Text version

Requirements for Asbestos Abatement and Remove/Replace Carpet and Tile Base-w ide.

10 USC 2304(c)(5) is the authority for use of other than full and open competition.

Solicitation and aw ard processed pursuant to PA

This requirements contract w ill be utilized by the 7th Contracting Squadron for base-w ide facilities w ith the exclusion of military family housing.

The aw ard of a Firm Fixed Price, Requirments Contract is anticipated. The aw ard of this contract is restricted to SBA certif ied Hubzone participants.

NAICS Code: 238330; Size Standard: $14,000,000.00

IAW FAR 36.204, the magnitude of this project is estimated betw een $1,000,000.00 and $5,000,000.00

Enter prices in Section B. Use a typew riter or black pen ink.

Facsimile proposals are not authorized and w ill not be accepted. All times are in central standard time (CST).

Please provide 2 copies to your solicitation "sanitized" (blacked out) of your companies information and the original untouched w ith your companies information intact.

CHRISTOPHER TATE 325-696-1455

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

23-Feb-2011

(RFP)

(IFB)

X

CALL:

Asbestos Abatement and Replace Carpet/ Tile

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Jul 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

7TH CONTRACTING OFFICE

381 THIRD STREET

DYESS AFB TX 79607-1581

FA4661

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

FNWZ 11-1103

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

FA4661-11-R-0003 130

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA4661-11-R-0003

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 20 Hours Downtime

FFP

Downtime Ref. Section 1A,3.1 of Specifications

FOB: Destination

NSN: Z199-CA-RPE-T000

SIGNAL CODE: A

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 150 Each Asbestos Sampling

FFP

The contractor shall take asbestos samples as requested by the government, Ref.

Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0003 20 Each Asbestos Report (12 or less)

FFP

The contractor shall provide asbestos reports (12 or less) as requested by the government, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0004 20 Each Asbestos Report (more than 12)

FFP

The contractor shall provide asbestos reports (more than 12) as requested by the government, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0005 5,000 Square

Foot

Abate Mastic and Carpet

FFP

The contractor shall abate Black Mastic and Carpet, Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0006 3,000 Square

Abate Floor Tile and Mastic 1-1000 SF

The contractor shall abate Floor Tile and Black Mastic (no carpet) 1-1000 Square

Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0007 2,500 Square

Abate Floor Tile and Mastic >1000 SF

The contractor shall abate Floor Tile and Black Mastic (no carpet) Over 1000

Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0008 2,000 Square

Abate Floor Tile and Mastic 1-1000 SF

The contractor shall abate Floor Tile and Black Mastic (Including carpet over tile)

1-1000 Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0009 1,001 Square

Abate Floor Tile and Mastic >1000 SF

The contractor shall abate Floor Tile and Black Mastic (Including carpet over tile)

Over 1000 Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0010 25,000 Square

Demo Carpet 1-1000 SF

The contractor shall demo carpet ( No asbestos materials) 1-1000 SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0011 50,000 Square

Demo Carpet >1000 SF

The contractor shall demo carpet ( No asbestos materials) Over SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0012 10,000 Square

Demo Vinyl Composition Tile 1-1000 SF

The contractor shall demo Vinyl Composition Tile (VCT) ( No asbestos materials)

1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0013 20,000 Square

Demo Vinyl Composition Tile >1000 SF

The contractor shall demo Vinyl Composition Tile (VCT) ( No asbestos materials)

Over SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0014 1,500 Square

Demo Ceramic Tile 1-1000 SF

The contractor shall demo Ceramic Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0015 3,000 Square

Demo Ceramic Tile >1000 SF

The contractor shall demo Ceramic Tile ( No asbestos materials) Over SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0016 300 Square

Demo Quarry Tile 1-1000 SF

The contractor shall demo Quarry Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0017 1,001 Square

Demo Quarry Tile >1000 SF

The contractor shall demo Quarry Tile ( No asbestos materials) Over 1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0018 500 Square

