FA465918R0001.pdf
PDF 2 MB Posted
- Attached to
- Grand Forks AFB Base Paving Federal contract opportunity
- Solicitation number
- FA465918R0001
About this file
FA465918R0001 SF 1442
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_Specifications.pdf | ||
| Attachment_2_JFSD201710_Drawings.pdf | ||
| Attachment_6_Green_Procurement_Waiver_Form.pdf | ||
| Attachment_7_Financial_Institution_Ref_Sheet.pdf | ||
| Attachment_8_PP_Questionnaire.pdf | ||
| Attachment_4_Climatological_Summary.pdf | ||
| Attachment_5_Construction_Wage_Determination.pdf | ||
| Attachment_9_RFP_Cover_Letter.pdf | ||
| Attachment_3_JFSD201710_Material_Submittal_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Period of performance for this contract w ill be one (1) base year and four (4) option years. Winter exclusion shall be from 1 November through 15 April each year.
Type of Contract: Firm-Fixed Price, Requirements-Type. The quantities on the price schedule reflect the Governemnt's best estimate, but are not representations of the quantities that w ill be required or ordered.
The Notice to Proceed for each task order w ill be issued at the time desiginated in each task order.
Contractors shall be registered in the System for Aw ard Mangagement (SAM) to be eligible to receive an aw ard under this solicitation.
This acquisition is being set aside for 100% Total Small Business under NAICS 237310, Highw ay, Street and Bridge Construction w ith a small business size standard of $36.5M
Minimum task order amount w ill be $2,000.00 and the maximum task order amount w ill be $2,000,000.00 per clause 52.216-19, Order Limitations.
In accordance w ith DFARS 236.204(ii), Disclosure of Magnitude of Construction Projects, the magnitude of this contract is betw een
$25,000,000.00 and $100,000,000.00.
DARRELL SCOTT HAAS 701-747-5285
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20-Jul-2018
(RFP)
(IFB)
X
CALL:
Base Paving
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Aug 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
319 CONTRACTING FLIGHT
295 STEEN BLVD, BLDG 242
GRAND FORKS AFB ND 58205 6436
FA4659
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
JFSD201710
8. ADDRESS OFFER TO (If Other Than Item 7)
(701) 747-4215FAX:TEL: (701) 747-5287 TEL: FAX:
FA465918R0001 185
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA465918R0001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Base Year
FFP
Base Paving base year
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AA 10,000 Net Ton
(2,000
LB).
Bituminous Asphalt
Provide and place in accordance with Section 02551-1, 2.1, 2.2 of attachment 1.
Includes delivery cost.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AB 15,000 Square
Yard
Geo-Textile
Provide and place geo-textile fabric in accordance with section 02551-1, 2.5 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AC 15,000 Square
Tack Coat
Provide and place tack coat in accordance with section 02551-1 of attachment 1.
Line item also includes costs and work associated with but not limited to surface preparation.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AD 15,000 Square
Prime Coat
Provide and place prime coat in accordance with section 02551-1 of the attachment
1. Line item includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AE 1,000 Square
Minor Patch
Line item includes costs and work associated with but not limited to performing the work in accordance with section 02551-1, 5, 5.1 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AF 1,000 Square
Major Patch
Line item includes costs and work associated with but not limited to performing the work in accordance with section 02551-1, 5, 5.2 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AG 20,000 Linear
Foot
Seal Cracks
Line items includes costs and work associated with but not limited to performing the work in accordance with section 02551-1, 6 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AH 12,000 Linear
Remove and Replace > 30'
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AJ 600 Linear
Remove and Replace Curb < 30'
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AK 1,000 Linear
Install New Curbs
Perform in accordance with section 02551-1, 2.3, 8, 9.2 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AL 12,000 Square
Remove and Replace 4" Sidewalk > 150 SF.
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with specifications located in section 02551-1, 2.3, 8, 9.1 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AM 500 Square
Remove and Replace 4" Sidewalk < 150 SF
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AN 2,500 Square
Install New 4" sidewalk
Includes formwork and excavation in accordance with specifications located in section 02551-1, 2.3, 8, 9.1 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AP 30 Each Raise/Lower Manholes
FFP
Includes excavation and backfill. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AQ 20 Linear
New Manholes
Includes new manhole with the excavation and backfill of the new hole.
