PART I - THE SCHEDULE
SECTION B
BID SCHEDULE
Contractor shall provide all plant, labor, supervision, equipment, supplies, services and necessary materials to perform all operations in conjunction with Project No. BAEY114444, CIVIL IDIQ8, at Beale AFB CA, complete and in strict accordance with the terms and conditions of the contract.
BASE YEAR
| ITEM |
| SUPPLIES/SERVICES |
| BASIS FOR UNIT PRICE |
| KTR'S BID UNIT PRICE |
| 0001 |
| 1” thick Asphalt Concrete overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 0002 |
| Same as above |
| 2000-3999 SY |
| 0003 |
| Same as above |
| 4000-5999 SY |
| 0004 |
| Same as above |
| 6000-9999 SY |
| 0005 |
| Same as above |
| 10000 SY & up |
| 0006 |
| 1-1/2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 0007 |
| Same as above |
| 2000-3999 SY |
| 0008 |
| Same as above |
| 4000-5999 SY |
| 0009 |
| Same as above |
| 6000-9999 SY |
| 0010 |
| Same as above |
| 10000 SY & up |
| 0011 |
| 2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 0012 |
| Same as above |
| 2000-3999 SY |
| 0013 |
| Same as above |
| 4000-5999 SY |
| 0014 |
| Same as above |
| 6000 SY & up |
| 0015 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 6000 SY & up |
| 0016 |
| 3” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 0017 |
| Same as above |
| 2000-3999 SY |
| 0018 |
| Same as above |
| 4000-5999 SY |
| 0019 |
| Same as above |
| 6000 SY & up |
| 0020 |
| Type I Slurry Seal in accordance with CalTrans specifications, including: cleaning; preparation; removal and spraying of weeds; traffic control using cones, signs and barricades; pneumatic tire roller compaction; and all associated work. |
| 2000-5000 SY |
| 0021 |
| Same as above |
| 5,000-10,000 SY |
| 0022 |
| Same as above |
| 20,001 SY & up |
| 0023 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 5,000-10,000 SY |
| 0024 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 20,001 SY & up |
| 0025 |
| Repair/Patch AC Pavement per specs Section 02200-3.4, multiple locations (at least 1 SY ea), including sawcutting, excavation, disposal, layout, aggregate base, and all associated work as listed in item 1. |
| 50-299 SY |
| 0026 |
| Same as above |
| 300-799 SY |
| 0027 |
| Same as above |
| 800-1999 SY |
| 0028 |
| Same as above |
| 2000 SY & up |
| 0029 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 2000 SY & up |
| 0030 |
| Remove existing asphalt concrete by grinding, 4’ minimum width, 2” maximum depth, including hauling and disposal off base and all associated work. |
| 50-500 SY |
| 0031 |
| Same as above |
| 501-2000 SY |
| 0032 |
| Same as above |
| 2001-5000 SY |
| 0033 |
| Same as above |
| 5001 SY & up |
| 0034 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 5001 SY & up |
| 0035 |
| Furnish and place paving fabric for AC overlay IAW CalTrans Specs and manufacturer's recommendations, including cleaning and prep, tack coat, cones and barricades for traffic control, and all associated work. |
| 500-1999 SY |
| 0036 |
| Same as above |
| 2000-3999 SY |
| 0037 |
| Same as above |
| 4000-5999 SY |
| 0038 |
| Same as above |
| 6000 SY & up |
| 0039 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 1000 SY & up |
| 0040 |
| 4” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction. |
| 100-499 SY |
| 0041 |
| Same as above |
| 500-2000 SY |
| 0042 |
| Same as above |
| 2001 SY & up |
| 0043 |
| 6” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction. |
| 100-499 SY |
| 0044 |
| Same as above |
| 500-2000 SY |
| 0045 |
| Same as above |
| 2001 SY & up |
| 0046 |
| 6” thk layer drain rock course (1"-2 1/2" crushed) including all associated work. |
| 15 Tons & up |
| 0047 |
| Furnish & place AB shoulder backing including grading, compacting, cones, barricades, working around signs and delineators, and all associated work. |
| 45-199 Tons |
| 0048 |
| Same as above |
| 200-1000 Tons |
| 0049 |
| Same as above |
| 1001-2500 Tons |
| 0050 |
| Same as above |
| 2501 Tons & up |
| 0051 |
| Trenching for pipe or culverts in gravel or soil areas including backfill (in such a manner as to protect pipe), 90% compaction, restoration, and all associated work. |
| 4 - 20 CY |
| 0052 |
| Same as above |
| 20-100 CY |
| 0053 |
| Same as above |
| 101 CY & up |
| 0054 |
| Prepare, grade, water, compact (90%) existing gravel or ground, for paving, slab or gravel lot, 6" max. cut and/or fill, including all associated work. |
| 500-2500 SY |
| 0055 |
| Same as above |
| 2501-6000 SY |
| 0056 |
| Same as above |
| 6001 SY & up |
| 0057 |
| Load gravel or earth from pile at Beale AFB, haul (8 miles round trip max), place and compact ("fill"), including removal of surface rocks larger than 2", and all associated work. |
| 10 - 80 CY |
| 0058 |
| Same as above |
| 81 CY & up |
| 0059 |
| Excavate existing gravel or ground ("cut"), load, haul (8 miles round trip max), and stock pile at designated location at Beale AFB, including removal of surface rocks larger than 2", and all associated work. |
| 20 - 100 CY |
| 0060 |
| Same as above |
| 100 CY & up |
| 0061 |
| Crack or Joint Sealing in AC or Concrete Road - including air blast cleaning, burning or removal of weeds, measurement of daily lineal footage, and all associated work. |
| 3500-6999 LF |
| 0062 |
| Same as above |
| 7000-19999 LF |
| 0063 |
| Same as above |
| 20000 LF & up |
| 0064 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 20000 LF & up |
| 0065 |
| 2" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill. |
| 100 LF & up |
| 0066 |
| 4" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill. |
| 100 LF & up |
| 0067 |
| 12" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 0068 |
| 18" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 0069 |
| 24" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 0070 |
| Valve/utility box, (Christy B3 or approved equal) including lid, 12" extension, earthwork and connection to two conduits. |
