FD_Amend_2.doc
DOC document 863 KB Posted
- Attached to
- Repair Fire Department Federal contract opportunity
- Solicitation number
- FA4654-14-R-0003
About this file
Amendment 2 - Q A and list of site visit attendees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment_1.pdf | ||
| 112006_DRAWINGS_signed.pdf | ||
| Specs_July15.pdf | ||
| FD_SOLICITATION.doc | DOC document | |
| Wage_Determination.docx | DOCX document | |
| Specs_July15.pdf | ||
| Wage_Determination.docx | DOCX document | |
| 112006_DRAWINGS_signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
Q & A AND SITE VISIT ATTENDEES
QUESTION: #1. Please reference drawing A-002, Architectural General Note 3. which states that "Prior to submission of bid, the contractor shall visit the site to review all existing conditions related to this project scope of work". Does this mean that our bid will not be accepted if we did not attend the official site visit held on 8/13/14? Would it be possible to schedule a second site visit so we (and other bidders) can ensure that we comply with this requirement?
ANSWER: #1. Bids will not be rejected if the site visit was not attended; however, bidders are responsible for knowing the existing conditions and ample opportunity was given to see all conditions prior to bid. No additional site visit will be scheduled.
QUESTION: #2. Can the HSS 6x6x1/4 column be done in phase 3?
ANSWER:#2. Bid per current phasing plan.
QUESTION: #3. Can the w8x18 column in B1 S303 be done in phase 2
ANSWER: #3. Bid per current phasing plan.