Demo Mud Bed 1-1000 SF

The contractor shall demo Mud Bed ( No asbestos materials) 1-1000 SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0019 1,001 Square

Demo Mud Bed >1000 SF

The contractor shall demo Mud Bed ( No asbestos materials) Over 1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0020 500 Square

Demo Rubber Tile 1-1000 SF

The contractor shall demo Rubber Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0021 1,001 Square

Demo Rubber Tile > 1000 SF

The contractor shall demo Rubber Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0022 5,000 Square

Install Double Glue Down Carpet 1-1000SF

The Contractor shall install 1-1000 SF of Double Glue Down Carpet with 3/8"

Foam Padding including Floor Preparation. Padding shall be 3/8" thick bonded, 7lb. density with poly backing and shall be direct glued with adhesive. Reference

Section 1A 2.12 of Specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0023 10,000 Square

Install Double Glue Down Carpet > 1000SF

The Contractor shall install over 1000 SF of Double Glue Down Carpet with 3/8"

Foam Padding including Floor Preparation. Padding shall be 3/8" thick bonded, 7lb. density with poly backing and shall be direct glued with adhesive. Reference

Section 1A 2.12 of Specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0024 30,000 Square

Install Glue Down Carpet 1-1000 SF

The contractor shall install 1-1000 square feet of Direct Glue Down Carpet including Floor Preparation as needed. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0025 60,000 Square

Install Glue Down Carpet >1000 SF

The contractor shall install over 1000 square feet of Direct Glue Down Carpet including Floor Preparation as needed. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0026 1,000 Square

Install Carpet Tiles 1-1000 SF

The contractor shall install 1-1000 square feet of Carpet Tiles including Floor

Preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0027 2,000 Square

Install Carpet Tiles >1000 SF

The contractor shall install over 1000 square feet of Carpet Tiles including Floor

Preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0028 10,000 Square

Install 12" x 12" Ceramic Tile 1-1000 SF

The contractor shall install 1-1000 square feet of 12 inch by 12 inch Ceramic Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0029 20,000 Square

Install 12" x 12" Ceramic Tile >1000 SF

The contractor shall install Over 1000 square feet of 12 inch by 12 inch Ceramic

Tiles. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0030 1,000 Square

Install 8" x 8" Quarry Tile 1-1000 SF

The contractor shall install 1-1000 square feet of 8 inch by 8 inch Quarry Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0031 2,000 Square

Install 8" x 8" Quarry Tile >1000 SF

The contractor shall install over 1000 square feet of 8 inch by 8 inch Quarry Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0032 500 Square

Install Mud Bed 1-1000 SF

The contractor shall install 1-1000 square feet of Mud Bed. Reference Section 1A,

2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0033 1,001 Square

Install Mud Bed >1000 SF

The contractor shall install over 1000 square feet of Mud Bed. Reference Section

1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0034 2,500 Square

Install 12"x 12" VCT 1-1000 SF

The contractor shall install 1-1000 square feet of Vinyl Composition Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0035 5,000 Square

Install 12"x 12" VCT >1000 SF

The contractor shall install over 1000 square feet of Vinyl Composition Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0036 1,000 Square

Install Rubber Tile 1-1000 SF

The contractor shall install 1-1000 square feet of Rubber Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0037 1,001 Square

Install Rubber Tile >1000 SF

The contractor shall install over 1000 square feet of Rubber Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0038 1,000 Square

Install Sheet Vinyl Flooring 1-1000 SF

The contractor shall install 1-1000 square feet of Sheet Vinyl Flooring, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0039 1,001 Square

Install Sheet Vinyl Flooring >1000 SF

The contractor shall install over 1000 square feet of Sheet Vinyl Flooring, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0040 500 Square

Install Flooring w/Heat Seams 1-1000 SF

The contractor shall install 1-1000 square feet of Sheet Vinyl Flooring with Heat

Welded Seams, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0041 1,001 Square

Install Flooring w/Heat Seams >1000 SF

The contractor shall install over 1000 square feet of Sheet Vinyl Flooring with Heat

