2._Attachment_1_-_SOW.pdf

PDF 142 KB Posted

Attached to
Replace Water Fountains Federal contract opportunity
Solicitation number
FA4661-17-R-0020
Issued by
Department of the Air Force Air Combat Command

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Replace Water Fountains, newest first.
File Type Posted
3._Site_Visit_Registration_Form.pdf PDF
1._FA4661-17-R-0020.pdf PDF
4._Site_Visit_Registration_Form.pdf PDF
1._FA4661-17-R-0020.pdf PDF
3._Site_Visit_Registration_Form.doc DOC document
4._WDOL_DBA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION

STATEMENT OF WORK

INSTALL THREE WATER FOUNTAINS WITH BOTTLE FILL

BLDG 7104

Task ID: 1002381 24 February 2017

1. DESCRIPTION OF SERVICES: The contractor shall provide all labor, new equipment unless stated otherwise, tools, material, supervision, and all other necessary items to remove three (3) existing drinking fountains and replace with new Elkay Enhanced EZH2O Bottle Filling Station or equal with Bi-level ADA, Cooler Filtered 8 GPH Stainless Steel and all new working components associated with the drinking fountain. B-7104, Dyess AFB, Texas.

1.1 The contractor has 10 calendar days, after the date of award, to submit any Material Submittals (AF 3000) before the Notice to Proceed (NTP) will be given and shall commence work within seven (7) calendar days of the NTP. The contractor shall prepare all material submittal for approval by the government prior to ordering or installing any material. The Contractor shall order all materials after the approval of th submitted Material Submittal.

1.2 The facility (7104) is operating 24/7, the contractor shall only work when there are on duty FSS personnel at the facility. Working hours are accordance with paragraph 4 (0700-1600). Facility POC is MSgt Starnes 325-696-4306.

1.3 The contractor shall ensure at least one drinking fountain will be operational during the entire contract duration.

1.4 The contractor shall install 3 new Elkay Enhanced EZH2O Bottle Filling Station or equal with Bi-level ADA, Cooler Filtered 8 GPH Stainless Steel in place of the existing drinking fountains.

1.5 The contractor shall remove the three (3) existing drinking fountains.

1.6 The contractor shall repair/replace all damaged government property throughout the duration of the contract.

1.7 The contractor shall follow all instillation procedures as outlined in the manufactures guidelines when installing the new drinking fountains.

1.8 The contractor shall repair any damaged walls (to include holes left from the old drinking fountains).

They shall be painted to match the surrounding area and be aesthetically pleasing to the eye.

1.9 The contractor shall remove the existing backsplash and replace with new backsplash or finished wall. If contractor finishes the wall without backsplash, an access panel must be installed for easy access to plumbing.

1.10 The contractor shall keep work area clean at all times to ensure that the personnel using the facility while work is in progress are able to have full use of the fitness center.

1.11 All tile removed or broken shall be replaced with an exact match or an aesthetically pleasing similar tile.

1.12 The contractor shall dispose of all construction debris off the installation and in accordance with all local, state, and federal requirements as required by paragraph 6. The contractor shall leave work site clean and clear of any work debris, materials, supplies, tools, or equipment associated with this project.

1.13 The contractor shall warranty all work for a period of 1 year from the date of acceptance by the government.

1.14 All connections shall be secure and leak free at final inspection time. All system components shall work properly and efficiently to manufactures specifications.

1.15 The contractor shall attend a site visit before placing a bid on this project.

1.16 The contractor shall have all works completed within twenty (20) calendar days once notice to proceed is given.

2. HAZARDOUS CONDITIONS. During the course of performing work under this contract, should the contractor find conditions existing that prevent the performance of task specified; the Contracting Officer shall be immediately notified. A confined-space permit must be obtained through the proper authorities before entering any confined space.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will provide reasonable utilities and work space for the contractor to perform the requested duties. There are no covered or secure storage areas available. The contractor will provide all equipment and storage media necessary to perform tasks.