Specifications located in section 02551-1 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AR 25 Each Castings
FFP
Includes the option of either manhole casting or storm sewer casting/inlet.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AS 8 Each Repair Sewer Inlet
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AT 20 Linear
New Storm Inlets
Includes excavation, backfill & compaction. Specifications located in section
02551-1, 8 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AU 1,000 Linear
New 18" PVC Storm Sewer
Includes excavation, bedding, compaction and backfill. Specifications located in section 02551-1, 8 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AV 22,000 Square
Pavement Milling
Includes transporting material off the installation. Specifications located in section
02551-1 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AW 6,200 Cubic
Asphalt Removal
Includes disposal of asphalt. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AX 5,500 Cubic
Concrete Removal
Includes disposal of concrete. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AY 17,800 Cubic
Excavation and Removal
Includes the transporation of material off the installation. Specifications located in section 02551-1 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AZ 14,000 Cubic
Backfill and Compaction
Includes transportion, spreading and compaction in accordance with specifications located in section 02551-1, 8 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BA 4,500 Cubic
Concrete
Specifications are located in section 02551-1, 2.3 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BB 1,600 Square
Slurry Seal (Type 1)
Specification located in section 02551-1, 7 of attachment 1. Includes oil and aggregate.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BC 5,000 Cubic
Topsoil
Includes transportation, spreading and compaction as needed. Specification located in section 02551-1 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BD 55,000 Square
Hydro-Mulching
In accordance with the specifications located in section 329219 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BE 12,500 Square
Sodding
In accordance with the specifications located in section 02922 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BF 10,000 Linear
6" Street Striping
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BG 10,000 Linear
6" Parking Lot Striping
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BH 20 Quarter
Hours
Security Delays
Cost for 1/4 hour delay for crew due to non-normal circumstances.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BJ 50 Cubic
Colored Concrete
Includes forms and completion of work as per concrete specifications located in section 02551-1, 2.3 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BK 25,000 Square
Concrete Pattern Stamping
Includes layout, stamps, powders, accent colors and sealant. Specifications located in section 01000-2.13, 02551-2.3 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BL 300 Linear
Remove and Reinstall Chain Link Fence
Perform in accordance with the specifications located in section 02831 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BM 1,600 Square
New 3" Bituminous Multi-use Path
Includes excavation, backfill, aggregate, geotextile and other associated work.
Specifications located in section 02551-1, 2, 2.1, 2.2, 2.5, 8, Section 02922, and section 329219 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BN 5 Each Light Base Foundation
FFP
Includes excavation, backfill, concrete, reinforcment, electrical and other associated work. Specifications located in section 16375, section 02551-1, 2.3, and
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BP 2,500 Linear
Utility Trenching
Includes excavation, backfill, non-metallic conduit, and other associated work.
Specifications located in section 02551-1, section 16375, and section 329219 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BQ 10 Lot Geographic Information System and CADD
FFP
Geographic Information System (GIS) and Computer Aided Drafting and Design
(CADD) deliverables in accordance with the specifications listed in each individual task order.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BR 20 Each Relocate Signs
FFP
Specifications located in section 02763A-1, 3.4 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BS 12 Each Install New Traffic Signs
FFP
Specifications located in section 02763A-1, 2.7, 2.8, 2.9, 2.10, 2.11, 3.4 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BT 500 Square
Detectable Warning Plates
Material and Installation. Specifications located in section 02551-1 of attachment
1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BU 5,000 Pounds
Net
Rebar
Material and placement of rebar, dowels for reinforced concrete includes chairs and wire ties.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BV 12 Each Install New Reserved Parking
FFP
Install New Reserved Parking and Handicapped Signs. Specifications located in section 02763A-1, 2.7, 2.8, 2.9, 2.10, 2.11, 3.4. of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BW 5 Each Install New Lightpoles and Fixtures
FFP
Includes mounting poles on base and LED fixtures with photocell on pole.
Specifications located in sectio 16375 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BX 2,500 Linear
Electrical
Provide and install by pulling through conduit, 3(QTY) #8 stranded copper wire and make all necessary connections. Specifications located in section 16375 of
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BY 10 Each Remove Existing Light Poles
FFP
Includes removal of poles, electrical, bases and backfill. Specifications located in section 16375 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BZ 300 Linear
Install New Handrail
Specification located in section 055200 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Option Year 1
Base Paving Option Year 1
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AA 10,000 Net Ton
OPTION Bituminous Asphalt
Provide and place in accordance with Section 02551-1, 2.1, 2.2 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AB 15,000 Square
OPTION Geo-Textile
Provide and place geo-textile fabric in accordance with section 02551-1, 2.5 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AC 15,000 Square
OPTION Tack Coat
Provide and place tack coat in accordance with section 02551-1 of attachment 1.
