Response to RFI - Solicitation FA464-20-Q-0007.pdf
PDF 78 KB Posted
- Attached to
- Hangar Fall Protection Inspection Services Federal contract opportunity
- Solicitation number
- FA4664-20-Q-0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA466420Q0007.pdf | ||
| Wage Determination No. 2015-5629 Rev 12, Dec 23, 2019.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 28, 2020
Response to RFI (Request for Information) Solicitation FA4664-20-Q-0007, Hangar Fall Protection Inspection
Question 1: Do you have signed and sealed drawings and calculations for the fall protection systems referenced in the solicitation?
Answer 1: No
Question 2: How much equipment is to be inspected Answer 2: There are 3 systems, 1 in each hangar with 23 anchorage points.
Question 3: How many fall restraint devices in total need inspected?
Answer 3: There are 3 systems, 1 in each hangar with 23 anchorage points.
Question 4: Will a standard scissor lift of ~25’ reach be adequate? Will there be clear access for a scissor lift to access all restraint devices?
Answer 4: Yes, a scissor lift will be necessary and the systems will be available for inspection when coordinated with point of contact (POC).
Question 5: Please provide a list of equipment and quantities of items to be inspected (i.e.
linear feet of railings and components, quantity of fall arresters to be inspected and re-certified, quantity of lanyards and harnesses).
Answer 5: Brand is in the Statement of Work (SOW) and quantities are 3 systems, 1 each in in three different hangers, 23 anchorage points to be tested. Lanyards and harnesses have not been requested to be inspected.
Question 6: Would it be possible to provide a recent inspection record? This will help estimate existing current conditions and could impact the length of inspections Answer 6: No
Question 7: Will there be any additional resources needed to gain access to areas of inspection beyond an 8-foot ladder (i.e. scissor lift/cherry picker)?
Answer 7. Scissor lift required.
NOTE: Effective as of the time of this posting, no more RFIs will be accepted to allow enough time for the submission of proposals.