This Statement of Work (SOW) details the replacement and repair of weapons racks at the Security Forces Armory, Malmstrom Air Force Base, Montana. The project requires the contractor to provide and install twenty total Spacesaver Universal Weapons Racks (sixteen 42" x 16 1/8" x 45" high and four 42" x 16 1/8" x 61" high), with specific requirements including cutting 1/2" diameter holes in rack tops for fire sprinkler water flow. Additionally, the contractor must inspect and replace broken 3-Spoke Handles on existing racks, transferring existing rack accessories to new racks. The project is to be completed within 154 calendar days (22 weeks) from the contract award date, with the work to be performed in the basement of building 500, room 41B, at Malmstrom AFB. The government will provide temporary storage for weapons and components during the rack replacement, and the contractor must comply with all base security regulations.

View the file

Other files for this federal contract opportunity

Other files attached to 341 SFG Armory Rack Repair, newest first.
File Type Posted
Solicitation Amendment FA462625Q00370001 SF 30.pdf PDF
Armory Rack Repair SOW_13May2025.pdf PDF
Solicitation - FA462625Q0037.pdf PDF
Attch 2. Installation Perimeter Access Control AR.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Armory Rack Replacement and Repair at Malmstrom AFB, MT

13 May 2025

1. Introduction

This Statement of Work (SOW) outlines the requirements for the replacement and repair of weapons racks at the Security Forces Armory, Malmstrom Air Force Base, Montana. The contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the project as described herein.

2. Scope of Work

The Contractor shall:

The Contractor shall verify all measurements and specifications during the site visit referenced in this SOW. Any discrepancies or unforeseen requirements identified during the site visit that materially affect the cost or schedule of the project must be communicated to the Contracting Officer immediately.

• 2.1 Rack Replacement:

o Provide and install sixteen (16) new Spacesaver Universal Weapons Racks (UWRs) with dimensions 42" wide x 16 1/8" deep x 45" high, and four (4) new Spacesaver UWRs with dimensions 42" wide x 16 1/8" deep x 61" high. Racks shall be delivered empty. Manufacturer part numbers for the racks shall be provided in the contractor's proposal.

o All new Universal Weapons Racks shall have ½" diameter round holes cut into the top of each rack to allow for the flow of water from fire sprinklers, consistent with existing armory rack configurations and previous Malmstrom AFB Fire Department approvals.

o Cut welds on existing racks, disassemble them, and dispose of the old material in government provided trash cans. Armory personnel will handle disposal means.

None of the material being removed needs any kind of special disposal method.

o Transfer existing Weapons Rack Accessories from the old racks to the new racks.

• 2.2 Rack Repair:

o Inspect all 21 existing 3-Spoke Handles on all armory racks and replace the broken handle on one of the weapon racks.

o Repair or replace any defective 3-Spoke Handles as needed. Replacement handles shall be of equivalent quality and functionality to the original handles.

3. Project Schedule

• The project shall be completed in 154 calendar days (22 weeks) from the date of contract award.

• The contractor shall provide a project schedule with their proposal.

• Extended working hours may be required and shall be coordinated with the Mission Partner Representative.

4. Place of Performance

341 SFG Armory, Malmstrom Air Force Base, Montana. The armory is located in the basement of building 500, room number is 41B.

5. Government Provided Temporary Government Storage

• The government will provide a designated area for the temporary storage of weapons and components during the rack replacement.

6. Security Requirements

The Contractor shall comply with all applicable security regulations for Malmstrom AFB. Details regarding base access procedures will be provided upon contract award.

7. Deliverables

• Fully installed and functional weapons racks.

• All replaced 3-Spoke Handles.

• A final report documenting the work performed, including a list of all repaired/replaced components.