| EA |
| 0071 |
| Raising of valve box, utility box, or manhole frame & cover 1" to 3" as req'd for AC overlay, including concrete grade rings and/or shims. |
| EA |
| 0072 |
| 12" square or round drain box (Christy V1, V9, or approved equal) including cast iron grate, 12" extension, excavation, backfill, compaction, and connection to two pipes. |
| EA |
| 0073 |
| 24" square catch basin (Christy U22 or approved equal) including cast iron traffic grate, 12" extension, excavation, backfill, compaction, and connection to two pipes. |
| EA |
| 0074 |
| Hydroseeding, Native Erosion Control Seed Mix (brome, lupine, clover) 1 lb per 1000 SF (9#/1000SY), including wood fiber and tackifier. |
| 1000-5000 SF |
| 0075 |
| Same as above |
| 5001-20,000 SF |
| 0076 |
| Same as above |
| 20,001 SF & up |
| 0077 |
| Construct 6”X14” Concrete Vertical Curb including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work. |
| 25-99 LF |
| 0078 |
| Same as above |
| 100 LF & up |
| 0079 |
| Construct 6"high X 36”wide Concrete Curb & Gutter, vertical or rolled, including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work. |
| 50-99 LF |
| 0080 |
| Same as above |
| 100 - 499 LF |
| 0081 |
| Same as above |
| 500 LF & up |
| 0082 |
| Construct concrete sidewalk or patio, 4” thick on 2” sand base, including layout, excavation up to 12" deep, subgrade prep, formwork, joints, finishing, and curing. |
| 200-999 SF |
| 0083 |
| Same as above |
| 1000 SF & up |
| 0084 |
| Construct concrete slab, 6” thick on 4” aggregate base with 6 mil plastic vapor barrier, including layout, excavation up to 12" deep, formwork, subgrade prep, finishing, joints, and curing. |
| 100-499 SF |
| 0085 |
| Same as above |
| 500 SF & up |
| 0086 |
| Remove concrete slabs/sidewalk 3"-5" thick, including hauling and disposal. |
| 100-499 SF |
| 0087 |
| Same as above |
| 500 SF & up |
| 0088 |
| Remove concrete slabs 6"-8" thick or curb & gutter (curb w/ 2.5 ft gutter = 3 SF/LF) including hauling and disposal. |
| 200-499 SF |
| 0089 |
| Same as above |
| 500 SF & up |
| 0090 |
| Remove concrete footings including rebar, hauling and disposal. |
| 10 CY & up |
| 0091 |
| Pavement markings such as crosswalks and stop lines using heated thermoplastic material including layout and traffic control |
| 24-99 SF |
| 0092 |
| Same as above |
| 100 SF & up |
| 0093 |
| Paint broken centerline-- thermoplastic, 4" wide yellow, including layout, cones and traffic control (7' dashes w/17' gaps <35 mph zones; 12' gaps w/ 36' gaps 35 mph zones or faster) |
| 1000-15,000 LF (incl gaps) |
| 0094 |
| Same as above |
| 15,001LF & up (incl gaps) |
| 0095 |
| Paint double yellow centerlines-- thermoplastic, two 4" yellow lines w/4" black line in middle including layout, cones and traffic control |
| 1000-15,000 LF |
| 0096 |
| Same as above |
| 15,001LF & up |
| 0097 |
| Paint fogline-- thermoplastic, 4" white, including layout, cones and traffic control |
| 1000-15,000 LF |
| 0098 |
| Same as above |
| 15,001LF & up |
| 0099 |
| Paint parking lot striping, such as parking spaces with 4" white lines, non-reflectorized, including layout, cones and barricades as required. |
| 50-300 SF |
| 0100 |
| Same as above |
| 301 SF & up |
| 0101 |
| Paint complete Handicap parking stall, non-reflectorized (not thermoplastic), including layout, cones and barricades as required. |
| EA |
| 0102 |
| Paint Road Striping, thermoplastic, including two foglines and centerline (double or dashed), layout, cones and traffic control. |
| 1 - 4.99 Miles |
| 0103 |
| Same as above |
| 5 Miles & up |
| 0104 |
| Reflective pavement markers (Ray-O-Lite or approved equal)-- 4" square, one-way or two-way, white or yellow and/or Non-reflective pavement markers/ "buttons" (Diamondback plastic or approved equal)-- 4" round, white or yellow. Includes layout, cones and traffic control. |
| 100 - 500 EA |
| 0105 |
| Same as above |
| 501-2000 EA |
| 0106 |
| Same as above |
| 2001 EA & up |
| 0107 |
| Traffic Control with 2 flag persons, cones, barricades, and signs as req'd to keep two-way traffic open. Note that barricades, detour signs, closed signs, and cones shall be included with respective items of work when roads or lots are closed to traffic. |
| 1/2 Day |
| 0109 |
| Fee for administration, digging permit, notifications, and all coordination for each delivery order - regardless of scope or location. See notes below. |
| EA- One Per Delivery Order |
| 0110 |
| Fee for mobilization to any location on base for each delivery order. See notes below. |
| EA |
| 0111 |
| Furnish & place white reflective paint on Runway, including markings, numbers, beads, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100,000 SF & up |
| 0112 |
| Furnish & place black outline non-reflective paint on Runway around markings or numbers, including layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 15,000 SF & up |
| 0113 |
| Furnish & place yellow reflective paint on airfield taxiways, including 6"wide taxilines, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 40,000 SF & up |
| 0114 |
| Remove runway rubber deposits from runway concrete surface, including disposal, coordination, test strip, and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100,000 SF & up |
| 0115 |
| Reseal airfield concrete joints & cracks including removal of old joint materials, refacing joint, backer rod, coordination and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 20,000 LF & up |
| 0116 |
| Furnish & place chain link fence including posts, footing, braces, fence tie-down rods at midpoint of each panel, outriggers with 3-strands barbed wire, signs every 100 yds, electric cattle wire system with supports and solar generator, grading 10-ft wide for smooth fence line, excavation for posts, creek crossings, and all miscellaneous components and fasteners IAW Specs & Plans. |
| 1000-5000 LF |
| 0117 |
| Same as above |
