This is a Statement of Work (SOW) for the repair of Building 8216's water plant, dated 09 March 2026.

The contractor must remove and replace components on two altitude valves (10-inch and 12-inch) located in an underground maintenance pit at Dyess Air Force Base in Texas. Work includes removing all ball valves, tubing, fittings, pilot valves, pressure gauges, internal rubber, gaskets, and strainers, then replacing them with identical components. The contractor must also apply electric blue paint (RGB 125, 249, 255 or hex #7DF9FF) meeting NSF/ANSI 61 General Requirements Section 5.3 standards to the valves. The work shall be accomplished by isolating gate valves at different times to minimize water distribution downtime. The contractor must document all parts and sizes prior to removal. The performance period is limited to two calendar days, with a highly encouraged pre-proposal site visit with a CE Project Planner. Work must be scheduled during normal business hours (0700-1600) but may extend to after-hours or weekends if requested or required. The contractor is responsible for coordinating with building occupants through the 7 CES Customer Service Desk, providing two days' advance notice for any shutdowns, and maintaining a confined-space entry permit with atmospheric monitoring throughout pit entry. The contractor shall provide one-year warranty on all work, restore disturbed areas to original condition, maintain a clean work site, and dispose of all construction debris in accordance with federal, state, and local regulations. All work must comply with applicable federal, state, and local laws, including SDWA, EPA, Texas Administrative Code Title 30 Chapter 290, Texas Health and Safety Code Chapter 341, DoD/Air Force guidance, and Unified Facilities Criteria standards. Additional requirements include OSHA compliance, Texas Workman Compensation safety standards, confined-space entry protocols with 7 BW Grounds Safety oversight, AF Form 103 work clearance renewed every 30 days, AF Form 592 approval for any welding/cutting/brazing operations, radiation permits if applicable, and security protocols including Dyess Form 173 identification procedures and access restrictions based on controlled or restricted area status.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

BLDG 8216, WATER PLANT REPAIR

3. Work Task: 10 INCH 12 INCH CLA-V ALS REQUIRE REPAIR, WT#l 7211479

3.1. Installation Services and Additive Services: The Contractor shall document all parts and sizes prior to removal of all components. The contractor shall remove all ball valves, tubing & fittings, pilot valves, pressure gauges, internal rubber, gaskets, strainers. The Contractor shall replace the 1 0" altitude valve components and the 12" altitude valve components, to include: ball valves, tubing & fittings, pilot valves, pressure gauges, internal rubber, gaskets, strainers. This shall be accomplished at differing times by isolating the two gate valves connected to each altitude valve to minimize water distribution down times.

3.1.1. Break down Salient Characteristics and Specs absolutely needed to fulfill the requirement:

The below example is in reference to a custom computer. Please tailor as needed to your requirement.

ITEM

I.I. NUMBER Description QUANTITY UNIT

0001 Altitude Pilot Control Valve 1 EA

• Temperature range: Water - 180 degrees

Fahrenheit

• ¾" supply

• ¼" sensing line

• Trim: Brass & Stainless Steel

• Pressure: 200 psi MAX

002 Rubber rebuild kit for altitude valve 2 EA

• 10" kit

• 12" kit

3.1.2. Altitude Valve.

3.1.2.1. Paint. In addition to repairing the altitude valves, the Contractor will also apply ELECTRIC BLUE paint to the valves. The paint will match the following criteria from 3 .1.1.1 and shall be submitted for approval prior to application. The paint selected shall meet the entire Section 5.3 General Requirements from NSF/ANSI 61 (where applying after-factory paint is applicable), and the manufacturer specifications/instructions that come with the paint selected. The paint shall be specifically the RGB color code 125, 249, 255 (Electric Blue) or hexadecimal code #7DF9FF.

3.2. Demolition Services: The Contractor shall remove all altitude valve components mentioned in 3.1 on the 1 0" altitude valve and the 12" altitude valve. Refer to 3.8 for disposal.

3.3. Work shall be scheduled during normal business hours 0700-1600, however, the Contractor may request and/or be required to perform work after normal duty hours or on weekends.

3.4. The Contractor shall conduct the work in a manner to keep to a minimum disruption of normal and emergency operations.

SOW, 09 March 2026