Welded Seams, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0042 5,000 Linear

Install 4" Vinyl Cove Base 1-1000 LF

The contractor shall install 1-1000 linear feet of 4" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0043 10,000 Linear

Install 4" Vinyl Cove Base >1000 LF

The contractor shall install over 1000 linear feet of 4" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0044 1,000 Linear

Install 6" Vinyl Cove Base 1-1000 LF

The contractor shall install 1-1000 linear feet of 6" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0045 2,000 Linear

Install 6" Vinyl Cove Base > 1000 LF

The contractor shall install over 1000 linear feet of 6" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0046 500 Linear

Install Vinyl Transition Strip 1-1000 LF

The contractor shall install 1-1000 linear feet (LF) of Vinyl Transition Strips.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0047 1,001 Linear

Install Vinyl Transition Strip >1000 LF

The contractor shall install over 1000 linear feet (LF) of Vinyl Transition Strips.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0048 100 Each Install Door Thresholds

FFP

The contractor shall install thresholds at Doors. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

0049 50 Each Install Rubber Stair Treads

FFP

The contractor shall install Stair Treads. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

ITEM NO SUPPLIES/SERVICES MAX

UNIT UNIT PRICE MAX AMOUNT

1001 20 Hours OPTION Downtime

FFP

Downtime Ref. Section 1A,3.1 of Specifications

FOB: Destination

MAX

UNIT UNIT PRICE ESTIMATED AMOUNT

1002 150 Each OPTION Asbestos Sampling

FFP

The contractor shall take asbestos samples as requested by the government up to

100 samples, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1003 20 Each OPTION Asbestos Report (12 or less)

FFP

The contractor shall provide asbestos reports (12 or less) as requested by the government, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1004 20 Each OPTION Asbestos Report (more than 12)

FFP

The contractor shall provide asbestos reports (more than 12) as requested by the government, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1005 5,000 Square

OPTION Abate Mastic and Carpet

The contractor shall abate Black Mastic and Carpet, Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1006 3,000 Square

OPTION Abate Floor Tile and Mastic 1-1000 SF

The contractor shall abate Floor Tile and Black Mastic (no carpet) 1-1000 Square

Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1007 2,500 Square

OPTION Abate Floor Tile and Mastic >1000 SF

The contractor shall abate Floor Tile and Black Mastic (no carpet) Over 1000

Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1008 2,000 Square

The contractor shall abate Floor Tile and Black Mastic (Including carpet over tile)

1-1000 Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1009 1,001 Square

The contractor shall abate Floor Tile and Black Mastic (Including carpet over tile)

Over 1000 Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1010 25,000 Square

OPTION Demo Carpet 1-1000 SF

The contractor shall demo carpet ( No asbestos materials) 1-1000 SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1011 50,000 Square

OPTION Demo Carpet >1000 SF

The contractor shall demo carpet ( No asbestos materials) Over SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1012 10,000 Square

OPTION Demo Vinyl Composition Tile 1-1000 SF

The contractor shall demo Vinyl Composition Tile (VCT) ( No asbestos materials)

1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1013 20,000 Square

OPTION Demo Vinyl Composition Tile >1000 SF

The contractor shall demo Vinyl Composition Tile (VCT) ( No asbestos materials)

Over SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1014 1,500 Square

OPTION Demo Ceramic Tile 1-1000 SF

The contractor shall demo Ceramic Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1015 3,000 Square

OPTION Demo Ceramic Tile >1000 SF

The contractor shall demo Ceramic Tile ( No asbestos materials) Over SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1016 300 Square

OPTION Demo Quarry Tile 1-1000 SF

The contractor shall demo Quarry Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1017 1,001 Square

OPTION Demo Quarry Tile >1000 SF

The contractor shall demo Quarry Tile ( No asbestos materials) Over 1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1018 500 Square

OPTION Demo Mud Bed 1-1000 SF

The contractor shall demo Mud Bed ( No asbestos materials) 1-1000 SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1019 1,001 Square