| 5000 LF & Up |
| 0118 |
| Furnish & place chain link fence single swing gate including framed gate with fabric, 4" gate posts with footings, braces, extended frame with 3-strands barbed wire, hinges, latches, electric cattle wire system with quick disconnect handle & hook, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 4 ft to 13 ft wide. |
| 4 ft -13 ft wide (price per foot of gate opening) |
| 0119 |
| Furnish & place chain link fence double swing gates including framed gates with fabric, 4" gate posts with footings, braces, extended frame with 3-strands barbed wire, hinges, latches, electric cattle wire system with quick disconnect handle & hook, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 13 ft to 25 ft wide. |
| 13 ft -25 ft wide (price per foot of gate opening) |
| 0120 |
| Furnish & place chain link fence rolling gate including framed gates with fabric, 4" gate posts with footings, wheels with mountings, braces, extended frame with 3-strands barbed wire, latches, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 18 ft to 30 ft wide. |
| 18 ft -30 ft wide (price per foot of gate opening) |
| 0121 |
| Repair Chain Link Fence from vehicle breach or similar damage, 40- foot section, including mobilization, demobilization, and replacing all damaged or bent fencing, such as fabric, posts, footings, outriggers, barbed wire, electric cattle wire, signs, and tying into existing fencing. |
| EA |
| 0122 |
| Add vehicle restraining 3/4"cable to Fencing Item 0116 and delete electric cattle wire system |
| 1000-5000 LF |
| 0123 |
| Add vehicle restraining 3/4"cable to Fencing Item 0117 and delete electric cattle wire system |
| 5000 LF & Up |
| 0124 |
| Profile Grind concrete street/pavement including removing reflectors and paint, traffic control, hauling and disposal of all waste materials off base. |
| 20,000 SY & up |
| 0125 |
| Completely remove paint on airfield concrete pavement such as 4 to 6-inch wide yellow taxi lines, including hazardous material testing, disposal of all waste, and all associated work. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100-2000 SF |
| 0126 |
| Same as above |
| 2001 SF & up |
| 0127 |
| Repair spalls in airfield concrete including saw-cutting outside perimeter of spall, jack-hammering to remove failed concrete, disposal of all debris, epoxy concrete and binder, forming new joint and sealant. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 10 -100 SF |
| 0128 |
| Same as above |
| 101 SF & up |
| 0129 |
| Install galvanized steel Bollards IAW plans including 2 footings, 2 sleeves, reflective tape, cable, 2 padlocks, powdercoat finish, 6”deep x20”wide concrete band, traffic control barricades and signs, and all associated work. |
| 10 EA & Up |
NOTES:
1. Each Delivery Order will be at least $5000.
2. No item will be ordered by itself, therefore each DO will include at least two items.
3. All items include all associated work such as layout, site preparation, materials, equipment, labor, submittals, coordination, dig permit, cones & barricades for traffic control, basic traffic plan, security access for employees and vehicles via Wheatland Gate, clean-up and disposal IAW the specs.
4. The Contractor may schedule work in order to combine work from separate delivery orders such that they may be done at the same time or consecutively.
5. Unit Prices are the cost per unit in the listed quantity range for the respective item.
6. Quantities listed indicate in-place quantities, thicknesses (compacted), square yards, cubic yards, and so forth.
OPTION YEAR 1
| ITEM |
| SUPPLIES/SERVICES |
| BASIS FOR UNIT PRICE |
| KTR'S BID UNIT PRICE |
| 1001 |
| 1” thick Asphalt Concrete overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 1002 |
| Same as above |
| 2000-3999 SY |
| 1003 |
| Same as above |
| 4000-5999 SY |
| 1004 |
| Same as above |
| 6000-9999 SY |
| 1005 |
| Same as above |
| 10000 SY & up |
| 1006 |
| 1-1/2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 1007 |
| Same as above |
| 2000-3999 SY |
| 1008 |
| Same as above |
| 4000-5999 SY |
| 1009 |
| Same as above |
| 6000-9999 SY |
| 1010 |
| Same as above |
| 10000 SY & up |
| 1011 |
| 2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 1012 |
| Same as above |
| 2000-3999 SY |
| 1013 |
| Same as above |
| 4000-5999 SY |
| 1014 |
| Same as above |
| 6000 SY & up |
| 1015 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 6000 SY & up |
| 1016 |
| 3” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 1017 |
| Same as above |
| 2000-3999 SY |
| 1018 |
| Same as above |
| 4000-5999 SY |
| 1019 |
| Same as above |
| 6000 SY & up |
| 1020 |
| Type I Slurry Seal in accordance with CalTrans specifications, including: cleaning; preparation; removal and spraying of weeds; traffic control using cones, signs and barricades; pneumatic tire roller compaction; and all associated work. |
| 2000-5000 SY |
| 1021 |
| Same as above |
| 5,000-10,000 SY |
| 1022 |
| Same as above |
| 20,001 SY & up |
| 1023 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 5,000-10,000 SY |
| 1024 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 20,001 SY & up |
| 1025 |
| Repair/Patch AC Pavement per specs Section 02200-3.4, multiple locations (at least 1 SY ea), including sawcutting, excavation, disposal, layout, aggregate base, and all associated work as listed in item 1. |
| 50-299 SY |
| 1026 |
| Same as above |
| 300-799 SY |
| 1027 |
| Same as above |
| 800-1999 SY |
| 1028 |
| Same as above |
| 2000 SY & up |
| 1029 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 2000 SY & up |
| 1030 |
| Remove existing asphalt concrete by grinding, 4’ minimum width, 2” maximum depth, including hauling and disposal off base and all associated work. |
| 50-500 SY |
| 1031 |
| Same as above |
| 501-2000 SY |
| 1032 |
| Same as above |
| 2001-5000 SY |
| 1033 |
| Same as above |
| 5001 SY & up |
