Drawings_Maintain_Exterior_Surfaces_of_Historic_Hangar_429.pdf

PDF 4 MB Posted

Attached to
Maintain Exterior Paint Bldg 429
Solicitation number
FA466419BA006
Issued by

About this file

Attachment 5. Drawings

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

�-r=r a '9 N f.-� iiii-

I iiii i i i i i i i i

I I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I II I I I

I I II I I II I II I II "

II I I II I I II I II I II II

i i -

II II II II II II I II I II I II I I II I I II I I II I II I II I

II II II II II II I II I II I II I I II I I II I I II I II I II I II

i i i i i - i i

11_6

:-.. E_ L_E_V_A_T_IO_N _____ 0

EJ i i i iiii i i i i iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii I i i-i i i i i-i i i i i-i i i i i-i i iiii

_1 E_ 11�-.. �-1�_0 ,,_E _L E_ V_ A_T_ I_O_N ____ -----<0

. -20'

I' iiii T � f.- N�

�---------------152'-1" ----------------------r

�-�-.�-.!- .�_E _LE_V_A_T_I_O_N __ ----{®

iiii iiiiiiiiiiii iiiiiiiiiiii iiii -y � f.- N�

_ 1 _�-�-=�-.!-.� _E_ L_E _V_A_T _I _O _N __ ---i(D j j

1 LOW FLAT ROOF 1

1 HIGH SLOPED ROOF 1

j HIGH SLOPED ROOF j j LOW FLAT ROOF j

-,1 �-.. �-�--�·-I N_G_42_9_R_O_O_F_P_ L_A _ N_-----<

CD

VACIN ITY MAP

CACTUS

Q� MEYER ��.----

�1' PROJECT

15'� ��LOCATION

PLAN LEGEND

A-1 ROOF PLAN & ELEVATIONS

A-2 NORTH ELEVATION PHOTOS

A-3 SOUTH ELEVATION PHOTOS

A-4 EAST ELEVATION PHOTOS

A-5 WEST ELEVATION PHOTOS

j j

MARCH ARB

452nd MSG / CECE 610 Meyer Drive Building 2403

ALL IDEAS, DESIGNS AND ARRANGEMENTS

INDICATED ON THESE DRAWINGS ARE THE

PROPERTY oF 452nd MSG/CECE, AND ARE INTENDED TO BE USED IN

CONNECTION Willi THIS SPECIFIC

PROJECT ONLY AND SHALL NOT

OTHERWISE BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE WRITTEN

CONSENT OF THE ARCHITECT

THERE SHALL BE NO CHANGES OR

DEVIATIONS FROM THESE DRAWINGS

OR ACCOMPANYING

SPECIFICATIONS WITHOUT THE WRITTEN

CONSENT OF THE ARCHITECT.

ci::

LU

z i:.:

LU

a.

I-c:::

a_

(9 z

I-z

O') C'J

(9 z

_J cc cii Cl)

LU

0::

CX)

C'J O')

Q.) <( :0 (_)

� a::i Q.) c:::

cc :r:

:2:

JOB NUMBER:

SCALE: See Detail

DATE: 08-05-2019

DRAWN BY: GM

REMARKS

SHEET TITLE:

FLOOR PLAN &

ELEVATIONS

SHEET NUMBER:

A-1

Attachment 5 to FA466419BA006 Page 1 of Page 5

SPECIFIC REQUIREMENTS OF PROJECT HANGER 429

1. Remove and dispose of all cables, wires, pipes, conduit, junction boxes or mounting hardware, which are severed, disconnected, capped or otherwise no longer in use. Conduits with old, out of service wires shall be cut back as far as possible and terminated with a junction box.

2. Contractor shall relocate 3 antenna on west side of building to roof lips

3. Remove doors installed in the hanger doors, repair siding back to existing.

replace all hanger door siding back to original historic siding by prefabricating corrugated siding to match the original historic siding.

4. Contractor shall remove and replace approximately 68+ broken or blocked window panes. Most panes are 14” x 20” but sizes may vary.

Contractor shall replace windows with hammered or flat chicken wire glass that are reinforced by backing. Install 5 new windows including 5 fabricated sashes (if needed) and 30 chicken wire window panes within them.

