Attachment 1 - Statement of Objectives - Long-Distance Telecommunications Services.pdf

PDF 258 KB Posted

Attached to
Local and Long Distance Telecommunication Services
Solicitation number
FA4626_LLDTS
Issued by

About this file

This is a Statement of Objectives (SOO) for Long-Distance and Local Telecommunications Services (LDLTS) at Malmstrom Air Force Base, Montana, issued by the 341st Communications Squadron. The incumbent contractor is Lumen Technologies Government Solutions, Inc. (CAGE: 5WBB3). The requirement is classified as Information Technology (IT) Services under DFARS 239.74.

The acquisition seeks robust, secure, and reliable telecommunications services supporting the 341st Missile Wing with 24/7/365 carrier-grade commercial voice connectivity and local exchange access. The primary objective mandates systematic modernization and migration from legacy Integrated Services Digital Network (ISDN) Primary Rate Interface (PRI) trunking to native Session Initiation Protocol (SIP) trunking, achieving zero downtime during transition. Key performance objectives include: (1) delivering 99.999% ("five-nines") availability with toll-quality voice transmission compliant with ITU standards; (2) executing phased PRI-to-SIP migration with redundant SIP trunks and dual-stack operational capability supporting all 5,980 assigned Direct Inward Dialing (DID) numbers across designated blocks; (3) establishing tier-based outage response with one-hour on-site response for High Priority outages affecting critical infrastructure; (4) completing cutover within thirty (30) calendar days from award without service interruption; (5) ensuring National Security and Emergency Preparedness (NS/EP) integration, including Government Emergency Telecommunications Service (GETS) support and Enhanced 911 (E911) routing; and (6) deploying certified, security-cleared personnel maintaining compliance with Air Force Occupational Safety and Health (AFOSH), OSHA, NFPA standards, Force Protection Condition (FPCON) directives, and Contractor Entry Authorization List (CEAL) vetting. The demarcation point is Building 1082 at Malmstrom AFB, Great Falls, Montana, with dedicated rack/floor space (approximately 16'7" x 29'), HVAC controls, commercial AC power, and emergency generator/UPS backup. All outside plant cabling must be routed entirely underground; aerial runs are prohibited. The contractor must furnish all customer premise equipment (CPE), optical line terminals, multiplexers, and cabling at no additional Government cost.

View the file

Other files

File Type Posted
Attachment 2 - Pricing Worksheet.xlsx XLSX spreadsheet
Solicitation - FA462627Q0004.pdf PDF
Attachment 3 - Past Performance Worksheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES (SOO)

Long-Distance and Local Telecommunications Services

(LDLTS)

Malmstrom Air Force Base (AFB), Montana

Document Identifier / Requirement: Long-Distance and Local Telecommunications Services

(LDLTS)

Requiring Activity: 341st Communications Squadron (341 CS), Malmstrom AFB, MT

Classification: Information Technology (IT) Services (DFARS 239.74)

Incumbent: Lumen Technologies Government Solutions, Inc. CAGE: 5WBB3

1. PURPOSE & MISSION OVERVIEW

The purpose of this acquisition is to obtain robust, secure, and reliable Long-Distance and Local

Telecommunications Services (LDLTS), modern IP transport, and migration capabilities in support of the 341st Missile Wing and mission partners stationed at Malmstrom Air Force Base

(AFB), Montana.

The primary mission objective is to ensure uninterrupted, carrier-grade commercial voice connectivity and local exchange access twenty-four (24) hours a day, seven (7) days a week, 365 days a year (24/7/365). Crucially, this acquisition requires the systematic modernization and planned migration from legacy Integrated Services Digital Network (ISDN) Primary Rate

Interface (PRI) trunking to high-capacity, native Session Initiation Protocol (SIP) trunking.

Offerors will utilize this Statement of Objectives (SOO) to develop and propose a comprehensive

Performance Work Statement (PWS), PRI-to-SIP Migration and Cutover Plan, and Mission

Essential Plan (MEP) aligned with Department of the Air Force (DAF) and Department of

Defense (DoD) telecommunications modernization policies.

2. BACKGROUND

Malmstrom AFB executes critical national defense and strategic deterrence missions requiring mission-ready, resilient telecommunications infrastructure. In alignment with DoD mandates directing military installations to sunset legacy Time-Division Multiplexing (TDM) architectures, local and long-distance commercial voice services must modernize toward carrier-grade, Internet Protocol (IP)-based switching and native SIP transport environments.

