Atch_3_-_Schedule_of_Material_Submittals.pdf

PDF 44 KB Posted

Attached to
Repair Airfield Joint Sealant at March ARB CA
Solicitation number
FA466416B0001
Issued by

About this file

Atch 3 - Schedule of Material Submittals

View the file

Other files

File Type Posted
Atch_1_-_Wage_Dec_08-26-16.doc DOC document
FA4664-16-B-0001_0001.docx DOCX document
Site_Walk_Notes.pdf PDF
Atch_2_-_SOW_25_July_2016.pdf PDF
Atch_4_-_JOINT_SEAL_MAP.pdf PDF
Atch_7_-_Bid_Opening_Pass_Sheet.docx DOCX document
Atch_6_-_Security_Pamphlet.docx DOCX document
Atch_5_-_Specifications.zip ZIP file
Atch_1_-_Wage_Dec_08-12-16.pdf PDF
FA4664-16-B-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER PROJECT TITLE SOLICITATION / CONTRACT NO.

7/22/2016 SCHEDULE OF MATERIAL SUBMITTALS PDPG090150 Airfield Joint Sealant Repair

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

LINE

NO.

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C U

T E

R 'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C U

T E

R 'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S E

E P

A R

A G

R A

P H

R E

F E

R E

N C

E

O T

H E

R REQUIRED

SUBMISSION

DATE

DATE

RECEIVE

D IN CON-

TRACTIN

G

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRA

C-TOR RE-

SUBMIT-

TAL

FINAL

APPROVAL

REMARKS

APPROVED DISAPPROVED

Contract Closeout At 1 2 Final

As Built Drawings Inspection Construction Schedule 5 Days

2 2 after

Construction Pregress Schedule NTP

Demolition Plan 5 Days

3 02 41 00 2 After

Demolition NTP

Shop Drawings

4 02 61 13 2 2 See Specs

Excavation and Handling of Contamnated material

Work Plan

5 02 61 13 2 See Specs

Excavation and Handling of Contamnated material

Closure Report

6 02 61 13 2 See Specs

Excavation and Handling of Contamnated material

Tests

7 02 61 13 2 See Specs

Equipment Manufacturer data

32 01 26.71 2 See Specs

8 Grooving For Airfield Pavements

Test Reports

32 01 28 2 2 See Specs

9 Partial Depth Patching of Rigid Pavements

Manufacturer's Recommendations

32 01 19 2 2 2 See Specs

10 Fiedl Molded Sealants for Sealing Joints in Rigid Pavements

Product Data

G

G

G

G

FA4664-16-B-0001

File details come from the government source that posted it. Updated .