OPTION Demo Mud Bed >1000 SF

The contractor shall demo Mud Bed ( No asbestos materials) Over 1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1020 500 Square

OPTION Demo Rubber Tile 1-1000 SF

The contractor shall demo Rubber Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1021 1,001 Square

OPTION Demo Rubber Tile > 1000 SF

The contractor shall demo Rubber Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1022 5,000 Square

OPTION Install Double Glue Down Carpet 1-1000SF

The Contractor shall install 1-1000 SF of Double Glue Down Carpet with 3/8"

Foam Padding including Floor Preparation. Padding shall be 3/8" thick bonded, 7lb. density with poly backing and shall be direct glued with adhesive. Reference

Section 1A 2.12 of Specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1023 10,000 Square

OPTION Install Double Glue Down Carpet > 1000SF

The Contractor shall install over 1000 SF of Double Glue Down Carpet with 3/8"

Foam Padding including Floor Preparation. Padding shall be 3/8" thick bonded, 7lb. density with poly backing and shall be direct glued with adhesive. Reference

Section 1A 2.12 of Specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1024 30,000 Square

OPTION Install Glue Down Carpet 1-1000 SF

The contractor shall install 1-1000 square feet of Direct Glue Down Carpet including Floor Preparation as needed. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1025 60,000 Square

OPTION Install Glue Down Carpet >1000 SF

The contractor shall install over 1000 square feet of Direct Glue Down Carpet including Floor Preparation as needed. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1026 1,000 Square

OPTION Install Carpet Tiles 1-1000 SF

The contractor shall install 1-1000 square feet of Carpet Tiles including Floor

Preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1027 2,000 Square

OPTION Install Carpet Tiles >1000 SF

The contractor shall install over 1000 square feet of Carpet Tiles including Floor

Preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1028 10,000 Square

OPTION Install 12" x 12" Ceramic Tile 1-1000 SF

The contractor shall install 1-1000 square feet of 12 inch by 12 inch Ceramic Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1029 20,000 Square

OPTION Install 12" x 12" Ceramic Tile >1000 SF

The contractor shall install Over 1000 square feet of 12 inch by 12 inch Ceramic

Tiles. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1030 1,000 Square

OPTION Install 8" x 8" Quarry Tile 1-1000 SF

The contractor shall install 1-1000 square feet of 8 inch by 8 inch Quarry Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1031 2,000 Square

OPTION Install 8" x 8" Quarry Tile >1000 SF

The contractor shall install over 1000 square feet of 8 inch by 8 inch Quarry Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1032 500 Square

OPTION Install Mud Bed 1-1000 SF

The contractor shall install 1-1000 square feet of Mud Bed. Reference Section 1A,

2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1033 1,001 Square

OPTION Install Mud Bed >1000 SF

The contractor shall install over 1000 square feet of Mud Bed. Reference Section

1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1034 2,500 Square

OPTION Install 12"x 12" VCT 1-1000 SF

The contractor shall install 1-1000 square feet of Vinyl Composition Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1035 5,000 Square

OPTION Install 12"x 12" VCT >1000 SF

The contractor shall install over 1000 square feet of Vinyl Composition Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1036 1,000 Square

OPTION Install Rubber Tile 1-1000 SF

The contractor shall install 1-1000 square feet of Rubber Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1037 1,001 Square

OPTION Install Rubber Tile >1000 SF

The contractor shall install over 1000 square feet of Rubber Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1038 1,000 Square

OPTION Install Sheet Vinyl Flooring 1-1000 SF

The contractor shall install 1-1000 square feet of Sheet Vinyl Flooring, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1039 1,001 Square

OPTION Install Sheet Vinyl Flooring >1000 SF

The contractor shall install over 1000 square feet of Sheet Vinyl Flooring, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1040 500 Square

OPTION Install Flooring w/Heat Seams 1-1000 SF

The contractor shall install 1-1000 square feet of Sheet Vinyl Flooring with Heat

Welded Seams, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1041 1,001 Square