5. Repair and seal all holes, cracks, spalls and voids in exterior surfaces with products suitable for existing materials.

6. Prepare all currently painted surfaces to accept primer and paint. Remove paint from all windows. Remove dirt, rust/corrosion, splinters, loose particles, grease, oil, disintegrated coatings, blistering/cracking/flaking/peeling coatings and other foreign matter and substances deleterious to coating performance before application of primer, paint and/or any other surface treatments.

7. Paint all exterior surfaces IAW the specifications in 09 90 00 - SPECIFICATION PAINTS AND COATINGS HISTORIC BUILDINGS with one coat of primer and two coats of paint. Surfaces to be painted include stucco, masonry, metal siding and flashings, wood and metal surfaces, pipes and conduits, hangar doors and door frames, roll up door, HVAC equipment and stands, gutters, downspouts, window panes and any other surfaces which are currently painted.

8. Repair and repaint the building numbers to match original color, font and size. March Air Reserve Base has standard colors and colors shall not be attempted to be matched with digital reproductions. The only approved color match for all exterior colors will be as described in the FEP March ARB June 2016 Signed (FEP). The colors for this building are Antique Linen and Tobacco Brown. A sample will be signed out to the contractor to get a match.

The contractor will then return the sample given to them, and the Base Civil Engineer or representative will make a color match determination for approval or disapproval.

REMOVE DOORS

IN HANGER DOOR

Attachment 5 to FA466419BA006 Page 2 of Page 5

1261479148C Line

1261479148C Line mounting hardware, which are severed, disconnected, capped or otherwise no longer in use. Conduits with old, out of service wires shall be cut back as far as possible and terminated with a junction box.

2. Contractor shall relocate 3 antenna on west side of building to roof lips

3. Remove doors installed in the hanger doors, repair siding back to existing.

replace all hanger door siding back to original historic siding by prefabricating corrugated siding to match the original historic siding.

4. Contractor shall remove and replace approximately 68+ broken or blocked window panes. Most panes are 14” x 20” but sizes may vary. Contractor shall replace windows with hammered or flat chicken wire glass that are reinforced by backing. Install 5 new windows including 5 fabricated sashes (if needed) and 30 chicken wire window panes within them.

5. Repair and seal all holes, cracks, spalls and voids in exterior surfaces with products suitable for existing materials.

6. Prepare all currently painted surfaces to accept primer and paint. Remove paint from all windows. Remove dirt, rust/corrosion, splinters, loose particles, grease, oil, disintegrated coatings, blistering/cracking/flaking/peeling coatings and other foreign matter and substances deleterious to coating performance before application of primer, paint and/or any other surface treatments.

7. Paint all exterior surfaces IAW the specifications in 09 90 00 - SPECIFICATION PAINTS AND COATINGS HISTORIC BUILDINGS with one coat of primer and two coats of paint. Surfaces to be painted include stucco, masonry, metal siding and flashings, wood and metal surfaces, pipes and conduits, hangar doors and door frames, roll up door, HVAC equipment and stands, gutters, downspouts, window panes and any other surfaces which are currently painted.

8. Repair and repaint the building numbers to match original color, font and size. March Air Reserve Base has standard colors and colors shall not be attempted to be matched with digital reproductions. The only approved color match for all exterior colors will be as described in the FEP March ARB June 2016 Signed (FEP). The colors for this building are Antique Linen and Tobacco Brown. A sample will be signed out to the contractor to get a match. The contractor will then return the sample given to them, and the Base Civil Engineer or representative will make a color match determination for approval or disapproval.

NOT TO BE

PAINTED

Attachment 5 to FA466419BA006 Page 3 of Page 5

1261479148C Line

1. Remove and dispose of all cables, wires, pipes, conduit, junction boxes or mounting hardware, which are severed, disconnected, capped or otherwise no longer in use. Conduits with old, out of service wires shall be cut back as far as possible and terminated with a junction box.

2. Contractor shall relocate 3 antenna on west side of building to roof lips

3. Remove doors installed in the hanger doors, repair siding back to existing. replace all hanger door siding back to original historic siding by prefabricating corrugated siding to match the original historic siding.