| 1034 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 5001 SY & up |
| 1035 |
| Furnish and place paving fabric for AC overlay IAW CalTrans Specs and manufacturer's recommendations, including cleaning and prep, tack coat, cones and barricades for traffic control, and all associated work. |
| 500-1999 SY |
| 1036 |
| Same as above |
| 2000-3999 SY |
| 1037 |
| Same as above |
| 4000-5999 SY |
| 1038 |
| Same as above |
| 6000 SY & up |
| 1039 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 1000 SY & up |
| 1040 |
| 4” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction. |
| 100-499 SY |
| 1041 |
| Same as above |
| 500-2000 SY |
| 1042 |
| Same as above |
| 2001 SY & up |
| 1043 |
| 6” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction. |
| 100-499 SY |
| 1044 |
| Same as above |
| 500-2000 SY |
| 1045 |
| Same as above |
| 2001 SY & up |
| 1046 |
| 6” thk layer drain rock course (1"-2 1/2" crushed) including all associated work. |
| 15 Tons & up |
| 1047 |
| Furnish & place AB shoulder backing including grading, compacting, cones, barricades, working around signs and delineators, and all associated work. |
| 45-199 Tons |
| 1048 |
| Same as above |
| 200-1000 Tons |
| 1049 |
| Same as above |
| 1001-2500 Tons |
| 1050 |
| Same as above |
| 2501 Tons & up |
| 1051 |
| Trenching for pipe or culverts in gravel or soil areas including backfill (in such a manner as to protect pipe), 90% compaction, restoration, and all associated work. |
| 4 - 20 CY |
| 1052 |
| Same as above |
| 20-100 CY |
| 1053 |
| Same as above |
| 101 CY & up |
| 1054 |
| Prepare, grade, water, compact (90%) existing gravel or ground, for paving, slab or gravel lot, 6" max. cut and/or fill, including all associated work. |
| 500-2500 SY |
| 1055 |
| Same as above |
| 2501-6000 SY |
| 1056 |
| Same as above |
| 6001 SY & up |
| 1057 |
| Load gravel or earth from pile at Beale AFB, haul (8 miles round trip max), place and compact ("fill"), including removal of surface rocks larger than 2", and all associated work. |
| 10 - 80 CY |
| 1058 |
| Same as above |
| 81 CY & up |
| 1059 |
| Excavate existing gravel or ground ("cut"), load, haul (8 miles round trip max), and stock pile at designated location at Beale AFB, including removal of surface rocks larger than 2", and all associated work. |
| 20 - 100 CY |
| 1060 |
| Same as above |
| 100 CY & up |
| 1061 |
| Crack or Joint Sealing in AC or Concrete Road - including air blast cleaning, burning or removal of weeds, measurement of daily lineal footage, and all associated work. |
| 3500-6999 LF |
| 1062 |
| Same as above |
| 7000-19999 LF |
| 1063 |
| Same as above |
| 20000 LF & up |
| 1064 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 20000 LF & up |
| 1065 |
| 2" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill. |
| 100 LF & up |
| 1066 |
| 4" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill. |
| 100 LF & up |
| 1067 |
| 12" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 1068 |
| 18" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 1069 |
| 24" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 1070 |
| Valve/utility box, (Christy B3 or approved equal) including lid, 12" extension, earthwork and connection to two conduits. |
| EA |
| 1071 |
| Raising of valve box, utility box, or manhole frame & cover 1" to 3" as req'd for AC overlay, including concrete grade rings and/or shims. |
| EA |
| 1072 |
| 12" square or round drain box (Christy V1, V9, or approved equal) including cast iron grate, 12" extension, excavation, backfill, compaction, and connection to two pipes. |
| EA |
| 1073 |
| 24" square catch basin (Christy U22 or approved equal) including cast iron traffic grate, 12" extension, excavation, backfill, compaction, and connection to two pipes. |
| EA |
| 1074 |
| Hydroseeding, Native Erosion Control Seed Mix (brome, lupine, clover) 1 lb per 1000 SF (9#/1000SY), including wood fiber and tackifier. |
| 1000-5000 SF |
| 1075 |
| Same as above |
| 5001-20,000 SF |
| 1076 |
| Same as above |
| 20,001 SF & up |
| 1077 |
| Construct 6”X14” Concrete Vertical Curb including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work. |
| 25-99 LF |
| 1078 |
| Same as above |
| 100 LF & up |
| 1079 |
| Construct 6"high X 36”wide Concrete Curb & Gutter, vertical or rolled, including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work. |
| 50-99 LF |
| 1080 |
| Same as above |
| 100 - 499 LF |
| 1081 |
| Same as above |
| 500 LF & up |
| 1082 |
| Construct concrete sidewalk or patio, 4” thick on 2” sand base, including layout, excavation up to 12" deep, subgrade prep, formwork, joints, finishing, and curing. |
| 200-999 SF |
| 1083 |
| Same as above |
| 1000 SF & up |
| 1084 |
| Construct concrete slab, 6” thick on 4” aggregate base with 6 mil plastic vapor barrier, including layout, excavation up to 12" deep, formwork, subgrade prep, finishing, joints, and curing. |
| 100-499 SF |
| 1085 |
| Same as above |
| 500 SF & up |
| 1086 |
| Remove concrete slabs/sidewalk 3"-5" thick, including hauling and disposal. |
| 100-499 SF |
| 1087 |
| Same as above |
| 500 SF & up |
| 1088 |
| Remove concrete slabs 6"-8" thick or curb & gutter (curb w/ 2.5 ft gutter = 3 SF/LF) including hauling and disposal. |
| 200-499 SF |
| 1089 |
| Same as above |
| 500 SF & up |
| 1090 |
| Remove concrete footings including rebar, hauling and disposal. |
| 10 CY & up |
| 1091 |
| Pavement markings such as crosswalks and stop lines using heated thermoplastic material including layout and traffic control |
| 24-99 SF |
| 1092 |
| Same as above |
| 100 SF & up |
| 1093 |
| Paint broken centerline-- thermoplastic, 4" wide yellow, including layout, cones and traffic control (7' dashes w/17' gaps <35 mph zones; 12' gaps w/ 36' gaps 35 mph zones or faster) |
| 1000-15,000 LF (incl gaps) |
| 1094 |
| Same as above |
| 15,001LF & up (incl gaps) |
| 1095 |