OPTION Install Flooring w/Heat Seams >1000 SF

The contractor shall install over 1000 square feet of Sheet Vinyl Flooring with Heat

Welded Seams, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1042 5,000 Linear

OPTION Install 4" Vinyl Cove Base 1-1000 LF

The contractor shall install 1-1000 linear feet of 4" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1043 10,000 Linear

OPTION Install 4" Vinyl Cove Base >1000 LF

The contractor shall install over 1000 linear feet of 4" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1044 1,000 Linear

OPTION Install 6" Vinyl Cove Base 1-1000 LF

The contractor shall install 1-1000 linear feet of 6" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1045 2,000 Linear

OPTION Install 6" Vinyl Cove Base > 1000 LF

The contractor shall install over 1000 linear feet of 6" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1046 500 Linear

OPTION Install Vinyl Transition Strip 1-1000 LF

The contractor shall install 1-1000 linear feet (LF) of Vinyl Transition Strips.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1047 1,001 Linear

OPTION Install Vinyl Transition Strip >1000 LF

The contractor shall install over 1000 linear feet (LF) of Vinyl Transition Strips.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1048 100 Each OPTION Install Door Thresholds

FFP

The contractor shall install thresholds at Doors. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1049 50 Each OPTION Install Rubber Stair Treads

FFP

The contractor shall install Stair Treads. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001 20 Hours OPTION Downtime

FFP

Downtime Ref. Section 1A,3.1 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2002 150 Each OPTION Asbestos Sampling

FFP

The contractor shall take asbestos samples as requested by the government up to

100 samples, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2003 20 Each OPTION Asbestos Report (12 or less)

FFP

The contractor shall provide asbestos reports (12 or less) as requested by the government, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2004 20 Each OPTION Asbestos Report (more than 12)

FFP

The contractor shall provide asbestos reports (more than 12) as requested by the government, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2005 5,000 Square

OPTION Abate Mastic and Carpet

The contractor shall abate Black Mastic and Carpet, Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2006 3,000 Square

The contractor shall abate Floor Tile and Black Mastic (no carpet) 1-1000 Square

Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2007 2,500 Square

The contractor shall abate Floor Tile and Black Mastic (no carpet) Over 1000

Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2008 2,000 Square

The contractor shall abate Floor Tile and Black Mastic (Including carpet over tile)

1-1000 Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2009 1,001 Square

The contractor shall abate Floor Tile and Black Mastic (Including carpet over tile)

Over 1000 Square Feet (SF), Ref. Section 1A, 2.11 of specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2010 25,000 Square

OPTION Demo Carpet 1-1000 SF

The contractor shall demo carpet ( No asbestos materials) 1-1000 SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2011 50,000 Square

OPTION Demo Carpet >1000 SF

The contractor shall demo carpet ( No asbestos materials) Over SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2012 10,000 Square

OPTION Demo Vinyl Composition Tile 1-1000 SF

The contractor shall demo Vinyl Composition Tile (VCT) ( No asbestos materials)

1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2013 20,000 Square

OPTION Demo Vinyl Composition Tile >1000 SF

The contractor shall demo Vinyl Composition Tile (VCT) ( No asbestos materials)

Over SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2014 1,500 Square

OPTION Demo Ceramic Tile 1-1000 SF

The contractor shall demo Ceramic Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2015 3,000 Square

OPTION Demo Ceramic Tile >1000 SF

The contractor shall demo Ceramic Tile ( No asbestos materials) Over SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2016 300 Square

OPTION Demo Quarry Tile 1-1000 SF

The contractor shall demo Quarry Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2017 1,001 Square

OPTION Demo Quarry Tile >1000 SF

The contractor shall demo Quarry Tile ( No asbestos materials) Over 1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2018 500 Square

OPTION Demo Mud Bed 1-1000 SF

The contractor shall demo Mud Bed ( No asbestos materials) 1-1000 SF, Reference

Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2019 1,001 Square

OPTION Demo Mud Bed >1000 SF

The contractor shall demo Mud Bed ( No asbestos materials) Over 1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2020 500 Square

