PWS-SR-71 CULTURAL RESOURCE MANAGEMENT SERVICES-DRAFT..docx

DOCX document 51 KB Posted

Attached to
SR-71 Cultural Resource Management Service
Solicitation number
FA468627CulturalResource
Issued by

About this file

This is a draft Performance Work Statement (PWS) for cultural resource management services supporting the deconstruction and relocation of two historic SR-71 aircraft hangars (Buildings 1057 and 1058) at Beale Air Force Base, California. The scope requires the contractor to assist the base Cultural Resources Manager in executing Section 106 compliance under the National Historic Preservation Act, including interagency and tribal consultations, Memorandum of Agreement (MOA) development, and implementation of agreed mitigation measures. The work is governed by Department of the Air Force Manual 32-7003, the Beale AFB Integrated Cultural Resources Management Plan, and Secretary of the Interior Standards for historic preservation. The contractor must provide qualified personnel meeting SOI Professional Qualification Standards in Architectural History, with the designated Project Architectural Historian requiring a minimum of five years' professional experience conducting cultural resource management investigations in Northern California and demonstrable experience with DoD Section 106 consultations, HABS/HAER documentation, and Cold War military aviation infrastructure.

The contract requires execution of six primary task areas: Section 106 consultation packages and support (including SHPO, tribal, and interested party coordination); MOA development with multi-tier review cycles and comment resolution matrices; HABS/HAER archival documentation including historical narrative, large-format photography, and drawings; educational outreach website development; and optional supplemental mitigation materials. Work must proceed concurrently across phases with critical milestones including consultation packages within 30 days of award, Draft MOA within 45 days of SHPO postmark, on-site photography completion by March 1, 2027, and final HABS/HAER NPS submittal within 60 days of field work conclusion. The contract period extends 18 months from award, with the MOA and photography phases concluding by March 1, 2027. Work is performed primarily off-site at the contractor's facility with on-site activities at Beale AFB requiring base access authorization, Public Affairs review, and Controlled Unclassified Information handling per 32 CFR Part 2002 and Archaeological Resources Protection Act standards.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

STATEMENT OF WORK (SOW)

FOR

CULTURAL RESOURCE MANAGEMENT SERVICES FOR THE DECONSTRUCTION AND

RELOCATION OF TWO SR-71 HANGARS (BUILDINGS 1057 AND 1058)

Beale Air Force Base, California

INTRODUCTION & BACKGROUND

1.1 Background: Beale Air Force Base (AFB), California, proposes the deconstruction and relocation of two historic aircraft hangars—Building 1057 and Building 1058.

1.2 Historic Significance: Both facilities served as operational hangars during the Cold War in direct support of the strategic reconnaissance mission (specifically the SR-71 "Blackbird" program) and have been formally evaluated and recommended as eligible for listing on the National Register of Historic Places (NRHP).

1.3 Statutory Context: The planned deconstruction and relocation constitutes a federal "undertaking" that will result in an "adverse effect" to historic properties under Section 106 of the National Historic Preservation Act (NHPA; 54 U.S.C. § 306108) and its implementing regulations (36 CFR Part 800). To fulfill statutory and regulatory obligations, Beale AFB requires professional cultural resource management services to complete interagency/tribal consultations, prepare a formal Memorandum of Agreement (MOA), and execute required historic mitigation measures.

2.0 SCOPE OF WORK & OBJECTIVES

2.1 Primary Objective: The Contractor shall provide all qualified personnel, materials, equipment, transportation, and technical expertise necessary to assist the Beale AFB Cultural Resources Manager (CRM) in executing the Section 106 compliance process and implementing agreed-upon mitigation measures for the deconstruction and relocation of Buildings 1057 and 1058.

2.2 Compliance Baseline: All work performed under this contract shall adhere strictly to:

Department of the Air Force Manual (DAFMAN) 32-7003 (Environmental Conservation) Beale AFB Integrated Cultural Resources Management Plan (ICRMP) National Historic Preservation Act (NHPA) of 1966, as amended (54 U.S.C. § 300101 et seq.)