3.1. Toilet Facilities. Use of existing toilet facilities in the immediate work area only will be permitted.

Contractor personnel will ensure facility cleanliness is maintained at all times.

3.2 Security Police and Fire Protection. The government will provide general on-base security police and fire protection service. Security police phone extension is 696-2131 for emergencies, and 696-4100 for routine calls. Fire protection emergency phone is 911 from any on-base phone, 696-2117 from a cell phone.

3.3. Telephone. The government shall not provide telephone services. If available, contractor may use government phones in a case of emergencies or during field and site work. No long distance telephone calls will be authorized.

4. HOURS OF OPERATION. Working hours for the contractor will be between the hours of 7:00 AM and 4:00 PM excluding Saturdays, Sundays, and Federal holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer five (5) calendar days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the contractor to perform work during periods other than normal duty hours/days.

5. SAFETY AND HEALTH. All holes/pits/trenches/manway openings, etc, that are to be left open shall be surrounded with a 48 inch high mesh fence with highly visible orange plastic coating. The fence shall be securely anchored with tension wires and posts as required to prevent sagging and located a minimum of 3 feet from the opening so as to prevent an individual, should they fall across the fencing, from falling into the opening. Holes shall also be covered, when not being worked in, with three quarter inch plywood or a metal grating that will prevent small children from entering the hole.

5.1. OSHA Requirements. All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards and handbooks, and with the Corps of Engineers (COE) Safety Manual 385-1-1, dated 03 Sep 96.

5.2. State Requirements. All companies who conduct business within the state of Texas must, in accordance with Texas Workman Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Workman Compensation Commission (TWCC), shall be submitted For Information Only (FIO) in accordance with paragraph SUBMITTAL REQUIREMENTS. In addition to meeting the TWCC requirements; the plan must also include the requirements of COE Safety Manual 385-1-1.

5.3. Welding, Cutting, and Brazing: Contractor shall obtain required advance approval for any process that includes welding, soldering, brazing, cutting with or use of a torch, or any other operation that involves a flame or equipment that produces a high degree of heat. Approval must be requested 24 hours in advance via an AF Form 592. Assigned COR will assist in filling out and processing the AF Form 592 when/if required. Operations shall not commence until the Dyess Fire Department approves the AF Form 592 and assigns a control number. Contractor shall put a fire watch in place and shall have appropriate fire extinguishers on-site at the location of the work. Contractor shall coordinate work start to allow an on-site inspection by Dyess Fire Prevention personnel prior to any portion of the work that requires the AF Form 592.

5.4. Work Clearance: An AF Form 103, Base Civil Engineer Work Clearance Request, shall be completed by the contractor and approved by 7 CES prior to start of work; furthermore, the document must be renewed every 30 days until the completion of the contract. Preparation and approval of the AF Form 103 can be worked through the assigned 7 CES contracting officer representative (COR).

5.5. Confined Space: Contractors shall obtain all necessary approvals and permits for entry into confined space prior to work start.

6. Disposition of Waste, Excess, Scrap, and Salvage Materials. The title to all waste, excess, scrap, and salvage materials generated as a direct result of this contract is vested in the Contractor - unless specifically excepted below.

Further (unless listed below in exceptions), these materials shall be disposed of off the Base by the Contractor in accordance with all applicable Federal, State, and Local Regulations. Following is a list of materials (Exceptions) that will be generated as a result of this contract and shall be turned-into the Government at a location at Dyess AFB designated by the Contracting Officer:

Exceptions: None.