The current telecommunications baseline interfaces with a Government-owned Cisco Unified

Communications Manager (CUCM) core (Version 10.5 or updated enterprise release) located in

Building 1082 via legacy ISDN PRIs. Defense Switching Network (DSN) services are managed independently and remain outside the scope of this requirement. The Government requires an agile, performance-driven telecommunications partner capable of sustaining the legacy baseline while engineering and executing a seamless migration to native SIP trunking with zero downtime or mission impairment.

3. SCOPE

The scope of this requirement encompasses all management, personnel, engineering, physical and logical infrastructure, outside plant transmission media, interface electronics, Session Border

Controller (SBC) / Edge Boundary Controller (EBC) integration, and support services necessary to deliver and sustain end-to-end commercial local exchange and long-distance connectivity.

Key architectural elements within scope include:

• Providing resilient transport and termination at the designated Government demarcation point located in Building 1082, Malmstrom AFB.

• Managing and preserving the existing base-wide Direct Inward Dialing (DID) telephone number inventory (5,980 numbers across designated blocks).

• Maintaining legacy ISDN PRI trunking and commercial subscriber lines during the initial operational baseline period.

• Designing, provisioning, testing, and cutting over from legacy ISDN PRIs to redundant, dual-homed native SIP trunking terminating directly into base Unified Communications

(UC) interfaces.

• Providing end-to-end commercial long-distance transport and standard operator assistance capabilities.

• Integrating critical emergency systems, including Government Emergency

Telecommunications Service (GETS) and base Enhanced 911 (E911) routing.

4. PROGRAM OBJECTIVES & DESIRED OUTCOMES

The Contractor shall propose an integrated technical and management solution that satisfies the following performance objectives:

4.1. Objective 1: High-Availability, Resilient Dial-Tone & Transmission

• Outcome: Deliver continuous, carrier-grade telecommunications services achieving a minimum operational reliability threshold of 99.999% ("five-nines") availability across all trunk groups and lines.

• Standards:

o Provide toll-quality voice transmission compliant with International

Telecommunication Union (ITU) standards for latency, packet jitter, and packet loss across all packetized voice/IP backbones.

o Implement robust Grade of Service (GoS) and Quality of Service (QoS) frameworks, including Committed Access Rates (CAR) and Expedited

Forwarding (EF) mapped to Differentiated Services Code Point (DSCP) packet tagging.

o Ensure full compatibility and interoperability with the Government’s CUCM switching infrastructure and distribution frames at no additional modernization cost to the Government.

4.2. Objective 2: PRI-to-SIP Trunking Modernization & Migration

• Outcome: Execute a phased, risk-mitigated technical migration from legacy ISDN PRI circuits to secure, high-capacity, native SIP trunks without degrading call quality or interrupting daily military operations.

• Standards:

o Engineer, install, and test redundant SIP trunks provisioned over dedicated, carrier-managed IP transport (or MPLS) terminating into the Government's

CUCM / SBC environment.

o Engineer concurrent call path capacity sufficient to support base peak-hour traffic volumes across all 5,980 active DID allocations.

o Establish dual-stack operational capability during migration, ensuring existing

PRI channels remain active until SIP performance, security, and call routing have been validated and accepted by the Government POC.

o Deliver high-performance SIP metrics: Call Setup Success Rate (CSSR) and

Dropped Call Rate (DCR) .

o Support required voice codecs (including G.711u and G.729a) and RFC-compliant dual-tone multi-frequency (DTMF) relay mechanisms (RFC 2833 /

RFC 4733).

4.3. Objective 3: Incident Response, Outage Mitigation, and Rapid Restoration

• Outcome: Minimize operational disruptions and restore mission-critical voice pathways rapidly in the event of unscheduled outages or network degradation.

• Standards:

o Establish a tier-based outage classification structure (High, Medium, Low

Priority) linked to clear response thresholds and CSSR/DCR metrics.

o Maintain on-site response capabilities within one (1) hour for High Priority outages affecting critical trunking, optical carriers, or core unified communications.

o Adhere strictly to Telecommunications Service Priority (TSP) and Restoration

Priority List (RPL) directives, actively supporting Base Continuity of Operations

(COOP).

o Ensure transparent, proactive notification procedures: provide 30-day advance notice for scheduled maintenance windows and immediate telephonic and written coordination with the 24/7 Malmstrom Communications Focal Point (CFP).