Line item also includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AD 15,000 Square
OPTION Prime Coat
Provide and place prime coat in accordance with section 02551-1 of the attachment
1. Line item includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AE 1,000 Square
OPTION Minor Patch
Line item includes costs and work associated with but not limited to performing the
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AF 1,000 Square
OPTION Major Patch
Line item includes costs and work associated with but not limited to performing the
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AG 20,000 Linear
OPTION Seal Cracks
Line items includes costs and work associated with but not limited to performing
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AH 12,000 Linear
OPTION Remove and Replace > 30'
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AJ 600 Linear
OPTION Remove and Replace Curb < 30'
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AK 1,000 Linear
OPTION Install New Curbs
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AL 12,000 Square
OPTION Remove and Replace 4" Sidewalk > 150 SF.
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AM 500 Square
OPTION Remove and Replace 4" Sidewalk < 150 SF
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AN 2,500 Square
OPTION Install New 4" sidewalk
Includes formwork and excavation in accordance with specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AP 30 Each OPTION Raise/Lower Manholes
FFP
Includes excavation and backfill. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AQ 20 Linear
OPTION New Manholes
Includes new manhole with the excavation and backfill of the new hole.
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AR 25 Each OPTION Castings
FFP
Includes the option of either manhole casting or storm sewer casting/inlet.
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AS 8 Each OPTION Repair Sewer Inlet
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AT 20 Linear
OPTION New Storm Inlets
Includes excavation, backfill & compaction. Specifications located in section
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AU 1,000 Linear
OPTION New 18" PVC Storm Sewer
Includes excavation, bedding, compaction and backfill. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AV 22,000 Square
OPTION Pavement Milling
Includes transporting material off the installation. Specifications located in section
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AW 6,200 Cubic
OPTION Asphalt Removal
Includes disposal of asphalt. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AX 5,500 Cubic
OPTION Concrete Removal
Includes disposal of concrete. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AY 17,800 Cubic
OPTION Excavation and Removal
Includes the transporation of material off the installation. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AZ 14,000 Cubic
OPTION Backfill and Compaction
Includes transportion, spreading and compaction in accordance with specifications
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BA 4,500 Cubic
OPTION Concrete
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BB 1,600 Square
OPTION Slurry Seal (Type 1)
Specification located in section 02551-1, 7 of attachment 1. Includes oil and
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BC 5,000 Cubic
OPTION Topsoil
Includes transportation, spreading and compaction as needed. Specification located
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BD 55,000 Square
OPTION Hydro-Mulching
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BE 12,500 Square
OPTION Sodding
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BF 10,000 Linear
OPTION 6" Street Striping
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BG 10,000 Linear
OPTION 6" Parking Lot Striping
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BH 20 Quarter
OPTION Security Delays
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BJ 50 Cubic
OPTION Colored Concrete
Includes forms and completion of work as per concrete specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BK 25,000 Square
OPTION Concrete Pattern Stamping
Includes layout, stamps, powders, accent colors and sealant. Specifications located
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BL 300 Linear
OPTION Remove and Reinstall Chain Link Fence
Perform in accordance with the specifications located in section 02831 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BM 1,600 Square
OPTION New 3" Bituminous Multi-use Path
Includes excavation, backfill, aggregate, geotextile and other associated work.
Specifications located in section 02551-1, 2, 2.1, 2.2, 2.5, 8, Section 02922, and
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BN 5 Each OPTION Light Base Foundation
FFP
Includes excavation, backfill, concrete, reinforcment, electrical and other associated work. Specifications located in section 16375, section 02551-1, 2.3, and
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BP 2,500 Linear
OPTION Utility Trenching
Includes excavation, backfill, non-metallic conduit, and other associated work.
