This is Amendment 0002 to Solicitation FA466426Q0009 for Commercial Internet Service Provider (C-ISP) requirements, issued by the 452nd Missile Support Group at March Air Reserve Base, California on August 28, 2026. The amendment addresses eleven frequently asked questions regarding the OG Wi-Fi solicitation and clarifies contractor responsibilities for providing 1 Gigabit per second (Gbps) Dedicated Internet Access service.
The core requirement is delivery of a 1 Gbps symmetrical internet circuit with a direct multi-mode fiber LC SFP handoff into the base Dial Control Office (DCO) frame room located in Building 2407. The contractor is responsible only for establishing the active 1 Gbps circuit signal at the DCO demarcation point; the Air Force will manage all internal routers, firewalls, switches, cabling, and Wi-Fi hardware. Service must include a static /29 IPv4 subnet block (1 internal and 4 usable public IP addresses), 24/7 technical support, 99.99% network reliability, and a 4-hour Mean Time to Repair for outage resolution. This is a commercial acquisition under FAR Part 12/Part 13 simplified procedures with award to be made on a Lowest Price Technically Acceptable (LPTA) basis. No pre-bid site visit is scheduled, though a post-award site visit may be conducted once awarded. Contracting officers are Robert Miller (marissa.lopez.5@us.af.mil, 951-655-5386) and Joshua Davidson (joshua.davidson.16@us.af.mil, 951-655-5781).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA466426Q00090001 SF 30.pdf | ||
| final PWS.pdf | ||
| Solicitation - FA466426Q0009_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
28 Aug 2026
4. REQUISITION/PURCHASE
REQUISITION NUMBER
5. PROJECT NUMBER (if applicable)
6. ISSUED BY CODE FA4664
FA4664 452 MSG PK
1261 GRAEBER ST BLDG 2313 STE 118, MARCH ARB CA 92518-1716
MARCH ARB, CA 92518-1716
UNITED STATES
ROBERT MILLER, Email: marissa.lopez.5@us.af.mil Telephone: (951) 655-5386 JOSHUA DAVIDSON, Email: joshua.davidson.16@us.af.mil Telephone: 951-655-5781
7. ADMINISTERED BY (if other than Item 6)
CODE
SCD: PAS:
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
CODE: FACILITY CODE:
9A. AMENDMENT OF SOLICITATION NUMBER
FA466426Q0009
9B. DATED (SEE ITEM 11)
19 Aug 2026
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK
ONE
A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is in regard to responses regarding the questions for OG WI-FI Solicitation FA466426Q0009.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Joshua Davidson
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
01 Sep 2026
Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA-FAR (48 CFR) 53.243
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following modifications were made:
Information From To Solicitation Number FA466426Q00090001 FA466426Q00090002
Instructions, Conditions, & Notices to Offerors or Quoters
Header Miscellaneous Text (Modified):
Responses below regarding the questions for Solicitation FA466426Q0009:
1. Does "1 GB" mean a 1 Gbps internet connection?
- Response: Yes. The Performance Work Statement (PWS) explicitly requires "internet services capable of download speeds at a rate of 1 Gb or greater, on a 1Gb circuit." Frontier will provide a 1 Gbps Dedicated Internet Access (DIA) circuit.
2. Is symmetrical 1 Gbps upload and download required?
- Response: Dedicated Internet Access from Frontier is natively 1 Gbps download / 1 Gbps upload symmetrical service. While the PWS highlights download throughput ("download speeds at a rate of 1 Gb or greater"), our quoted 1G DIA circuit fulfills both download and upload requirements without issue.
3. Is a dedicated connection required, or is commercial shared broadband acceptable?
- Response: A dedicated connection is required and being provided. The PWS requires a direct multi-mode fiber LC SFP hand-off into the base Dial Control Office (DCO) frame room. Frontier has quoted a dedicated 1 Gbps DIA circuit.
4. Is the contractor responsible for furnishing and installing the router, firewall, switches, wireless access points, cabling, and related equipment?
- Response: No. The contractor is only responsible for providing and installing the equipment required to establish the active 1
Gbps circuit signal in the base Dial Control Office (DCO) terminated via multi-mode fiber LC SFP. The Air Force connects their own equipment directly to this SFP hand-off and manages all internal routers, firewalls, switches, cabling, and Wi-Fi hardware.
5. How many rooms, users, devices, or square feet require wireless coverage?
- Response: Not applicable to the contractor. Frontier is solely delivering the 1 Gbps circuit hand-off to the DCO demarcation
FA466426Q00090002
point (Bldg 2407, Room TELCO FRAME). The Air Force handles all internal base distribution and wireless coverage across their own infrastructure.
6. Are static IP addresses, content filtering, network monitoring, or other managed services required?
- Response: Frontier's 1G DIA service includes a static /29 IPv4 subnet block (1 internal and 4 usable public IP addresses) at the DCO hand-off. Content filtering, network security monitoring, and internal traffic management are handled directly by the Air
Force under their DISA STIG guidelines referenced in the PWS. No additional vendor-managed services are required.
7. What uptime, technical support, and outage response requirements apply?
- Response: Frontier provides 24/7 technical support backed by our Service Level Agreement (SLA), which includes 99.99% network reliability and a 4-hour Mean Time to Repair (MTTR) for outage resolution. This standard fully meets and exceeds the government's operational requirements.
8. Please provide the referenced Statement of Work, Performance Work Statement, and Mission-Essential Contractor Services attachment, if these are separate documents.
- Response: The 1-page document titled "Baseline Commercial Internet Service Provider (C-ISP) Requirements for AFRC
Aircrew and Operations Commercial Mobile Device Users" is the official PWS.
9. Please confirm the required quote submission method and all documents that must accompany the completed SF 1449.
- Response: Frontier has already compiled and submitted our complete proposal package via email to Contracting Officers
Robert Miller (robert.miller.212@us.af.mil) and Marissa Lopez (marissa.lopez.5@us.af.mil) on 8/24/2026.
10. Please provide the evaluation factors that will be used to select the awardee.
- Response: As a commercial acquisition under FAR Part 12 / Part 13 simplified procedures, award will be made on a Lowest
Price Technically Acceptable (LPTA) basis. Evaluation is based on technical compliance with the PWS (1 Gbps multi-mode LC
SFP hand-off + 24-hr response SLA) and the lowest Total Evaluated Price across all option years.
11. Is there a site visit scheduled or available?
- Response: No formal pre-bid site visit is scheduled in the solicitation. Once the project is awarded and a Frontier Project
Manager is appointed, they will evaluate the operational requirements and determine if a post-award site visit is required to complete any necessary installation work.
FA466426Q00090002
mailto:robert.miller.212@us.af.mil mailto:marissa.lopez.5@us.af.mil
FA466426Q00090002
| SUMMARY OF CHANGES |
| Solicitation/Contract Form |
| Instructions, Conditions, & Notices to Offerors or Quoters |
File details come from the government source that posted it. Updated .