JSFD960148
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment to FA4659-15-R-0006 Repair Bldg. 101 Roof is to:
A.Replace w age determination ND150022 dated 2 January 2015 w ith revised w age determination ND150022 dated 8 May 2015.
B. The RFP end date has been extended to 1:00PM on 1 July 2015.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jun-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-15-R-0006
X 9B. DATED (SEE ITEM 11)
05-May-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jun-2015
CODE
319 CONTRACTING FLIGHT
575 TUSKEGEE AIRMEN BLVD
GRAND FORKS AFB ND 58205 6436
FA4659 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4659-15-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 05-Jun-2015 01:00 PM to 01-Jul-2015 01:00 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
ITEM # of Pages
1. Building Wage Decision ND150022 Dated 01/02/2015 5
2. Schedule of Drawings 2
3. Waiver Green Procurement Form 1
LIST OF EXTERNAL ATTACHMENTS
1. JFSD 201215 Technical Specifications 358
2. JFSD 201215 Drawings 72
3. JFSD 201215 Material Submittal Schedule 3
4. Climatological Summary for Grand Forks AFB, ND 3
5. Financial Institution Reference Sheet 1
6. Past Performance Questionairre w/ cover letter 5
General Decision Number: ND150022 05/08/2015 ND22
Superseded General Decision Number: ND20140022
State: North Dakota
Construction Type: Building
County: Grand Forks County in North Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the
EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The
EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/02/2015
1 05/08/2015
BOIL0647-006 01/01/2014
Rates Fringes
BOILERMAKER......................$ 32.75 26.42
ELEC1426-007 06/01/2014
ELECTRICIAN......................$ 27.59 11.37
IRON0512-006 05/01/2014
IRONWORKER, STRUCTURAL...........$ 28.45 22.85
* PLAS0633-003 05/01/2015
CEMENT MASON/CONCRETE FINISHER...$ 27.90 13.60
PLASTERER........................$ 23.92 12.83
PLUM0300-020 06/02/2014
PIPEFITTER.......................$ 31.44 12.67
SHEE9010-002 06/09/2014
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 26.45 13.95
SUND2012-003 08/18/2014
BRICKLAYER.......................$ 23.47 12.34
CARPENTER........................$ 19.16 3.88
DRYWALL FINISHER/TAPER...........$ 21.48 6.66
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 19.60 4.34
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical
System Insulation)...............$ 15.80 2.60
LABORER: Common or General......$ 12.99 2.81
LABORER: Mason Tender - Brick...$ 15.32 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 14.54 3.41
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 26.00 3.82
OPERATOR: Crane.................$ 26.18 9.39
OPERATOR: Forklift..............$ 23.06 15.47
OPERATOR: Loader................$ 23.75 0.00
PAINTER (BRUSH AND ROLLER),
Excludes Drywall
Finishing/Taping.................$ 21.86 8.41
PLUMBER..........................$ 21.64 4.98
ROOFER...........................$ 16.37 2.84
SHEET METAL WORKER, Excludes
HVAC Duct Installation...........$ 27.27 7.76
TRUCK DRIVER: Dump Truck........$ 19.81 5.42
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
SCHEDULE OF DRAWINGS DATE PAGE#
G-001 COVERSHEET 23 Mar 15 1 of 72
G-002 ABBREVIATIONS 23 Mar 15 2 of 72
G-003 ABBREVIATIONS AND LEGEND 23 Mar 15 3 of 72
G-004 SECOND FLOOR EGRESS AND OCCUPANCY 23 Mar 15 4 of 72
PLAN
G-005 FIRE PROTECTION PLANS 23 Mar 15 5 of 72
G-006 STAGING PLAN 23 Mar 15 6 of 72
CU101 EXISTING SITE UTILITY PLAN 23 Mar 15 7 of 72
CD101 SITE DEMOLITION AND LAYOUT PLANS 23 Mar 15 8 of 72
L-501 SITE DETAILS 23 Mar 15 9 of 72
AD101 SECOND FLOOR AND PARTIAL FIRST FLOOR 23 Mar 15 10 of 72
DEMOLITION PLANS
AD102 ROOF DEMOLITION PLAN 23 Mar 15 11 of 72
AD103 BASEMENT AND FIRST FLOOR 23 Mar 15 12 of 72
DEMOLITION REFLECTED CEILING PLANS
AD104 SECOND FLOOR DEMOLITION REFLECTED 23 Mar 15 13 of 72
CEILING PLAN
A-101 BASEMENT AND FIRST FLOOR PLANS 23 Mar 15 14 of 72
A-102 SECOND FLOOR/LOWER ATTIC PLAN 23 Mar 15 15 of 72
A-103 UPPER ATTIC PLAN 23 Mar 15 16 of 72
A-104 ROOF PLAN AND DETAILS 23 Mar 15 17 of 72
A-105 BASEMENT AND FIRST FLOOR REFLECTED 23 Mar 15 18 of 72