OPTION Demo Rubber Tile 1-1000 SF

The contractor shall demo Rubber Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2021 1,001 Square

OPTION Demo Rubber Tile > 1000 SF

The contractor shall demo Rubber Tile ( No asbestos materials) 1-1000 SF, Reference Section 1A, 2.10 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2022 5,000 Square

OPTION Install Double Glue Down Carpet 1-1000SF

The Contractor shall install 1-1000 SF of Double Glue Down Carpet with 3/8"

Foam Padding including Floor Preparation. Padding shall be 3/8" thick bonded, 7lb. density with poly backing and shall be direct glued with adhesive. Reference

Section 1A 2.12 of Specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2023 10,000 Square

OPTION Install Double Glue Down Carpet > 1000SF

The Contractor shall install over 1000 SF of Double Glue Down Carpet with 3/8"

Foam Padding including Floor Preparation. Padding shall be 3/8" thick bonded, 7lb. density with poly backing and shall be direct glued with adhesive. Reference

Section 1A 2.12 of Specifications.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2024 30,000 Square

OPTION Install Glue Down Carpet 1-1000 SF

The contractor shall install 1-1000 square feet of Direct Glue Down Carpet including Floor Preparation as needed. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2025 60,000 Square

OPTION Install Glue Down Carpet >1000 SF

The contractor shall install over 1000 square feet of Direct Glue Down Carpet including Floor Preparation as needed. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2026 1,000 Square

OPTION Install Carpet Tiles 1-1000 SF

The contractor shall install 1-1000 square feet of Carpet Tiles including Floor

Preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2027 2,000 Square

OPTION Install Carpet Tiles >1000 SF

The contractor shall install over 1000 square feet of Carpet Tiles including Floor

Preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2028 10,000 Square

OPTION Install 12" x 12" Ceramic Tile 1-1000 SF

The contractor shall install 1-1000 square feet of 12 inch by 12 inch Ceramic Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2029 20,000 Square

OPTION Install 12" x 12" Ceramic Tile >1000 SF

The contractor shall install Over 1000 square feet of 12 inch by 12 inch Ceramic

Tiles. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2030 1,000 Square

OPTION Install 8" x 8" Quarry Tile 1-1000 SF

The contractor shall install 1-1000 square feet of 8 inch by 8 inch Quarry Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2031 2,000 Square

OPTION Install 8" x 8" Quarry Tile >1000 SF

The contractor shall install over 1000 square feet of 8 inch by 8 inch Quarry Tiles.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2032 500 Square

OPTION Install Mud Bed 1-1000 SF

The contractor shall install 1-1000 square feet of Mud Bed. Reference Section 1A,

2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2033 1,001 Square

OPTION Install Mud Bed >1000 SF

The contractor shall install over 1000 square feet of Mud Bed. Reference Section

1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2034 2,500 Square

OPTION Install 12"x 12" VCT 1-1000 SF

The contractor shall install 1-1000 square feet of Vinyl Composition Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2035 5,000 Square

OPTION Install 12"x 12" VCT >1000 SF

The contractor shall install over 1000 square feet of Vinyl Composition Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2036 1,000 Square

OPTION Install Rubber Tile 1-1000 SF

The contractor shall install 1-1000 square feet of Rubber Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2037 1,001 Square

OPTION Install Rubber Tile >1000 SF

The contractor shall install over 1000 square feet of Rubber Tile, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2038 1,000 Square

OPTION Install Sheet Vinyl Flooring 1-1000 SF

The contractor shall install 1-1000 square feet of Sheet Vinyl Flooring, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2039 1,001 Square

OPTION Install Sheet Vinyl Flooring >1000 SF

The contractor shall install over 1000 square feet of Sheet Vinyl Flooring, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2040 500 Square

OPTION Install Flooring w/Heat Seams 1-1000 SF

The contractor shall install 1-1000 square feet of Sheet Vinyl Flooring with Heat

Welded Seams, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2041 1,001 Square