7. Radiation Permits and Authorizations. Contractors contemplating the use of devices containing radioactive materials (i.e., soil moisture/density probes) or non-ionizing radiation producing equipment (radio frequency radiation emitters or lasers) while performing work on this contract must obtain written authorization/permit from the Dyess AFB Radiation Safety Officer (RSO), 7 ADOS/SGGB. To obtain the required authorization permit, an application to bring a radioactive device on Dyess AFB must be forwarded to 7 ADOS/SGGB, 697 Hospital Road, Dyess AFB, TX 79607-1367 (this is mailing address, physical address is 880 Third St.) or (915)696-2325/3289, at least 45 days prior to the anticipated use. Without the proper authorization, Contractors will not be allowed to bring these devices on base. Also, Contractor shall provide Bioenvironmental Engineering (7 ADOS/SGGB) a copy of contractor’s radioactive materials permit and training certificates, if radioactive material will be brought onto Dyess

AFB.

8. Security Requirements

8.1 Levels of Security. Dyess AFB security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Dyess AFB in question.

8.1.1 The lowest level of security exists in “GENERAL ACCESS” areas. These areas are all of Dyess

AFB outside of the "USAF Controlled" and "USAF Restricted" areas.

8.1.2 “USAF Controlled” access areas are the mid-level security areas. Presence within the

CONTROLLED ACCESS AREA is by authorization; however, the movement of authorized personnel in and out of these AREAS is generally not impeded.

8.1.3 The highest level of security on Dyess AFB is that within the “USAF RESTRICTED AREAS”.

These areas are subdivided to be known as Protection Level 1, 2 or 3 AREAS. Work schedule requests or changes to existing schedules for work to be performed in a “USAF RESTRICTED AREA” shall be submitted at least 7 calendar days in advance for approval and coordination of Dyess AFB Security Forces.

8.2 Closed Base. Dyess AFB is considered a closed base. All personnel entering must have specific permission of the installation commander for entry. This permission is granted when a Contractor employee is issued an identification card. The Contracting Officer shall provide information necessary to obtain identification cards. The contractor shall be responsible to ensure that all of its employees obtain, and keep on their person at all times while working on the base, a USAF identification card. Upon completion of the work or termination of an employee, the contractor shall be responsible for turn in of identification cards to the Contracting Officer or to the Pass and Registration Office of the Security Forces.

NOTE: Failure to turn in badges will result in WITHHOLDING OF FINAL PAYMENT and revocation of any future badges issued by Pass and Registration Office to the employee and the contractor.

8.3 Dyess Form 173. The Dyess AFB Form 173 is subject to the privacy act of 1974, Authority: 10 U.S.C.

8012 and 5 U.S.C. 552a(b)(7). Disclosure is Mandatory: Failure to provide the information and Social Security Number (SSN) could result in denied access to the Dyess AFB installation.

8.3.1 Effective 1 Nov 04, a completed signed original Dyess Form 173 (Mar 04) must be delivered to Pass & ID by 0900 on the duty day prior to the desired day of entry onto Dyess AFB. All information on the Dyess Form 173 must be typed and the authorizing signature must be in blue or black ink. Personal information provided on the Dyess Form 173 will be cross-referenced against state and federal criminal databases to identify those individuals possessing outstanding warrants. Those individuals with outstanding warrants will be detained at the Visitor Control Center on the desired day of entry, and turned over to Abilene Police Department.

8.3.2 The approving authority (individual on the 577) can make “ink changes” in red ink to correct any errors noted on the form. All changes have to be initialed by the approval authority.

8.3.3 All Contractor day laborers will be processed via the Texas Law Enforcement Terminal

System (TLETS—police wants/warrants check). At this time, someone with military credentials or a Trusted Agent will physically have to meet them to sponsor them onto the installation. Once it is determined the individual is cleared from any wants or warrants and their state or federal identification is valid, their pass will be issued.

8.3.4 Once the Dyess Form 173 has been vetted through TLETS and checked for errors, the Pass and Registration Section shall issue a Contractor badge utilizing the original Dyess Form 173.

Once a badge is obtained, they need only show the badge at the installation gate for entry onto the installation.

8.3.5 The Dyess Form 173 will be maintained at the VCC for 30 days in order to issue badge credentials. If the Contractor hasn’t requested credentials prior to the 30 days expiration, the form will be void and must be resubmitted if credentials are later requested. After one year on file the expired Dyess Form 173 will be destroyed.