Specifications located in section 02551-1, section 16375, and section 329219 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BQ 10 Lot OPTION Geographic Information System and CADD
FFP
Geographic Information System (GIS) and Computer Aided Drafting and Design
(CADD) deliverables in accordance with the specifications listed in each individual
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BR 20 Each OPTION Relocate Signs
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BS 12 Each OPTION Install New Traffic Signs
FFP
Specifications located in section 02763A-1, 2.7, 2.8, 2.9, 2.10, 2.11, 3.4 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BT 500 Square
OPTION Detectable Warning Plates
Material and Installation. Specifications located in section 02551-1 of attachment
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BU 5,000 Pounds
OPTION Rebar
Material and placement of rebar, dowels for reinforced concrete includes chairs
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BV 12 Each OPTION Install New Reserved Parking
FFP
Install New Reserved Parking and Handicapped Signs. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BW 5 Each OPTION Install New Lightpoles and Fixtures
FFP
Includes mounting poles on base and LED fixtures with photocell on pole.
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BX 2,500 Linear
OPTION Electrical
Provide and install by pulling through conduit, 3(QTY) #8 stranded copper wire and make all necessary connections. Specifications located in section 16375 of
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BY 10 Each OPTION Remove Existing Light Poles
FFP
Includes removal of poles, electrical, bases and backfill. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BZ 300 Linear
OPTION Install New Handrail
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Option Year 2
Base Paving Option Year 2
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AA 10,000 Net Ton
Provide and place in accordance with Section 02551-1, 2.1, 2.2 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AB 15,000 Square
Provide and place geo-textile fabric in accordance with section 02551-1, 2.5 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AC 15,000 Square
Provide and place tack coat in accordance with section 02551-1 of attachment 1.
Line item also includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AD 15,000 Square
Provide and place prime coat in accordance with section 02551-1 of the attachment
1. Line item includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AE 1,000 Square
Line item includes costs and work associated with but not limited to performing the
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AF 1,000 Square
Line item includes costs and work associated with but not limited to performing the
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AG 20,000 Linear
Line items includes costs and work associated with but not limited to performing
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AH 12,000 Linear
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AJ 600 Linear
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AK 1,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AL 12,000 Square
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AM 500 Square
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AN 2,500 Square
Includes formwork and excavation in accordance with specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AP 30 Each OPTION Raise/Lower Manholes
FFP
Includes excavation and backfill. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AQ 20 Linear
Includes new manhole with the excavation and backfill of the new hole.
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AR 25 Each OPTION Castings
FFP
Includes the option of either manhole casting or storm sewer casting/inlet.
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AS 8 Each OPTION Repair Sewer Inlet
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AT 20 Linear
Includes excavation, backfill & compaction. Specifications located in section
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AU 1,000 Linear
Includes excavation, bedding, compaction and backfill. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AV 22,000 Square
Includes transporting material off the installation. Specifications located in section
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AW 6,200 Cubic
Includes disposal of asphalt. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AX 5,500 Cubic
Includes disposal of concrete. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AY 17,800 Cubic
Includes the transporation of material off the installation. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AZ 14,000 Cubic
Includes transportion, spreading and compaction in accordance with specifications
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BA 4,500 Cubic
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BB 1,600 Square
Specification located in section 02551-1, 7 of attachment 1. Includes oil and
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BC 5,000 Cubic
Includes transportation, spreading and compaction as needed. Specification located
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BD 55,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BE 12,500 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BF 10,000 Linear
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BG 10,000 Linear
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BH 20 Quarter
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BJ 50 Cubic
Includes forms and completion of work as per concrete specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BK 25,000 Square
Includes layout, stamps, powders, accent colors and sealant. Specifications located
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BL 300 Linear
Perform in accordance with the specifications located in section 02831 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BM 1,600 Square
Includes excavation, backfill, aggregate, geotextile and other associated work.
Specifications located in section 02551-1, 2, 2.1, 2.2, 2.5, 8, Section 02922, and
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BN 5 Each OPTION Light Base Foundation
FFP
Includes excavation, backfill, concrete, reinforcment, electrical and other associated work. Specifications located in section 16375, section 02551-1, 2.3, and
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BP 2,500 Linear
Includes excavation, backfill, non-metallic conduit, and other associated work.
Specifications located in section 02551-1, section 16375, and section 329219 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BQ 10 Lot OPTION Geographic Information System and CADD
FFP
Geographic Information System (GIS) and Computer Aided Drafting and Design
(CADD) deliverables in accordance with the specifications listed in each individual
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BR 20 Each OPTION Relocate Signs
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BS 12 Each OPTION Install New Traffic Signs
FFP
Specifications located in section 02763A-1, 2.7, 2.8, 2.9, 2.10, 2.11, 3.4 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BT 500 Square
Material and Installation. Specifications located in section 02551-1 of attachment
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BU 5,000 Pounds
Material and placement of rebar, dowels for reinforced concrete includes chairs
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BV 12 Each OPTION Install New Reserved Parking
FFP
Install New Reserved Parking and Handicapped Signs. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BW 5 Each OPTION Install New Lightpoles and Fixtures
FFP
Includes mounting poles on base and LED fixtures with photocell on pole.