| Paint double yellow centerlines-- thermoplastic, two 4" yellow lines w/4" black line in middle including layout, cones and traffic control |
| 1000-15,000 LF |
| 1096 |
| Same as above |
| 15,001LF & up |
| 1097 |
| Paint fogline-- thermoplastic, 4" white, including layout, cones and traffic control |
| 1000-15,000 LF |
| 1098 |
| Same as above |
| 15,001LF & up |
| 1099 |
| Paint parking lot striping, such as parking spaces with 4" white lines, non-reflectorized, including layout, cones and barricades as required. |
| 50-300 SF |
| 1100 |
| Same as above |
| 301 SF & up |
| 1101 |
| Paint complete Handicap parking stall, non-reflectorized (not thermoplastic), including layout, cones and barricades as required. |
| EA |
| 1102 |
| Paint Road Striping, thermoplastic, including two foglines and centerline (double or dashed), layout, cones and traffic control. |
| 1 - 4.99 Miles |
| 1103 |
| Same as above |
| 5 Miles & up |
| 1104 |
| Reflective pavement markers (Ray-O-Lite or approved equal)-- 4" square, one-way or two-way, white or yellow and/or Non-reflective pavement markers/ "buttons" (Diamondback plastic or approved equal)-- 4" round, white or yellow. Includes layout, cones and traffic control. |
| 100 - 500 EA |
| 1105 |
| Same as above |
| 501-2000 EA |
| 1106 |
| Same as above |
| 2001 EA & up |
| 1107 |
| Traffic Control with 2 flag persons, cones, barricades, and signs as req'd to keep two-way traffic open. Note that barricades, detour signs, closed signs, and cones shall be included with respective items of work when roads or lots are closed to traffic. |
| 1/2 Day |
| 1109 |
| Fee for administration, digging permit, notifications, and all coordination for each delivery order - regardless of scope or location. See notes below. |
| EA- One Per Delivery Order |
| 1110 |
| Fee for mobilization to any location on base for each delivery order. See notes below. |
| EA |
| 1111 |
| Furnish & place white reflective paint on Runway, including markings, numbers, beads, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100,000 SF & up |
| 1112 |
| Furnish & place black outline non-reflective paint on Runway around markings or numbers, including layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 15,000 SF & up |
| 1113 |
| Furnish & place yellow reflective paint on airfield taxiways, including 6"wide taxilines, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 40,000 SF & up |
| 1114 |
| Remove runway rubber deposits from runway concrete surface, including disposal, coordination, test strip, and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100,000 SF & up |
| 1115 |
| Reseal airfield concrete joints & cracks including removal of old joint materials, refacing joint, backer rod, coordination and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 20,000 LF & up |
| 1116 |
| Furnish & place chain link fence including posts, footing, braces, fence tie-down rods at midpoint of each panel, outriggers with 3-strands barbed wire, signs every 100 yds, electric cattle wire system with supports and solar generator, grading 10-ft wide for smooth fence line, excavation for posts, creek crossings, and all miscellaneous components and fasteners IAW Specs & Plans. |
| 1000-5000 LF |
| 1117 |
| Same as above |
| 5000 LF & Up |
| 1118 |
| Furnish & place chain link fence single swing gate including framed gate with fabric, 4" gate posts with footings, braces, extended frame with 3-strands barbed wire, hinges, latches, electric cattle wire system with quick disconnect handle & hook, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 4 ft to 13 ft wide. |
| 4 ft -13 ft wide (price per foot of gate opening) |
| 1119 |
| Furnish & place chain link fence double swing gates including framed gates with fabric, 4" gate posts with footings, braces, extended frame with 3-strands barbed wire, hinges, latches, electric cattle wire system with quick disconnect handle & hook, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 13 ft to 25 ft wide. |
| 13 ft -25 ft wide (price per foot of gate opening) |
| 1120 |
| Furnish & place chain link fence rolling gate including framed gates with fabric, 4" gate posts with footings, wheels with mountings, braces, extended frame with 3-strands barbed wire, latches, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 18 ft to 30 ft wide. |
| 18 ft -30 ft wide (price per foot of gate opening) |
| 1121 |
| Repair Chain Link Fence from vehicle breach or similar damage, 40- foot section, including mobilization, demobilization, and replacing all damaged or bent fencing, such as fabric, posts, footings, outriggers, barbed wire, electric cattle wire, signs, and tying into existing fencing. |
| EA |
| 1122 |
| Add vehicle restraining 3/4"cable to Fencing Item 0116. |
| 1000-5000 LF |
| 1123 |
| Add vehicle restraining 3/4"cable to Fencing Item 0117 |
| 5000 LF & Up |
| 1124 |
| Profile Grind concrete street/pavement including removing reflectors and paint, traffic control, hauling and disposal of all waste materials off base. |
| 20,000 SY & up |
| 1125 |
| Completely remove paint on airfield concrete pavement such as 4 to 6-inch wide yellow taxi lines, including hazardous material testing, disposal of all waste, and all associated work. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100-2000 SF |
| 1126 |
| Same as above |
| 2001 SF & up |
| 1127 |
| Repair spalls in airfield concrete including saw-cutting outside perimeter of spall, jack-hammering to remove failed concrete, disposal of all debris, epoxy concrete and binder, forming new joint and sealant. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 10 -100 SF |
| 1128 |
| Same as above |
| 101 SF & up |
| 1129 |
| Install galvanized steel Bollards IAW plans including 2 footings, 2 sleeves, reflective tape, cable, 2 padlocks, powdercoat finish, 6”deep x20”wide concrete band, traffic control barricades and signs, and all associated work. |
| 10 EA & Up |
See Notes for Base Year above.