Protection of Historic Properties (36 CFR Part 800) Secretary of the Interior’s Standards and Guidelines for Archeology and Historic Preservation (48 FR 44716) Historic American Buildings Survey / Historic American Engineering Record (HABS/HAER) Standards (National Park Service)

3.0 CONTRACTOR QUALIFICATIONS & KEY PERSONNEL

3.1 Secretary of the Interior (SOI) Standards: Contractor personnel performing cultural resources investigations, documentation, and reporting shall meet the Secretary of the Interior's Professional Qualification Standards (36 CFR Part 61) in Architectural History and/or Historry.

3.2 Regional and Technical Experience:

The designated Project Architectural Historian must have a minimum of five (5) years of professional experience conducting cultural resource management investigations within Northern California.

The designated Project Architectural Historian must have experience with Department of Defense (DoD) Section 106 consultations, HABS/HAER documentation submittals to the National Park Service (NPS), and Cold War military aviation infrastructure.

4.0 SPECIFIC TASKS AND REQUIREMENTS

Task 4.1: Section 106 Consultation Packages & Support The Contractor shall assist the Beale AFB CRM in drafting, assembling, and finalizing formal Section 106 consultation packages to resolve adverse effects.

4.1.1 State Historic Preservation Officer (SHPO) Consultation: Prepare consultation letters and supporting technical documentation for submittal to the California State Historic Preservation Officer (SHPO) seeking concurrence on NRHP eligibility determinations, the findings eligibility and effect to historic properties, and proposed mitigation pathways.

4.1.2 Tribal Consultation Packages: Prepare tailored consultation packages and letters for nine (9) federally recognized and affiliated Native American tribal partners identified by Beale AFB, requesting consultation, inquiring about any concerns, and requesting support in developing potential mitigation concepts.

4.1.3 Other Interested Parties: Assist the Beale AFB CRM in identifying, compiling, and engaging with potential interested parties (e.g., local historical societies, veterans' organizations, military aviation preservation groups). Prepare initial notification and coordination correspondence for approved parties.

4.1.4 Meeting Support & Meeting Minutes: Participate via teleconference or in person (as agreed) in up to four (4) consultation meetings with SHPO, tribes, or interested parties. The Contractor shall record and provide formal meeting minutes within five (5) business days following each session.

Task 4.2: Memorandum of Agreement (MOA) Development Because the undertaking will have an adverse effect on historic properties, the Contractor shall develop a Section 106 Memorandum of Agreement pursuant to 36 CFR § 800.6.

4.2.1 MOA Framework & Stipulation Formulation: In close coordination with the Beale AFB CRM, the Contractor shall formulate the MOA structure, recitals, administrative clauses, and enforceable mitigation stipulations tailored specifically to the historical significance of the SR-71 hangars.

4.2.2 Multi-Tier Review Cycles: The Contractor shall prepare and deliver a Draft MOA, a revised Draft-Final MOA (incorporating Air Force and consulting party review comments), and a Final Execution-Ready MOA ready for signatory execution by the Installation Commander, SHPO, Advisory Council on Historic Preservation (ACHP, if participating), and concurring/invited signatories.

4.2.3 Comment Resolution: Each successive draft submittal must be accompanied by a formal Comment Resolution Matrix (CRM) showing the disposition and text revisions for every received agency and stakeholder comment.

Task 4.3: Mitigation Implementation Task 4.3.1: HABS/HAER Documentation The Contractor shall complete archival-standard Historic American Buildings Survey (HABS) or Historic American Engineering Record (HAER) documentation for Buildings 1057 and 1058 in accordance with NPS Heritage Documentation Programs specifications.

Historical Narrative & Context Report: Research and write an illustrated, archival-grade historical report documenting the operational role, construction history, alterations, and Cold War strategic reconnaissance missions associated with Buildings 1057 and 1058.

Large-Format Photography: Conduct on-site large-format black-and-white archival film photography (or high-resolution digital photography adhering to current NPS HABS/HAER digital camera specifications and guidelines) capturing interior details, structural assemblies, character-defining features, exterior elevations, contextual views, and contextual equipment spaces.

Drawings & Reproduction: Review, clean, and catalog historical architectural and engineering drawings provided by the Government. Format selected sheets to standard NPS archival specifications.