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BX 2,500 Linear
Provide and install by pulling through conduit, 3(QTY) #8 stranded copper wire and make all necessary connections. Specifications located in section 16375 of
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BY 10 Each OPTION Remove Existing Light Poles
FFP
Includes removal of poles, electrical, bases and backfill. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BZ 300 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Option Year 3
Base Paving option year 3
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AA 10,000 Net Ton
Provide and place in accordance with Section 02551-1, 2.1, 2.2 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AB 15,000 Square
Provide and place geo-textile fabric in accordance with section 02551-1, 2.5 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AC 15,000 Square
Provide and place tack coat in accordance with section 02551-1 of attachment 1.
Line item also includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AD 15,000 Square
Provide and place prime coat in accordance with section 02551-1 of the attachment
1. Line item includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AE 1,000 Square
Line item includes costs and work associated with but not limited to performing the
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AF 1,000 Square
Line item includes costs and work associated with but not limited to performing the
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AG 20,000 Linear
Line items includes costs and work associated with but not limited to performing
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AH 12,000 Linear
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AJ 600 Linear
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AK 1,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AL 12,000 Square
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AM 500 Square
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AN 2,500 Square
Includes formwork and excavation in accordance with specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AP 30 Each OPTION Raise/Lower Manholes
FFP
Includes excavation and backfill. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AQ 20 Linear
Includes new manhole with the excavation and backfill of the new hole.
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AR 25 Each OPTION Castings
FFP
Includes the option of either manhole casting or storm sewer casting/inlet.
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AS 8 Each OPTION Repair Sewer Inlet
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AT 20 Linear
Includes excavation, backfill & compaction. Specifications located in section
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AU 1,000 Linear
Includes excavation, bedding, compaction and backfill. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AV 22,000 Square
Includes transporting material off the installation. Specifications located in section
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AW 6,200 Cubic
Includes disposal of asphalt. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AX 5,500 Cubic
Includes disposal of concrete. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AY 17,800 Cubic
Includes the transporation of material off the installation. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AZ 14,000 Cubic
Includes transportion, spreading and compaction in accordance with specifications
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BA 4,500 Cubic
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BB 1,600 Square
Specification located in section 02551-1, 7 of attachment 1. Includes oil and
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BC 5,000 Cubic
Includes transportation, spreading and compaction as needed. Specification located
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BD 55,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BE 12,500 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BF 10,000 Linear
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BG 10,000 Linear
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BH 20 Quarter
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BJ 50 Cubic
Includes forms and completion of work as per concrete specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BK 25,000 Square
Includes layout, stamps, powders, accent colors and sealant. Specifications located
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BL 300 Linear
Perform in accordance with the specifications located in section 02831 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BM 1,600 Square
Includes excavation, backfill, aggregate, geotextile and other associated work.
Specifications located in section 02551-1, 2, 2.1, 2.2, 2.5, 8, Section 02922, and
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BN 5 Each OPTION Light Base Foundation
FFP
Includes excavation, backfill, concrete, reinforcment, electrical and other associated work. Specifications located in section 16375, section 02551-1, 2.3, and
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BP 2,500 Linear
Includes excavation, backfill, non-metallic conduit, and other associated work.
Specifications located in section 02551-1, section 16375, and section 329219 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BQ 10 Lot OPTION Geographic Information System and CADD
FFP
Geographic Information System (GIS) and Computer Aided Drafting and Design
(CADD) deliverables in accordance with the specifications listed in each individual
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BR 20 Each OPTION Relocate Signs
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BS 12 Each OPTION Install New Traffic Signs
FFP
Specifications located in section 02763A-1, 2.7, 2.8, 2.9, 2.10, 2.11, 3.4 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BT 500 Square
Material and Installation. Specifications located in section 02551-1 of attachment
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BU 5,000 Pounds
Material and placement of rebar, dowels for reinforced concrete includes chairs
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BV 12 Each OPTION Install New Reserved Parking
FFP
Install New Reserved Parking and Handicapped Signs. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BW 5 Each OPTION Install New Lightpoles and Fixtures
FFP
Includes mounting poles on base and LED fixtures with photocell on pole.