OPTION YEAR 2
| ITEM |
| SUPPLIES/SERVICES |
| BASIS FOR UNIT PRICE |
| KTR'S BID UNIT PRICE |
| 2001 |
| 1” thick Asphalt Concrete overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 2002 |
| Same as above |
| 2000-3999 SY |
| 2003 |
| Same as above |
| 4000-5999 SY |
| 2004 |
| Same as above |
| 6000-9999 SY |
| 2005 |
| Same as above |
| 10000 SY & up |
| 2006 |
| 1-1/2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 2007 |
| Same as above |
| 2000-3999 SY |
| 2008 |
| Same as above |
| 4000-5999 SY |
| 2009 |
| Same as above |
| 6000-9999 SY |
| 2010 |
| Same as above |
| 10000 SY & up |
| 2011 |
| 2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 2012 |
| Same as above |
| 2000-3999 SY |
| 2013 |
| Same as above |
| 4000-5999 SY |
| 2014 |
| Same as above |
| 6000 SY & up |
| 2015 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 6000 SY & up |
| 2016 |
| 3” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 2017 |
| Same as above |
| 2000-3999 SY |
| 2018 |
| Same as above |
| 4000-5999 SY |
| 2019 |
| Same as above |
| 6000 SY & up |
| 2020 |
| Type I Slurry Seal in accordance with CalTrans specifications, including: cleaning; preparation; removal and spraying of weeds; traffic control using cones, signs and barricades; pneumatic tire roller compaction; and all associated work. |
| 2000-5000 SY |
| 2021 |
| Same as above |
| 5,000-10,000 SY |
| 2022 |
| Same as above |
| 20,001 SY & up |
| 2023 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 5,000-10,000 SY |
| 2024 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 20,001 SY & up |
| 2025 |
| Repair/Patch AC Pavement per specs Section 02200-3.4, multiple locations (at least 1 SY ea), including sawcutting, excavation, disposal, layout, aggregate base, and all associated work as listed in item 1. |
| 50-299 SY |
| 2026 |
| Same as above |
| 300-799 SY |
| 2027 |
| Same as above |
| 800-1999 SY |
| 2028 |
| Same as above |
| 2000 SY & up |
| 2029 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 2000 SY & up |
| 2030 |
| Remove existing asphalt concrete by grinding, 4’ minimum width, 2” maximum depth, including hauling and disposal off base and all associated work. |
| 50-500 SY |
| 2031 |
| Same as above |
| 501-2000 SY |
| 2032 |
| Same as above |
| 2001-5000 SY |
| 2033 |
| Same as above |
| 5001 SY & up |
| 2034 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 5001 SY & up |
| 2035 |
| Furnish and place paving fabric for AC overlay IAW CalTrans Specs and manufacturer's recommendations, including cleaning and prep, tack coat, cones and barricades for traffic control, and all associated work. |
| 500-1999 SY |
| 2036 |
| Same as above |
| 2000-3999 SY |
| 2037 |
| Same as above |
| 4000-5999 SY |
| 2038 |
| Same as above |
| 6000 SY & up |
| 2039 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 1000 SY & up |
| 2040 |
| 4” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction. |
| 100-499 SY |
| 2041 |
| Same as above |
| 500-2000 SY |
| 2042 |
| Same as above |
| 2001 SY & up |
| 2043 |
| 6” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction. |
| 100-499 SY |
| 2044 |
| Same as above |
| 500-2000 SY |
| 2045 |
| Same as above |
| 2001 SY & up |
| 2046 |
| 6” thk layer drain rock course (1"-2 1/2" crushed) including all associated work. |
| 15 Tons & up |
| 2047 |
| Furnish & place AB shoulder backing including grading, compacting, cones, barricades, working around signs and delineators, and all associated work. |
| 45-199 Tons |
| 2048 |
| Same as above |
| 200-1000 Tons |
| 2049 |
| Same as above |
| 1001-2500 Tons |
| 2050 |
| Same as above |
| 2501 Tons & up |
| 2051 |
| Trenching for pipe or culverts in gravel or soil areas including backfill (in such a manner as to protect pipe), 90% compaction, restoration, and all associated work. |
| 4 - 20 CY |
| 2052 |
| Same as above |
| 20-100 CY |
| 2053 |
| Same as above |
| 101 CY & up |
| 2054 |
| Prepare, grade, water, compact (90%) existing gravel or ground, for paving, slab or gravel lot, 6" max. cut and/or fill, including all associated work. |
| 500-2500 SY |
| 2055 |
| Same as above |
| 2501-6000 SY |
| 2056 |
| Same as above |
| 6001 SY & up |
| 2057 |
| Load gravel or earth from pile at Beale AFB, haul (8 miles round trip max), place and compact ("fill"), including removal of surface rocks larger than 2", and all associated work. |
| 10 - 80 CY |
| 2058 |
| Same as above |
| 81 CY & up |
| 2059 |
| Excavate existing gravel or ground ("cut"), load, haul (8 miles round trip max), and stock pile at designated location at Beale AFB, including removal of surface rocks larger than 2", and all associated work. |
| 20 - 100 CY |
| 2060 |
| Same as above |
| 100 CY & up |
| 2061 |
| Crack or Joint Sealing in AC or Concrete Road - including air blast cleaning, burning or removal of weeds, measurement of daily lineal footage, and all associated work. |
| 3500-6999 LF |
| 2062 |
| Same as above |
| 7000-19999 LF |
| 2063 |
| Same as above |
| 20000 LF & up |
| 2064 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 20000 LF & up |
| 2065 |
| 2" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill. |
| 100 LF & up |
| 2066 |
| 4" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill. |
| 100 LF & up |
| 2067 |
| 12" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 2068 |
| 18" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 2069 |
| 24" CSP x 16 ga including couplings and connections, not including trenching & backfill. |
| 20 LF & up |
| 2070 |
| Valve/utility box, (Christy B3 or approved equal) including lid, 12" extension, earthwork and connection to two conduits. |
| EA |
| 2071 |
| Raising of valve box, utility box, or manhole frame & cover 1" to 3" as req'd for AC overlay, including concrete grade rings and/or shims. |
| EA |