4. Contractor shall remove and replace approximately 68+ broken or blocked window panes.

Most panes are 14” x 20” but sizes may vary. Contractor shall replace windows with hammered or flat chicken wire glass that are reinforced by backing. Install 5 new windows including 5 fabricated sashes (if needed) and 30 chicken wire window panes within them.

5. Repair and seal all holes, cracks, spalls and voids in exterior surfaces with products suitable for existing materials.

6. Prepare all currently painted surfaces to accept primer and paint. Remove paint from all windows. Remove dirt, rust/corrosion, splinters, loose particles, grease, oil, disintegrated coatings, blistering/cracking/flaking/peeling coatings and other foreign matter and substances deleterious to coating performance before application of primer, paint and/or any other surface treatments.

7. Paint all exterior surfaces IAW the specifications in 09 90 00 - SPECIFICATION PAINTS AND COATINGS HISTORIC BUILDINGS with one coat of primer and two coats of paint.

Surfaces to be painted include stucco, masonry, metal siding and flashings, wood and metal surfaces, pipes and conduits, hangar doors and door frames, roll up door, HVAC equipment and stands, gutters, downspouts, window panes and any other surfaces which are currently painted.

8. Repair and repaint the building numbers to match original color, font and size. March Air Reserve Base has standard colors and colors shall not be attempted to be matched with digital reproductions. The only approved color match for all exterior colors will be as described in the FEP March ARB June 2016 Signed (FEP). The colors for this building are Antique Linen and Tobacco Brown. A sample will be signed out to the contractor to get a match. The contractor will then return the sample given to them, and the Base Civil Engineer or representative will make a color match determination for approval or disapproval.

BLOCKED DORMER WINDOWS

BLOCKED WINDOWS SOUTH END BLOCKED WINDOWS NOTH END

Attachment 5 to FA466419BA006 Page 4 of Page 5 mounting hardware, which are severed, disconnected, capped or otherwise no longer in use. Conduits with old, out of service wires shall be cut back as far as possible and terminated with a junction box.

2. Contractor shall relocate 3 antenna on west side of building to roof lips

3. Remove doors installed in the hanger doors, repair siding back to existing.

replace all hanger door siding back to original historic siding by prefabricating corrugated siding to match the original historic siding.

4. Contractor shall remove and replace approximately 68+ broken or blocked window panes. Most panes are 14” x 20” but sizes may vary. Contractor shall replace windows with hammered or flat chicken wire glass that are reinforced by backing. Install 5 new windows including 5 fabricated sashes (if needed) and 30 chicken wire window panes within them.

5. Repair and seal all holes, cracks, spalls and voids in exterior surfaces with products suitable for existing materials.

6. Prepare all currently painted surfaces to accept primer and paint. Remove paint from all windows. Remove dirt, rust/corrosion, splinters, loose particles, grease, oil, disintegrated coatings, blistering/cracking/flaking/peeling coatings and other foreign matter and substances deleterious to coating performance before application of primer, paint and/or any other surface treatments.

7. Paint all exterior surfaces IAW the specifications in 09 90 00 - SPECIFICATION PAINTS AND COATINGS HISTORIC BUILDINGS with one coat of primer and two coats of paint. Surfaces to be painted include stucco, masonry, metal siding and flashings, wood and metal surfaces, pipes and conduits, hangar doors and door frames, roll up door, HVAC equipment and stands, gutters, downspouts, window panes and any other surfaces which are currently painted.

8. Repair and repaint the building numbers to match original color, font and size.

March Air Reserve Base has standard colors and colors shall not be attempted to be matched with digital reproductions. The only approved color match for all exterior colors will be as described in the FEP March ARB June 2016 Signed (FEP). The colors for this building are Antique Linen and Tobacco Brown. A sample will be signed out to the contractor to get a match. The contractor will then return the sample given to them, and the Base Civil Engineer or representative will make a color match determination for approval or disapproval.

Attachment 5 to FA466419BA006 Page 5 of Page 5

File details come from the government source that posted it.