4.4. Objective 4: Seamless Migration, Cutover, and Zero-Mission-Disruption

Transition

• Outcome: Achieve an efficient, risk-mitigated technical cutover within thirty (30) calendar days from award/notice to proceed without service interruption to ongoing military operations.

• Standards:

o Maintain concurrent operation of existing trunks until formal Government acceptance of the cutover is verified.

o Execute 100% verification and porting of all 5,980 assigned DID numbers without loss of inbound or outbound service.

o Note: For an incumbent provider, redundant physical installation procedures may be streamlined, whereas a non-incumbent must execute a fully coordinated transition plan.

4.5. Objective 5: National Security and Emergency Preparedness (NS/EP)

Integration

• Outcome: Guarantee immediate, uninterrupted access for national emergency signaling and base emergency responders across both legacy PRI and modernized SIP infrastructures.

• Standards:

o Ensure full switch translation and prioritized call handling for Government

Emergency Telecommunications Service (GETS) over Numbering Plan Area

(NPA) code 710 () without end-user surcharges.

o Block unauthorized dial-around carrier prefixes (e.g., ) across all provisioned circuits.

o Maintain comprehensive E911 interconnectivity ensuring military extension 911 calls route directly to the Base Defense Operations Center (BDOC) / Fire

Dispatch, while non-military administrative extensions coordinate seamlessly with regional Public Safety Answering Points (PSAP).

4.6. Objective 6: Professional Workforce, Safety, and Installation Security

Compliance

• Outcome: Execute all services using certified, security-cleared personnel operating in strict compliance with military installation and safety mandates.

• Standards:

o Staff technical roles with certified personnel holding active Original Equipment

Manufacturer (OEM) certifications for installed hardware.

o Maintain compliance with Air Force Occupational Safety and Health (AFOSH), OSHA, and NFPA standards.

o Satisfy base physical security, Force Protection Condition (FPCON) directives, Contractor Entry Authorization List (CEAL) vetting, DBIDS badging, and annual

DoD Level I Anti-Terrorism (AT) training.

o Strictly adhere to facility photography restrictions pursuant to 18 U.S.C. § 795.

5. OUTAGES

5.1.1. Scheduled Outage

The Contractor shall notify the Government POC in writing of any scheduled maintenance or outage that will affect any TS.

1. Notification must be submitted via email no later than (NLT) thirty (30) calendar days prior to the proposed outage window.

2. The notification package must include a comprehensive justification, estimated downtime duration, specific system impacts, and list of affected subscriber lines and facilities.

3. Outage windows must be scheduled during non-peak operational windows to minimize mission disruption.

4. The Government POC retains sole approval authority and must formally release affected equipment and circuits prior to any service disruption.

5. Outage notifications and follow-up reporting must comply with paragraph 2.1.3.

5.1.2. Unscheduled Outages

When an unscheduled failure impacts multiple facilities, operational areas, primary trunk groups, or backbone cables/fibers, the Malmstrom Communications Focal Point (CFP) and Government

POC will assign an outage category and establish restoration priority.

6. The Contractor shall immediately notify the CFP and Government POC telephonically upon discovery.

7. The Contractor shall provide follow-up documentation via email within the timeframes established for the respective outage severity classification.

5.1.3. Outage Procedures

In all outage situations, written notifications from the Contractor shall include, at a minimum:

• Root cause or suspected reason for service interruption

• Total expected or actual duration

• Precise start and stop timestamps

• Itemized inventory of affected equipment, trunk lines, individual circuits, and facilities

• Description of restoration actions taken, including root-cause mitigation and service verification testing

5.1.4. Outage Priority, Restoration of Service, and Maintenance

The Contractor shall respond to and restore all service outages in coordination with the

Government POC within the operational thresholds detailed below.

• For mission-essential operations, restoration actions must adhere strictly to the

Telecommunications Service Priority (TSP) and Restoration Priority List (RPL) provided by the Government POC.

• If the Contractor encounters conditions beyond its reasonable control that prevent compliance with TSP/RPL guidelines during contingency or crisis situations, the Contractor shall immediately notify the Government POC and commit all available resources to assist the Government in maintaining Continuity of Operations (COOP).

• The Government POC reserves the authority to elevate or modify restoration priority levels

(High, Medium, or Low) based upon real-time operational mission impact.