NPS Submittal & Archival Packages: Prepare the complete HABS/HAER documentation package for review by the regional NPS office and coordinate final archival transmittals. Furnish archival-bound hard copies and gold archival digital media sets to Beale AFB and designated regional repositories identified in the MOA.

Task 4.3.2: Educational Outreach Website The Contractor shall develop digital public-interpretation content to convey the history and significance of the SR-71 hangars and their contribution to Cold War aviation history.

Develop responsive, accessible web page content (text, scanned historical photographs, layout recommendations, and oral/written history summaries) suitable for integration into Beale AFB's public-facing digital media or designated local partner platforms.

Coordinate all proposed public content through the Beale AFB CRM and the Beale AFB Public Affairs (PA) Office prior to release or posting.

Task 4.3.3: Optional / Supplemental Mitigation (CLIN [Option]) Note: This task may be exercised at the sole discretion of the Government based on the final stipulations codified in the signed MOA.

Upon written direction from the Contracting Officer, the Contractor shall design and produce supplemental educational or interpretive materials, which may include:

Permanent interpretive signs/wayside exhibits (weather-resistant, exterior-grade) installed on base or in an accessible public location.

Public commemorative brochures/handouts (print-ready PDF and physical run of up to 500 copies).

Educational artifacts preservation/curation coordination packages.

5.0 DELIVERABLES SCHEDULE AND REVIEW PROCESS

5.1 Deliverable Timelines Narrative: Work under this contract proceeds in parallel phases to satisfy strict project milestones. The schedule is sequenced as follows:

1. Consultation Phase (Task 4.1): Within 30 calendar days of contract award, the Contractor shall compile potential Interested Parties and submit draft Section 106 consultation packages addressed to the California SHPO, nine (9) affiliated Native American tribal partners (14 letters), and other Interested Parties. Upon receipt of Government review comments, final mail-ready consultation packages shall be produced within seven (7) calendar days. SHPO and other Interested Parties packages to be postmarked by Dec 16. Tribal letters will take longer as they need to be signed by the Wing Commander.

2. Memorandum of Agreement (Task 4.2): Concurrently, within 45 calendar days of SHPO and Interested Parties consultation package postmark , the Contractor shall submit a Draft MOA outlining proposed mitigation measures. Incorporating internal Air Force, SHPO, and tribal feedback, the Contractor shall produce a Draft-Final MOA within 10 calendar days following comments. The Final Execution-Ready MOA must be completed no later than 1 March 2027.

3. Concurrent HABS/HAER & Archival Photography (Task 4.3.1): The Contractor shall submit a HABS/HAER Photographic Work Plan within 45 calendar days of award. Following plan approval, on-site large-format archival photography and required base Public Affairs/OPSEC clearance must be completed prior to 1 March 2027, before any structural alteration or demolition activity commences.

4. HABS/HAER NPS Submittal (Task 4.3.1): Within 60 calendar days of concluding the on-site photographic field session, the Contractor shall submit the Draft HABS/HAER Documentation Package. A revised, final submittal suitable for formal transmittal to the National Park Service shall be delivered within 20 calendar days of receiving final Government comments.

5. Educational Public Outreach Website (Task 4.3.2): Within 60 calendar days following final submittal of the HABS/HAER, the Contractor shall submit draft public outreach website content. A final deployable website package shall be delivered within 20 calendar days following Public Affairs review.

6. Optional Supplemental Mitigation (Task 4.3.3): If exercised by the Contracting Officer, deliverables and schedules for other potential mitigation exhibits will be established in accordance with stipulations codified in the executed MOA.

5.2 Review Standards: The Government will have fourteen (14) calendar days to review each draft submittal. The Contractor shall deliver revised drafts within seven to 10 days (7-10) calendar days of receiving Government comments.

Due to critical facility and mission-readiness timelines for the deconstruction and relocation of Buildings 1057 and 1058, time is of the essence. The Contractor and the Government shall adhere to an expedited review cycle established during the kickoff meeting.

5.3 Format Requirements:

Text documents shall be delivered in Microsoft Word (.docx) and Adobe Searchable PDF (.pdf).