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BX 2,500 Linear
Provide and install by pulling through conduit, 3(QTY) #8 stranded copper wire and make all necessary connections. Specifications located in section 16375 of
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BY 10 Each OPTION Remove Existing Light Poles
FFP
Includes removal of poles, electrical, bases and backfill. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BZ 300 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Base Year
Base Paving base year
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AA 10,000 Net Ton
Provide and place in accordance with Section 02551-1, 2.1, 2.2 of attachment 1.
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AB 15,000 Square
Provide and place geo-textile fabric in accordance with section 02551-1, 2.5 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AC 15,000 Square
Provide and place tack coat in accordance with section 02551-1 of attachment 1.
Line item also includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AD 15,000 Square
Provide and place prime coat in accordance with section 02551-1 of the attachment
1. Line item includes costs and work associated with but not limited to surface
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AE 1,000 Square
Line item includes costs and work associated with but not limited to performing the
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AF 1,000 Square
Line item includes costs and work associated with but not limited to performing the
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AG 20,000 Linear
Line items includes costs and work associated with but not limited to performing
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AH 12,000 Linear
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AJ 600 Linear
Includes surveying and site development, disposal of material, recompaction of existing base course. Specifications located in section 02551-1, 2.3, 8, 9.2 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AK 1,000 Linear
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AL 12,000 Square
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AM 500 Square
Remove without damage to adjacent pavement or sidewalk, site development, recompaction of existing base course, placement of concrete in accordance with
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AN 2,500 Square
Includes formwork and excavation in accordance with specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AP 30 Each OPTION Raise/Lower Manholes
FFP
Includes excavation and backfill. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AQ 20 Linear
Includes new manhole with the excavation and backfill of the new hole.
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AR 25 Each OPTION Castings
FFP
Includes the option of either manhole casting or storm sewer casting/inlet.
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AS 8 Each OPTION Repair Sewer Inlet
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AT 20 Linear
Includes excavation, backfill & compaction. Specifications located in section
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AU 1,000 Linear
Includes excavation, bedding, compaction and backfill. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AV 22,000 Square
Includes transporting material off the installation. Specifications located in section
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AW 6,200 Cubic
Includes disposal of asphalt. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AX 5,500 Cubic
Includes disposal of concrete. Specifications located in section 02551-1 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AY 17,800 Cubic
Includes the transporation of material off the installation. Specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AZ 14,000 Cubic
Includes transportion, spreading and compaction in accordance with specifications
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BA 4,500 Cubic
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BB 1,600 Square
Specification located in section 02551-1, 7 of attachment 1. Includes oil and
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BC 5,000 Cubic
Includes transportation, spreading and compaction as needed. Specification located
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BD 55,000 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BE 12,500 Square
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BF 10,000 Linear
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BG 10,000 Linear
Includes site layout and development. Specifications located in section 02763A of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BH 20 Quarter
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BJ 50 Cubic
Includes forms and completion of work as per concrete specifications located in
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BK 25,000 Square
Includes layout, stamps, powders, accent colors and sealant. Specifications located
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BL 300 Linear
Perform in accordance with the specifications located in section 02831 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BM 1,600 Square
Includes excavation, backfill, aggregate, geotextile and other associated work.
Specifications located in section 02551-1, 2, 2.1, 2.2, 2.5, 8, Section 02922, and
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BN 5 Each OPTION Light Base Foundation
FFP
Includes excavation, backfill, concrete, reinforcment, electrical and other associated work. Specifications located in section 16375, section 02551-1, 2.3, and
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BP 2,500 Linear
Includes excavation, backfill, non-metallic conduit, and other associated work.
Specifications located in section 02551-1, section 16375, and section 329219 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BQ 10 Lot OPTION Geographic Information System and CADD
FFP
Geographic Information System (GIS) and Computer Aided Drafting and Design
(CADD) deliverables in accordance with the specifications listed in each individual
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BR 20 Each OPTION Relocate Signs
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BS 12 Each OPTION Install New Traffic Signs
FFP
Specifications located in section 02763A-1, 2.7, 2.8, 2.9, 2.10, 2.11, 3.4 of
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BT 500 Square
Material and Installation. Specifications located in section 02551-1 of attachment
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BU 5,000 Pounds
Material and placement of rebar, dowels for reinforced concrete includes chairs
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BV 12 Each OPTION Install New Reserved Parking
FF