OPTION Install Flooring w/Heat Seams >1000 SF

The contractor shall install over 1000 square feet of Sheet Vinyl Flooring with Heat

Welded Seams, Including floor preparation as needed. Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2042 5,000 Linear

OPTION Install 4" Vinyl Cove Base 1-1000 LF

The contractor shall install 1-1000 linear feet of 4" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2043 10,000 Linear

OPTION Install 4" Vinyl Cove Base >1000 LF

The contractor shall install over 1000 linear feet of 4" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2044 1,000 Linear

OPTION Install 6" Vinyl Cove Base 1-1000 LF

The contractor shall install 1-1000 linear feet of 6" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2045 2,000 Linear

OPTION Install 6" Vinyl Cove Base > 1000 LF

The contractor shall install over 1000 linear feet of 6" Vinyl Cove Base. Reference

Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2046 500 Linear

OPTION Install Vinyl Transition Strip 1-1000 LF

The contractor shall install 1-1000 linear feet (LF) of Vinyl Transition Strips.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2047 1,001 Linear

OPTION Install Vinyl Transition Strip >1000 LF

The contractor shall install over 1000 linear feet (LF) of Vinyl Transition Strips.

Reference Section 1A, 2.12 of Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2048 100 Each OPTION Install Door Thresholds

FFP

The contractor shall install thresholds at Doors. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2049 50 Each OPTION Install Rubber Stair Treads