CEILING PLANS
A-106 SECOND FLOOR REFLECTED CEILING PLAN 23 Mar 15 19 of 72
A-201 EXTERIOR DEMOLITION ELEVATIONS 23 Mar 15 20 of 72
A-202 EXTERIOR DEMOLITION ELEVATIONS 23 Mar 15 21 of 72
A-203 EXTERIOR ELEVATIONS 23 Mar 15 22 of 72
A-204 EXTERIOR ELEVATIONS 23 Mar 15 23 of 72
A-301 BUILDING SECTIONS 23 Mar 15 24 of 72
A-302 BUILDING SECTIONS 23 Mar 15 25 of 72
A-303 BUILDING SECTIONS AND DETAILS 23 Mar 15 26 of 72
A-304 DETAILS 23 Mar 15 27 of 72
A-305 DETAILS 23 Mar 15 28 of 72
A-306 DETAILS 23 Mar 15 29 of 72
A-307 DETAILS 23 Mar 15 30 of 72
A-401 ENLARGED PLANS AND DETAIL 23 Mar 15 31 of 72
A-601 ROOM FINISH SCHEDULE 23 Mar 15 32 of 72
A-602 WALL TYPES AND DETAILS 23 Mar 15 33 of 72
A-603 DOOR AND FRAME SCHEDULE, DOOR TYPES, 23 Mar 15 34 of 72
FRAME TYPES AND DETAILS
FG101 FIRE PROTECTION SYMBOLS LEGEND AND 23 Mar 15 35 of 72
GENERAL NOTES
FS101 SITE FIRE PROTECTION PLAN 23 Mar 15 36 of 72
FX100 BASEMENT FIRE PROTECTION PLAN 23 Mar 15 37 of 72
FX101 FIRST FLOOR FIRE PROTECTION PLAN 23 Mar 15 38 of 72
FX102 SECOND FLOOR FIRE PROTECTION PLAN 23 Mar 15 39 of 72
FX201 FIRE PROTECTION RISERS AND DETAILS 23 Mar 15 40 of 72
FA101 BASEMENT AND FIRST FLOOR FIRE ALARM 23 Mar 15 41 of 72
PLANS
FA102 SECOND FLOOR/LOWER ATTIC FIRE ALARM 23 Mar 15 42 of 72
PLAN
FA103 UPPER ATTIC FIRE ALARM PLAN 23 Mar 15 43 of 72
FA201 FIRE ALARM RISERS AND DETAILS 23 Mar 15 44 of 72
S-001 STRUCTURAL GENERAL NOTES 23 Mar 15 45 of 72
S-100 COMPOSITE FRAMING PLAN - EXISTING 23 Mar 15 46 of 72
FRAMING/NEW POST BEARING
SF101 COMPOSITE FRAMING PLAN - ROOF 23 Mar 15 47 of 72
TRUSSES & SUPPORT FRAMING
S-301 STRUCTURAL DETAILS 23 Mar 15 48 of 72
S-302 STRUCTURAL DETAILS 23 Mar 15 49 of 72
S-303 STRUCTURAL DETAILS 23 Mar 15 50 of 72
S-304 STRUCTURAL DETAILS 23 Mar 15 51 of 72
MG101 MECHANICAL GENERAL NOTES AND 23 Mar 15 52 of 72
SYMBOLS LEGEND
MD101 BASEMENT AND FIRST FLOOR DEMOLITION 23 Mar 15 53 of 72
MECHANICAL PLANS
MD102 SECOND FLOOR DEMOLITION MECHANICAL 23 Mar 15 54 of 72
PLANS
MD103 ROOF DEMOLITION MECHANICAL PLAN 23 Mar 15 55 of 72
M-101 BASEMENT AND FIRST FLOOR MECHANICAL 23 Mar 15 56 of 72
PLANS
M-102 SECOND FLOOR/LOWER ATTIC MECHANICAL 23 Mar 15 57 of 72
PLAN
M-103 UPPER ATTIC MECHANICAL PLAN 23 Mar 15 58 of 72
M-104 ROOF MECHANICAL PLAN 23 Mar 15 59 of 72
M-501 MECHANICAL DETAILS 23 Mar 15 60 of 72
M-601 MECHANICAL CONTROL SEQUENCES 23 Mar 15 61 of 72
M-602 MECHANICAL SCHEDULES 23 Mar 15 62 of 72
EG101 ELECTRICAL GENERAL NOTES AND SYMBOLS 23 Mar 15 63 of 72
LEGEND
ED101 BASEMENT AND FIRST FLOOR DEMOLITION 23 Mar 15 64 of 72
ELECTRICAL PLANS
ED102 SECOND FLOOR/LOWER ROOF DEMOLITION 23 Mar 15 65 of 72
ELECTRICAL PLAN
ED103 UPPER ROOF DEMOLITION ELECTRICAL PLAN 23 Mar 15 66 of 72
E-101 BASEMENT AND FIRST FLOOR ELECTRICAL PLANS 23 Mar 15 67 of 72
E-102 SECOND FLOOR/LOWER ATTIC LIGHTING PLAN 23 Mar 15 68 of 72
E-103 SECOND FLOOR/LOWER ATTIC POWER AND 23 Mar 15 69 of 72
SPECIAL SYSTEMS PLAN
E-104 UPPER ATTIC ELECTRICAL PLAN 23 Mar 15 70 of 72
E-105 ROOF ELECTRICAL PLAN 23 Mar 15 71 of 72
E-601 ELECTRICAL SCHEDULES AND DETAILS 23 Mar 15 72 of 72
WAIVER GREEN PROCUREMENT FORM
(Documentation of Non Purchases)
This form is to be utilized by the contractor to record non-purchases of Green Procurement
Products Listed on the EPA’s Web Site www.epa.gov/cpg/products.htm
ITEM:______________________________________________
I have determined that the following Affirmative Procurement Product was considered for purchase but will not be purchased for the following reasons:
Item is not available within a reasonable period of time.
Date Needed: _________________ Date Item would be available: _______________
Item fails to meet a performance standard in the specifications.
Specifically, Item Cost More than the Green Procurement Item.
Price of Green Procurement Item ________________________________________
Price of Non-Green Procurement Item ____________________________________
Contractor Name Contractor Signature Date
QAE/Inspector Name QAE/Inspector Signature Date
Contracting Officer Name Contracting Officer Signature Date
(End of Summary of Changes) http://www.epa.gov/cpg/products.htm