8.4 Trusted Agent Letter for Day Labor Requests.

8.4.1 Purpose of Letter: To provide sponsoring authority to specific contractor individuals as identified by their sponsoring agency (7 CONS, Army Corp of Engineers, etc) to sponsor day laborers on for one to thirty day periods.

8.4.2 The Letter Process:

8.4.2.1 The sponsoring agency, in coordination with their contractor, shall identify contractor individuals that require sponsoring/vouching authority. This authority is given to the contractor for the purpose of sponsoring day laborers/job site personnel sub-contracted as a result of an unexpected or new requirement not previously identified in the current contract. This authority will not be given to contractors for convenience only, but should be limited to the smallest group of manager or foreman contractor personnel needed to complete their assigned contract. It is the responsibility of the sponsoring agency to ensure the Trusted Agent Letter remains current. A Trusted Agent must possess a valid driver’s license and have been issued contractor badge credentials for a minimum of six weeks. Additionally, all reasonable actions should occur to prevent use of this process when a known laborer/sub-contractor was required well in advance of the day labor/sub-contractor request. (Effective Date: Immediately)

8.4.2.2 The sponsoring agency shall provide this letter to the Pass and Registration Section who will maintain it on file. The Pass and Registration section shall post a copy of the letter at the VCC, as a reference, to verify which contractor personnel have sponsoring/vouching authority

8.5 The Process to get Day Labors/Job Site Personnel Sub-Contracted onto the Installation: The contractor individuals identified in the Trusted Agent Letter will be physically present to sponsor individuals requiring one to thirty days entrance. The VCC clerk will verify the identity of all individuals by checking their valid State/Federal Identification card. The VCC clerk will check 100% of the individuals via the TLETS. Should any individual not possess a valid identification card, they will be turned away at the VCC and entry to the installation denied. All information must be validated by the clerk before the contractor will be allowed to proceed onto the installation with the sponsored individuals.

Should an AF Form 75 be issued, the driver will be required to produce a valid driver’s license, current insurance card, and current registration for the vehicle being operated. Once on the installation, the Trusted Agent Contractor shall be responsible for the actions of the sponsored individuals. Should an incident occur with a sponsored guest, and negligence be proven on the part of the Trusted Agent Contractor, their vouching/sponsoring authority will be revoked. The Trusted Agent Letter can be adjusted to add and delete names of Trusted Agent Contractors as needed, as long as the provisions of this paragraph are followed. At no time will the Trusted Agent Contractor depart the installation and leave any of his/her sponsored individuals with another contractor that does not have the same vouching/sponsoring privileges.

8.6 All contractor companies must attend a contractor briefing given by Pass and Registration, who will provide a more detailed explanation regarding contractor badges and their uses. Pass and Registration reserves the right to not issue a contractor badge due to erroneous information or failure to disclose information on the Dyess Form 173. Any derogatory information received from the background check will result in the non-issuance of the contractor badge.

9. Identification of Contractor Vehicles. Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent/magnetic signage. All contractor vehicles shall enter Dyess AFB via the Tye Gate. Exceptions to Tye Gate are on weekends or between the hours of 1800 – 0630 during the weekdays when the Dyess AFB Main Gate may be used.

10. Other Vehicle and Licensing Requirements:

10.1 All contractor employees who will be driving a vehicle on Dyess AFB shall have a current driver’s license with them at all times while on Dyess AFB.

10.2 All contractor vehicles to be operated on Dyess AFB will have a valid state registration, vehicle inspection, and insurance. Proof of registration and vehicle insurance must be physically available at all times while the vehicle is on Dyess AFB.

10.3 Any contractor employee who will be operating heavy equipment or specialized equipment that requires a license or certification shall be so licensed/certified with proof presented to the Contracting Officer’s representative and 7 CES COR prior to work start.

File details come from the government source that posted it. Updated .