FFP

The contractor shall install Stair Treads. Reference Section 1A, 2.12 of

Specifications

FOB: Destination

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

0007 Destination Government Destination Government

0008 Destination Government Destination Government

0009 Destination Government Destination Government

0010 Destination Government Destination Government

0011 Destination Government Destination Government

0012 Destination Government Destination Government

0013 Destination Government Destination Government

0014 Destination Government Destination Government

0015 Destination Government Destination Government

0016 Destination Government Destination Government

0017 Destination Government Destination Government

0018 Destination Government Destination Government

0019 Destination Government Destination Government

0020 Destination Government Destination Government

0021 Destination Government Destination Government

0022 Destination Government Destination Government

0023 Destination Government Destination Government

0024 Destination Government Destination Government

0025 Destination Government Destination Government

0026 Destination Government Destination Government

0027 Destination Government Destination Government

0028 Destination Government Destination Government

0029 Destination Government Destination Government

0030 Destination Government Destination Government

0031 Destination Government Destination Government

0032 Destination Government Destination Government

0033 Destination Government Destination Government

0034 Destination Government Destination Government

0035 Destination Government Destination Government

0036 Destination Government Destination Government

0037 Destination Government Destination Government

0038 Destination Government Destination Government

0039 Destination Government Destination Government

0040 Destination Government Destination Government

0041 Destination Government Destination Government

0042 Destination Government Destination Government

0043 Destination Government Destination Government

0044 Destination Government Destination Government

0045 Destination Government Destination Government

0046 Destination Government Destination Government

0047 Destination Government Destination Government

0048 Destination Government Destination Government

0049 Destination Government Destination Government

1001 Destination Government Destination Government

1002 Destination Government Destination Government

1003 Destination Government Destination Government

1004 Destination Government Destination Government

1005 Destination Government Destination Government

1006 Destination Government Destination Government

1007 Destination Government Destination Government

1008 Destination Government Destination Government

1009 Destination Government Destination Government

1010 Destination Government Destination Government

1011 Destination Government Destination Government

1012 Destination Government Destination Government

1013 Destination Government Destination Government

1014 Destination Government Destination Government

1015 Destination Government Destination Government

1016 Destination Government Destination Government

1017 Destination Government Destination Government

1018 Destination Government Destination Government

1019 Destination Government Destination Government

1020 Destination Government Destination Government

1021 Destination Government Destination Government

1022 Destination Government Destination Government

1023 Destination Government Destination Government

1024 Destination Government Destination Government

1025 Destination Government Destination Government

1026 Destination Government Destination Government

1027 Destination Government Destination Government

1028 Destination Government Destination Government

1029 Destination Government Destination Government

1030 Destination Government Destination Government

1031 Destination Government Destination Government

1032 Destination Government Destination Government

1033 Destination Government Destination Government

1034 Destination Government Destination Government

1035 Destination Government Destination Government

1036 Destination Government Destination Government

1037 Destination Government Destination Government

1038 Destination Government Destination Government

1039 Destination Government Destination Government

1040 Destination Government Destination Government

1041 Destination Government Destination Government

1042 Destination Government Destination Government

1043 Destination Government Destination Government

1044 Destination Government Destination Government

1045 Destination Government Destination Government

1046 Destination Government Destination Government

1047 Destination Government Destination Government

1048 Destination Government Destination Government

1049 Destination Government Destination Government

2001 Destination Government Destination Government

2002 Destination Government Destination Government

2003 Destination Government Destination Government

2004 Destination Government Destination Government

2005 Destination Government Destination Government

2006 Destination Government Destination Government

2007 Destination Government Destination Government

2008 Destination Government Destination Government

2009 Destination Government Destination Government

2010 Destination Government Destination Government

2011 Destination Government Destination Government

2012 Destination Government Destination Government

2013 Destination Government Destination Government

2014 Destination Government Destination Government

2015 Destination Government Destination Government

2016 Destination Government Destination Government

2017 Destination Government Destination Government

2018 Destination Government Destination Government

2019 Destination Government Destination Government

2020 Destination Government Destination Government

2021 Destination Government Destination Government

2022 Destination Government Destination Government

2023 Destination Government Destination Government

2024 Destination Government Destination Government

2025 Destination Government Destination Government

2026 Destination Government Destination Government

2027 Destination Government Destination Government

2028 Destination Government Destination Government

2029 Destination Government Destination Government

2030 Destination Government Destination Government

2031 Destination Government Destination Government

2032 Destination Government Destination Government

2033 Destination Government Destination Government

2034 Destination Government Destination Government

2035 Destination Government Destination Government

2036 Destination Government Destination Government

2037 Destination Government Destination Government

2038 Destination Government Destination Government

2039 Destination Government Destination Government

2040 Destination Government Destination Government

2041 Destination Government Destination Government

2042 Destination Government Destination Government

2043 Destination Government Destination Government

2044 Destination Government Destination Government

2045 Destination Government Destination Government

2046 Destination Government Destination Government

2047 Destination Government Destination Government

2048 Destination Government Destination Government

2049 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

252.246-7000 Material Inspection And Receiving Report MAR 2008

Section F - Deliveries or Performance

DELIVERIES OR PERFORMANCE

SSEECCTTIIOONN FF:: DDEELLIIVVEERRIIEESS OORR PPEERRFFOORRMMAANNCCEE

F-1 PERIOD OF PERFORMANCE

a. This is a requirements contract for the maintenance, repair, alteration, and/or construction of the items specified, effective from date of award (Estimated base period is 01 Aug 11 - 31 Mar 12) as required by the statement of work and specifications. This contract also provides for two option year periods of 12 months duration to be exercised at the discretion of the government.

b. Delivery or performance shall be specified in each task order issued. Individual order performance times shall be negotiated.

F-2 CONTRACT AMOUNTS

There is no minimum guaranteed amount for this requirements contract. There is no total contract maximum limitation or purchase ceiling for this contract.

ADDITIONAL INFORMATION

F-3 HOLIDAYS

This base observes the following Federal legal holidays:

New Year’s Day 1 January

Martin Luther King’s Birthday Third Monday in January

President’s Day Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on a Sunday will be observed on the following Monday.

F-4 PERFORMANCE

a. All work performed by the contractor is guided by the drawings/plans. It is the contractor’s responsibility to read and understand these requirements. If the contractor does not agree with the specifications and/or the drawings/plans for whatever reason, it is their responsibility to bring this to the attention of the

Contracting Officer during discussions. Omissions from the drawings/plans or the misdirection of details of work which are necessary to carry out the intent of…