| 2072 |
| 12" square or round drain box (Christy V1, V9, or approved equal) including cast iron grate, 12" extension, excavation, backfill, compaction, and connection to two pipes. |
| EA |
| 2073 |
| 24" square catch basin (Christy U22 or approved equal) including cast iron traffic grate, 12" extension, excavation, backfill, compaction, and connection to two pipes. |
| EA |
| 2074 |
| Hydroseeding, Native Erosion Control Seed Mix (brome, lupine, clover) 1 lb per 1000 SF (9#/1000SY), including wood fiber and tackifier. |
| 1000-5000 SF |
| 2075 |
| Same as above |
| 5001-20,000 SF |
| 2076 |
| Same as above |
| 20,001 SF & up |
| 2077 |
| Construct 6”X14” Concrete Vertical Curb including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work. |
| 25-99 LF |
| 2078 |
| Same as above |
| 100 LF & up |
| 2079 |
| Construct 6"high X 36”wide Concrete Curb & Gutter, vertical or rolled, including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work. |
| 50-99 LF |
| 2080 |
| Same as above |
| 100 - 499 LF |
| 2081 |
| Same as above |
| 500 LF & up |
| 2082 |
| Construct concrete sidewalk or patio, 4” thick on 2” sand base, including layout, excavation up to 12" deep, subgrade prep, formwork, joints, finishing, and curing. |
| 200-999 SF |
| 2083 |
| Same as above |
| 1000 SF & up |
| 2084 |
| Construct concrete slab, 6” thick on 4” aggregate base with 6 mil plastic vapor barrier, including layout, excavation up to 12" deep, formwork, subgrade prep, finishing, joints, and curing. |
| 100-499 SF |
| 2085 |
| Same as above |
| 500 SF & up |
| 2086 |
| Remove concrete slabs/sidewalk 3"-5" thick, including hauling and disposal. |
| 100-499 SF |
| 2087 |
| Same as above |
| 500 SF & up |
| 2088 |
| Remove concrete slabs 6"-8" thick or curb & gutter (curb w/ 2.5 ft gutter = 3 SF/LF) including hauling and disposal. |
| 200-499 SF |
| 2089 |
| Same as above |
| 500 SF & up |
| 2090 |
| Remove concrete footings including rebar, hauling and disposal. |
| 10 CY & up |
| 2091 |
| Pavement markings such as crosswalks and stop lines using heated thermoplastic material including layout and traffic control |
| 24-99 SF |
| 2092 |
| Same as above |
| 100 SF & up |
| 2093 |
| Paint broken centerline-- thermoplastic, 4" wide yellow, including layout, cones and traffic control (7' dashes w/17' gaps <35 mph zones; 12' gaps w/ 36' gaps 35 mph zones or faster) |
| 1000-15,000 LF (incl gaps) |
| 2094 |
| Same as above |
| 15,001LF & up (incl gaps) |
| 2095 |
| Paint double yellow centerlines-- thermoplastic, two 4" yellow lines w/4" black line in middle including layout, cones and traffic control |
| 1000-15,000 LF |
| 2096 |
| Same as above |
| 15,001LF & up |
| 2097 |
| Paint fogline-- thermoplastic, 4" white, including layout, cones and traffic control |
| 1000-15,000 LF |
| 2098 |
| Same as above |
| 15,001LF & up |
| 2099 |
| Paint parking lot striping, such as parking spaces with 4" white lines, non-reflectorized, including layout, cones and barricades as required. |
| 50-300 SF |
| 2100 |
| Same as above |
| 301 SF & up |
| 2101 |
| Paint complete Handicap parking stall, non-reflectorized (not thermoplastic), including layout, cones and barricades as required. |
| EA |
| 2102 |
| Paint Road Striping, thermoplastic, including two foglines and centerline (double or dashed), layout, cones and traffic control. |
| 1 - 4.99 Miles |
| 2103 |
| Same as above |
| 5 Miles & up |
| 2104 |
| Reflective pavement markers (Ray-O-Lite or approved equal)-- 4" square, one-way or two-way, white or yellow and/or Non-reflective pavement markers/ "buttons" (Diamondback plastic or approved equal)-- 4" round, white or yellow. Includes layout, cones and traffic control. |
| 100 - 500 EA |
| 2105 |
| Same as above |
| 501-2000 EA |
| 2106 |
| Same as above |
| 2001 EA & up |
| 2107 |
| Traffic Control with 2 flag persons, cones, barricades, and signs as req'd to keep two-way traffic open. Note that barricades, detour signs, closed signs, and cones shall be included with respective items of work when roads or lots are closed to traffic. |
| 1/2 Day |
| 2109 |
| Fee for administration, digging permit, notifications, and all coordination for each delivery order - regardless of scope or location. See notes below. |
| EA- One Per Delivery Order |
| 2110 |
| Fee for mobilization to any location on base for each delivery order. See notes below. |
| EA |
| 2111 |
| Furnish & place white reflective paint on Runway, including markings, numbers, beads, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100,000 SF & up |
| 2112 |
| Furnish & place black outline non-reflective paint on Runway around markings or numbers, including layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 15,000 SF & up |
| 2113 |
| Furnish & place yellow reflective paint on airfield taxiways, including 6"wide taxilines, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 40,000 SF & up |
| 2114 |
| Remove runway rubber deposits from runway concrete surface, including disposal, coordination, test strip, and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100,000 SF & up |
| 2115 |
| Reseal airfield concrete joints & cracks including removal of old joint materials, refacing joint, backer rod, coordination and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 20,000 LF & up |
| 2116 |
| Furnish & place chain link fence including posts, footing, braces, fence tie-down rods at midpoint of each panel, outriggers with 3-strands barbed wire, signs every 100 yds, electric cattle wire system with supports and solar generator, grading 10-ft wide for smooth fence line, excavation for posts, creek crossings, and all miscellaneous components and fasteners IAW Specs & Plans. |
| 1000-5000 LF |
| 2117 |
| Same as above |
| 5000 LF & Up |
| 2118 |