5.1.4.1. High Priority Outage

• Response Requirement: The Contractor shall arrive on-site NLT one (1) hour after receipt of notification from the Malmstrom CFP or Government POC. The Contractor shall immediately brief the Government on restoration workflows and provide mandatory situational updates NLT every four (4) hours until full service restoration is verified.

• Criteria: A High Priority Outage involves extensive disruption, major plant failure, or physical destruction of critical infrastructure resulting from natural or human causes, defined by any of the following operational conditions:

• Total failure of Session Initiation Protocol (SIP) trunking capabilities servicing the

Government facility, regardless of fault origin.

• Degradation of SIP trunking where Call Setup Success Rate (CSSR) degrades below 25% of engineered system capacity.

• Degradation of SIP trunking where Dropped Call Rate (DCR) exceeds 50% of active call volume.

• Failure or loss exceeding 75% of total call-handling capacity across any legacy analog communications system.

• Catastrophic loss or severe degradation of primary transmission infrastructure, including

Core Unified Communications Servers, Database/Storage Area Networks (SAN), optical carrier trunks, or Multiprotocol Label Switching (MPLS) backbones.

5.1.4.2. Medium Priority Outage

• Response Requirement: The Contractor shall respond on-site NLT twenty-four (24) hours following notification by the Government POC.

• Criteria: A Medium Priority Outage involves substantial operational degradation, defined by any of the following conditions:

• Degradation of SIP trunking where CSSR falls below 75% (but remains at or above 25%) of engineered system capacity.

• Degradation of SIP trunking where DCR is greater than 5% but less than or equal to 50% of active call volume.

• Outage or loss affecting between 25% and 75% of total call-handling capacity on legacy analog systems.

• Loss of primary trunk redundancy where secondary failover paths remain partially operational.

5.1.4.3. Low Priority Outage

• Response Requirement: The Contractor shall respond on-site NLT five (5) business days following notification by the Government POC (unless otherwise authorized by the

Government).

• Criteria: A Low Priority Outage involves minor, non-critical service impairment, defined by any of the following conditions:

• Degradation of SIP trunking where CSSR falls below 90% (but remains at or above 75%) of engineered capacity.

• Degradation of SIP trunking where DCR is between 1% and 5% of active call volume.

• Outage affecting less than 25% (and greater than 1%) of total call-handling capacity on legacy analog distribution systems.

• Administrative or isolated circuit impairments that do not interrupt base-wide voice services.

5.2. Services Summary

5.2.1. Performance Objectives and Thresholds

The Performance Requirements Summary (PRS) outlines performance objectives and acceptable quality levels (AQL) monitored by the Government:

Performance

Element Number

Performance

Objective

PWS Paragraph

Reference

Performance

Threshold (AQL)

SS-1 Provide continuous local and long-distance access at designated demarcation points

Section 2 / Appendix

Continuous 24/7/365 availability with

99.999% system reliability.

SS-2 Deliver timely and comprehensive advance notifications for scheduled maintenance/outages

Paragraph 4.1.1 Timely and accurate written notification provided NLT 30 calendar days in advance, 95% of the time.

SS-3 Respond on-site and restore High Priority

Paragraph 4.1.4.1 On-site response within 1 hour; 4-hour service outages IAW

TSP, RPL, and mission directives status updates; 99% compliance threshold.

SS-4 Respond on-site and restore Medium

Priority service outages IAW established restoration timelines

Paragraph 4.1.4.2 On-site response within 24 hours; 95% compliance threshold.

SS-5 Respond on-site and restore Low Priority service outages within contracted parameters

Paragraph 4.1.4.3 On-site response within 5 business days; 95% compliance threshold.

6. OPERATING CONSTRAINTS & SITE-SPECIFIC

PARAMETERS

Offerors shall design their technical solutions within the boundaries of the following constraints:

1. Demarcation Point & Facility Space:

The primary physical point of presence (demarcation) is located in Building 1082 (228

75th Street North, Malmstrom AFB, MT). The Government allocates dedicated rack/floor space inside Building 1082 (approx. 16'7" x 29'), complete with HVAC environmental controls, commercial AC, and emergency generator/UPS backed power.

2. Outside Plant Infrastructure:

Aerial cable runs on Malmstrom AFB are strictly prohibited. All outside plant cabling, entrance fiber, and transmission lines must be routed entirely underground.

