliances, packaging |
| and packing at member’s/employee's residence to protect household goods properly during transit, tagging of items, inventorying, loading, |
| weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee's new residence as directed by member/employee |
| or member's /employee's designated representative and removal of all empty containers and materials from residence. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 10 NCWT $0.00 $0.00
Area .......2.......… 1670 NCWT $0.00 $0.00
Area .......3.......… 1 NCWT $0.00 $0.00
Area .......4.......… 1 NCWT $0.00 $0.00
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee's residence is |
| unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor's notification, |
| the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within |
| one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence. |
| Area.........1..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........2..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........3..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........4..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area |
| of performance, not to exceed _100_ miles. Mileage must be computed on the shortest highway distance commencing with the point of |
| departure from the outer boundary of the contract area of performance to the destination point. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 5 per loaded mi $0.00 $0.00
Area .......2......… 5 per loaded mi $0.00 $0.00
Area .......3.......… 5 per loaded mi $0.00 $0.00
Area .......4.......… 5 per loaded mi $0.00 $0.00
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory |
| completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the |
| state regulatory bodies or SDDC, in effect at the time of the order. |
NOTE: All Above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
| Schedule Total ‑ Area ...1............. | $0.00 |
| Schedule Total ‑ Area …2............. | $0.00 |
| Schedule Total ‑ Area …3............. | $0.00 |
| Schedule Total ‑ Area …4............ | $0.00 |
SCH III BLANK OPT 4
| BLANK INTRA-CITY AND INTRA-AREA MOVES |
| ESTIMATED QUANTITIES FOR 01 JANUARY 2024 - 31 DECEMBER 2024 (OPTION YEAR 4) |
| The quantities shown by area of performance for each item in this Solicitation are the Government's |
| estimates of requirements, which may be ordered during the period of the contract. |
| The Government's estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local |
| holidays are listed below by area of performance within each schedule. Bidders must complete the "Bidder's |
| Guaranteed Daily Capability", which must equal or exceed the Government's minimum acceptable daily capability, for |
| all items within an area of performance for which they submit bids. Failure to do so must render the bid non responsive. |
Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800 – 1700, before being committed to non-Government requirements.
| Government's | |
| Government's | Minimum | Bidder's |
| Est Maximum | Acceptable | Guaranteed |
| Daily | Daily | Daily |
| Requirement | Capability | Capability |
| Area 1 Zone 55 |
| Aurora, Beadle, Bon Homme, Brookings, Brown, Brule, Buffalo, Campbell, Charles Mix, Clark, Clay, Codington, Corson, |
| Davison, Day, Deuel, Dewey, Douglas, Edmunds, Faulk, Grant, Gregory, Hamlin, Hand, Hanson, Hughes, Hutchinson, Hyde, |
| Jerauld, Jones, Kingsbury, Lake, Lincoln, Lyman, Marshall, McCook, McPherson, Mellette, Miner, Minnehaha |
| Moody, Potter, Roberts, Sanborn, Spink, Stanley, Sully, Todd, Tripp, Turner, Union, Walworth, Yankton, ziebach |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 2 Zone 56 |
| Bennett, Butte, Custer, Fall River, Haakon, Harding, Jackson, Lawrence, Meade, Pennigton, Perkins, Shannon |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 3 Zone 64 |
| Burt, Cedar, Cuming, Dakota, Dixon, Madison, Pierce, Staton, Thurston, Wayne |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Area 4 Zone 65 |
| Cherokee, Crawford, Ida, Lyon, Monona, O'Brien, Osceola, Plymouth, Sioux, Woodbury |
| INTRA-CITY AREA | NCWT | NCWT | NCWT |
| (Schedule III) | 200 | 180 | |
| Item 0031. Complete Service for Intra‑City and Intra‑Area Moves. Service must include a premove survey, servicing of appliances, packaging |
| and packing at member’s/employee's residence to protect household goods properly during transit, tagging of items, inventorying, loading, |
| weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee's new residence as directed by member/employee |
| or member's /employee's designated representative and removal of all empty containers and materials from residence. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 10 NCWT $0.00 $0.00
Area .......2.......… 1670 NCWT $0.00 $0.00
Area .......3.......… 1 NCWT $0.00 $0.00
Area .......4.......… 1 NCWT $0.00 $0.00
| Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee's residence is |
| unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor's notification, |
| the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within |
| one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence. |
| Area.........1..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........2..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........3..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Area.........4..................... | Est Annual | Unit | Unit | Total |
| QTY | | Price | |
| AA. Attempted Pickup | 5 | ea shpmt | $0.00 | $0.00 |
| AB. Attempted Delivery | 5 | ea shpmt | $0.00 | $0.00 |
| Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area |
| of performance, not to exceed _100_ miles. Mileage must be computed on the shortest highway distance commencing with the point of |
| departure from the outer boundary of the contract area of performance to the destination point. |
| Est. Annual Qty. | Unit | Unit | Total |
| | Price | |
Area .......1.......… 5 per loaded mi $0.00 $0.00
Area .......2......… 5 per loaded mi $0.00 $0.00
Area .......3.......… 5 per loaded mi $0.00 $0.00
Area .......4.......… 5 per loaded mi $0.00 $0.00
| Item 0034 Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory |
| completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the |
| state regulatory bodies or SDDC, in effect at the time of the order. |
NOTE: All Above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
| Schedule Total ‑ Area ...1............. | $0.00 |
| Schedule Total ‑ Area …2............. | $0.00 |
| Schedule Total ‑ Area …3............. | $0.00 |
| Schedule Total ‑ Area …4............ | $0.00 |