| Furnish & place chain link fence single swing gate including framed gate with fabric, 4" gate posts with footings, braces, extended frame with 3-strands barbed wire, hinges, latches, electric cattle wire system with quick disconnect handle & hook, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 4 ft to 13 ft wide. |
| 4 ft -13 ft wide (price per foot of gate opening) |
| 2119 |
| Furnish & place chain link fence double swing gates including framed gates with fabric, 4" gate posts with footings, braces, extended frame with 3-strands barbed wire, hinges, latches, electric cattle wire system with quick disconnect handle & hook, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 13 ft to 25 ft wide. |
| 13 ft -25 ft wide (price per foot of gate opening) |
| 2120 |
| Furnish & place chain link fence rolling gate including framed gates with fabric, 4" gate posts with footings, wheels with mountings, braces, extended frame with 3-strands barbed wire, latches, excavation for posts, a sign, and all miscellaneous components and fasteners IAW Specs & Plans. This item to be paid per foot of gate opening 18 ft to 30 ft wide. |
| 18 ft -30 ft wide (price per foot of gate opening) |
| 2121 |
| Repair Chain Link Fence from vehicle breach or similar damage, 40- foot section, including mobilization, demobilization, and replacing all damaged or bent fencing, such as fabric, posts, footings, outriggers, barbed wire, electric cattle wire, signs, and tying into existing fencing. |
| EA |
| 2122 |
| Add vehicle restraining 3/4"cable to Fencing Item 0116. |
| 1000-5000 LF |
| 2123 |
| Add vehicle restraining 3/4"cable to Fencing Item 0117 |
| 5000 LF & Up |
| 2124 |
| Profile Grind concrete street/pavement including removing reflectors and paint, traffic control, hauling and disposal of all waste materials off base. |
| 20,000 SY & up |
| 2125 |
| Completely remove paint on airfield concrete pavement such as 4 to 6-inch wide yellow taxi lines, including hazardous material testing, disposal of all waste, and all associated work. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 100-2000 SF |
| 2126 |
| Same as above |
| 2001 SF & up |
| 2127 |
| Repair spalls in airfield concrete including saw-cutting outside perimeter of spall, jack-hammering to remove failed concrete, disposal of all debris, epoxy concrete and binder, forming new joint and sealant. Work to be performed after hours, on weekends, or when the airfield is closed. |
| 10 -100 SF |
| 2128 |
| Same as above |
| 101 SF & up |
| 2129 |
| Install galvanized steel Bollards IAW plans including 2 footings, 2 sleeves, reflective tape, cable, 2 padlocks, powdercoat finish, 6”deep x20”wide concrete band, traffic control barricades and signs, and all associated work. |
| 10 EA & Up |
OPTION YEAR 3
| ITEM |
| SUPPLIES/SERVICES |
| BASIS FOR UNIT PRICE |
| KTR'S BID UNIT PRICE |
| 3001 |
| 1” thick Asphalt Concrete overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 3002 |
| Same as above |
| 2000-3999 SY |
| 3003 |
| Same as above |
| 4000-5999 SY |
| 3004 |
| Same as above |
| 6000-9999 SY |
| 3005 |
| Same as above |
| 10000 SY & up |
| 3006 |
| 1-1/2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 3007 |
| Same as above |
| 2000-3999 SY |
| 3008 |
| Same as above |
| 4000-5999 SY |
| 3009 |
| Same as above |
| 6000-9999 SY |
| 3010 |
| Same as above |
| 10000 SY & up |
| 3011 |
| 2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 3012 |
| Same as above |
| 2000-3999 SY |
| 3013 |
| Same as above |
| 4000-5999 SY |
| 3014 |
| Same as above |
| 6000 SY & up |
| 3015 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 6000 SY & up |
| 3016 |
| 3” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work. |
| 500-1999 SY |
| 3017 |
| Same as above |
| 2000-3999 SY |
| 3018 |
| Same as above |
| 4000-5999 SY |
| 3019 |
| Same as above |
| 6000 SY & up |
| 3020 |
| Type I Slurry Seal in accordance with CalTrans specifications, including: cleaning; preparation; removal and spraying of weeds; traffic control using cones, signs and barricades; pneumatic tire roller compaction; and all associated work. |
| 2000-5000 SY |
| 3021 |
| Same as above |
| 5,000-10,000 SY |
| 3022 |
| Same as above |
| 20,001 SY & up |
| 3023 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 5,000-10,000 SY |
| 3024 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 20,001 SY & up |
| 3025 |
| Repair/Patch AC Pavement per specs Section 02200-3.4, multiple locations (at least 1 SY ea), including sawcutting, excavation, disposal, layout, aggregate base, and all associated work as listed in item 1. |
| 50-299 SY |
| 3026 |
| Same as above |
| 300-799 SY |
| 3027 |
| Same as above |
| 800-1999 SY |
| 3028 |
| Same as above |
| 2000 SY & up |
| 3029 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 2000 SY & up |
| 3030 |
| Remove existing asphalt concrete by grinding, 4’ minimum width, 2” maximum depth, including hauling and disposal off base and all associated work. |
| 50-500 SY |
| 3031 |
| Same as above |
| 501-2000 SY |
| 3032 |
| Same as above |
| 2001-5000 SY |
| 3033 |
| Same as above |
| 5001 SY & up |
| 3034 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 5001 SY & up |
| 3035 |
| Furnish and place paving fabric for AC overlay IAW CalTrans Specs and manufacturer's recommendations, including cleaning and prep, tack coat, cones and barricades for traffic control, and all associated work. |
| 500-1999 SY |
| 3036 |
| Same as above |
| 2000-3999 SY |
| 3037 |
| Same as above |
| 4000-5999 SY |
| 3038 |
| Same as above |
| 6000 SY & up |
| 3039 |
| Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed. |
| 1000 SY & up |
| 3040 |
| 4” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction. |
| 100-499 SY |
| 3041 |
| Same as above |
| 500-2000 SY |
| 3042 |
| Same as above |
| 2001 SY & up |