statement_of_work_floors_6_July_17.pdf

PDF 241 KB Posted

Attached to
Fire Station Floor Coating
Solicitation number
FA4659-17-Q-0051
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
20170628_Fire_Floor_Model_(1)[1].pdf PDF
ND170017_Wage_Determination.pdf PDF
Combined_Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GFAFB Fire Department Coating and Sealing Station Floors‐ PWS

Performance of Work Statement (PWS)

319th Civil Engineer Fire Emergency Services

Coating and Sealing Station Floors Building 633

Prepared by SSgt Douglas C. Pierre

Grand Forks AFB, ND

June 29, 2017

1. Description.

The stall floors and outlying office/storage space floors are bare concrete and have not been sealed properly allowing stains and oil to penetrate the floors. The stall floors need to be stripped, cleaned, painted and sealed to ensure that in the future the floors will not be stained and easier to clean.

2. Work Request Description

The Contractor shall prepare the floor and remove any oil stains and residue. The contactor will apply a commercial grade sealant, commercial grade paint medium grey with 4in road yellow lines in 12 stalls, and commercial grade oil and chemical resistant clear coat. The estimated square footage of the total flooring is 13,198.6 square feet. Contractor is responsible for verifying measurements for accuracy.

3. Requirements/Specifications

1. Prepare all surfaces in accordance with industry specifications including filling in any cracks

- Grade must remain the same during any preparation work to ensure proper drainage to floor drains.

- Any dust created in the preparation of the floors will need to be collected/contained in accordance with OSHA 1910.1053

2. Apply Norklad 200 medium grey (or equal) in accordance with industry specifications.

Apply epoxy to manufactures specifications.

3. In each of the 12 stalls, apply a 34 foot X 4 inch traffic yellow reflective stripe to assist in backing up vehicles.

4. Apply two coats of a commercial grade non-slip, oil and chemical resistant clear coat in accordance with industry specification.

4. Period of Performance

Work will be done in three phases, each phase will be allocated 7calendar days to complete.

Total work time should take no more than 21 days. During each phase, any items that need to be moved to allow work to be done will be accomplished by fire department personnel. If the weather conditions are not suitable for the adhesion/cure times additional days may be requested at no additional cost to the government.

5. Access to the Installation.

The contractor will submit to all applicable background checks prior to receiving a contractor’s badge to accomplish work or enter the installation. Contracting Office Representative will assist in obtaining appropriate paperwork for base access (SF74).

6. Protection of Government Property

The contractor shall use care to avoid damaging existing buildings, equipment and vegetation on the government installation. If the contractor fails to use care and causes damage to any of this property, the contractor shall replace or repair the damage at no expense to the government as the contracting officer directs. If the contractor fails or refuses to make such repair or replacement, the contractor shall be liable for the cost which may be deducted from the contract price.

7. Housekeeping

The Contractor shall keep all facilities and work areas clean and neat IAW industry standards, Occupational Safety and Administration (OSHA), fire and safety standards. All refuse generated from this project shall be collected and disposed of by contractor provided refuse container.

Refuse shall be disposed of off base and IAW local and State regulations and laws.

8. Hours of Operation

The contractor will have access to the areas needed during each phase from 0800-2000, personnel are working in the station on 24 hour operations.

9. Warranty

The contractor shall offer a warranty of at least one (1) year for any manufacturer or workmanship related defect/failure.

10. Attachments

Floor plans with square footage, areas needing coating and sealing are outlined in red.