HABS/HAER transmittals shall meet NPS physical and archival digital specifications.

Task #
Deliverable Description
Initial Due Date
Final Due Date
Recipient(s)
4.1
Draft SHPO Consultation Letter & Package
30 days post-award
15 days post-review comments
Beale AFB CRM
4.1
Draft Tribal & Interested Party Letters (12+)
30 days post-award
15 days post-review comments
Beale AFB CRM
4.1
Final Consultation Packages (SHPO/Tribes)
7 days post-comments
Prior to agency mailing
Beale AFB CRM / CO
4.2
Draft Memorandum of Agreement (MOA)
45 days post-consultation postmark to SHPO & Other Interested Parties
N/A
Beale AFB CRM
4.2
Draft-Final MOA & Comment Matrix
15 days post-Gov/SHPO review
N/A
Beale AFB CRM
4.2
Final Execution-Ready MOA
15 days post-SHPO/Tribal/other Interested Parties review
Final signature copy
Beale AFB CRM / CO
4.3.1
HABS/HAER Work Plan & Photo Plan
60 days post-award
15 days post-Gov review
Beale AFB CRM
4.3.1
Draft HABS/HAER Documentation Package
75 days post-site visit
30 days post-Gov review
Beale AFB CRM
4.3.1
Final HABS/HAER Package & NPS Submittal
30 days post-Gov review
Upon NPS Acceptance
Beale AFB CRM / NPS
4.3.2
Draft Public Outreach Website Content
60 days post-HABS/HAER finalization
15 days post-Gov review
Beale AFB CRM / PA
4.3.2
Final Public Outreach Website Package
20 days post-PA review
Complete for deployment
Beale AFB CRM / PA
4.3.3
Optional Mitigation Deliverables (if exercised)
[To be determined by MOA]
[Per modification]
Beale AFB CRM / CO

6.0 GOVERNMENT-FURNISHED INFORMATION (GFI)

The Government will make the following available to the Contractor:

Available historic building inventory forms (DPR 523 forms) and previous NRHP eligibility evaluations for Buildings 1057 and 1058.

If available, scanned archival architectural blueprints, engineering drawings, and base real property record cards.

If available, relevant historical narratives, photographs, and records from the Beale AFB History Office.

Comprehensive roster and contact details for the nine (9) affiliated tribal consultation representatives.

7.0 SECURITY, INSTALLATION ACCESS, AND DATA HANDLING

7.1 Installation Access and Escorts:

The Contractor shall submit all required base pass applications (e.g., REAL ID, background check forms) for designated personnel at least four (4) business days prior to any planned site visit.

Beale AFB will grant base access and designate a qualified escort for on-site visual inspections, measurements, and photography sessions at Buildings 1057 and 1058.

7.2 Controlled Unclassified Information (CUI):

Certain information (including maps, and GIS data) is classified as Controlled Unclassified Information (CUI) and protected under NHPA Section 304 and 32 CFR Part 2002, and Archaeological Resources Protection Act (ARPA) of 1979 Section 9.

The Contractor shall mark, store, handle, and transmit all sensitive project files in accordance with federal CUI standards. The Beale AFB CRM serves as the controlling authority for dissemination determinations.

7.3 On-Site Photography & Public Affairs (PA) Review:

Photography is strictly controlled on military installations. Beale AFB will provide a photography authorization and coordinate with Public Affairs for the Contractor’s architectural historian/photographer.

All raw image files, digital contact sheets, and photography logs captured on Beale AFB must be submitted to the Beale AFB CRM and Beale AFB Public Affairs / OPSEC reviewers prior to public dissemination, publication, or submission outside the installation.

8.0 PERIOD OF PERFORMANCE & PLACE OF PERFORMANCE

8.1 Period of Performance: The period of performance for the MOA and photography to be finished is 1 March 2027 with the remaining mitigation to be finished eighteen (18) months from the date of award.

8.2 Place of Performance:

Off-site work (archival research, document drafting, graphic composition, coordination) shall occur at the Contractor’s corporate facility.

On-site work (physical inspections, field investigations, HABS/HAER photography) shall take place at Beale Air Force Base, California.

File details come from the government source that posted it. Updated .