3. Current Demarcation Circuit Baseline:

o Assigned DID Ranges (5,980 Total Numbers):

▪ (406) 731-1000 through 1979 (980 numbers)

▪ (406) 731-2000 through 4999 (3,000 numbers)

▪ (406) 731-6000 through 7999 (2,000 numbers) o Commercial Subscriber Lines (CSL):

▪ Line: (406) 452-0679 (Analog, Flat Rate, Non-Published, 341 CS) o Legacy ISDN Primary Rate Interface (PRI) Trunks (To Be Modernized to

SIP):

▪ PRI #1: 23 B-Channels (2-Way) + 1 D-Channel (Signaling Q.931)

▪ PRI #2: 24 B-Channels (2-Way)

▪ PRI #3: 23 B-Channels (2-Way) + 1 D-Channel (Signaling Q.931)

▪ PRI #4: 24 B-Channels (2-Way) (Total: 94 B-Channels carrying base voice and signaling)

4. Target Modernized Architecture (SIP Trunking):

o Carrier-grade SIP trunking terminating onto Government-designated Edge

Boundary Controllers (EBC) / Session Border Controllers (SBC) interfacing with

CUCM.

o Concurrent session capacity sized to handle base busy-hour traffic across all 5,980

DIDs, engineered with failover survivability.

5. Regulatory and Statutory Compliance:

Services must comply with all applicable Federal Communications Commission (FCC) rules, Montana Public Service Commission (PSC) / Public Utility Commission (PUC) tariffs, DFARS 239.74, and AFI 63-138.

6. Exclusions:

Commercial or residential telephone services for non-Government entities, private concessionaires, third-party contractors, and Defense Switching Network (DSN) transport are excluded from this requirement.

7. GOVERNMENT-FURNISHED PROPERTY,

EQUIPMENT, AND SERVICES (GFP/GFE/GFS)

The Government will provide the following at the demarcation node (Building 1082):

• Floor and rack mounting footprint for Contractor-owned transmission equipment (to be coordinated with the Government POC).

• Commercial AC power outlets and emergency generator/UPS conditioned backup electrical feeds.

• Standard HVAC environmental controls maintaining ambient operating room conditions.

• Structural fire protection systems.

• Base switching interface points (punch blocks, digital patch bays, or Ethernet handoffs to base SBCs).

Note: The Contractor shall furnish and maintain all customer premise equipment (CPE), optical line terminals, session boundary appliances (if carrier-side), multiplexers, and cabling required to interface with the Government demarcation points at no additional cost.

8. PERIOD AND PLACE OF PERFORMANCE

• Place of Performance: Building 1082, Malmstrom AFB, Great Falls, Montana, 59402.

• Operating Hours: Demarcation equipment and services must operate continuously

(24/7/365). Routine administrative coordination will occur during normal base duty hours, with immediate on-call response for emergency and high-priority outages.

• Cutover / Migration Period: Thirty (30) calendar days from formal award / notice to proceed for initial service cutover, with a coordinated schedule for complete PRI-to-SIP trunk cutover and decommissioning.

STATEMENT OF OBJECTIVES (SOO)
Long-Distance and Local Telecommunications Services (LDLTS)
Malmstrom Air Force Base (AFB), Montana
1. PURPOSE & MISSION OVERVIEW
2. BACKGROUND
3. SCOPE
4. PROGRAM OBJECTIVES & DESIRED OUTCOMES
4.1. Objective 1: High-Availability, Resilient Dial-Tone & Transmission
4.2. Objective 2: PRI-to-SIP Trunking Modernization & Migration
4.3. Objective 3: Incident Response, Outage Mitigation, and Rapid Restoration
4.4. Objective 4: Seamless Migration, Cutover, and Zero-Mission-Disruption Transition
4.5. Objective 5: National Security and Emergency Preparedness (NS/EP) Integration
4.6. Objective 6: Professional Workforce, Safety, and Installation Security Compliance
5. OUTAGES
5.1.1. Scheduled Outage
5.1.2. Unscheduled Outages
5.1.3. Outage Procedures
5.1.4. Outage Priority, Restoration of Service, and Maintenance
5.1.4.1. High Priority Outage
5.1.4.2. Medium Priority Outage
5.1.4.3. Low Priority Outage
5.2. Services Summary

5.2.1. Performance Objectives and Thresholds

6. OPERATING CONSTRAINTS & SITE-SPECIFIC PARAMETERS
7. GOVERNMENT-FURNISHED PROPERTY, EQUIPMENT, AND SERVICES (GFP/GFE/GFS)
8. PERIOD AND PLACE OF PERFORMANCE