Attch 1. SOW flooring bldg 407 Horizontal Shop.pdf

PDF 163 KB Posted

Attached to
Horizontal Shop Flooring Federal contract opportunity
Solicitation number
FA4626-24-Q-0005
Issued by
Department of the Air Force Global Strike Command

About this file

This statement of work outlines requirements for a flooring installation project at Malmstrom Air Force Base. The contractor will remove existing flooring and install approximately 2521 square feet of hard surface flooring and 481 linear feet of cove base in building 407. The flooring must be Shaw LVT Style Solitude 0648V in color 48760 Woodland or equal. Installation must follow manufacturer recommendations and industry standards using the direct glue down method. The performance period is 120 calendar days from contract award. Work hours are weekdays from 7 AM to 4:30 PM. The contractor must coordinate activities with the facility manager and follow all force protection and safety requirements. Upon completion, the contractor will clean the job site and dispose of waste off base.

View the file

Other files for this federal contract opportunity

Other files attached to Horizontal Shop Flooring, newest first.
File Type Posted
23-089-076_Bldg 407_ Asbestos Inspection.pdf PDF
Flooring Q and A 12-11-23.pdf PDF
COMBO_ Horizontal Shop Flooring.pdf PDF
Attch 2. Installation Perimeter Access Control.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

INSTALL FLOORING

IN BUILDING 407 HORIZONTAL SHOP

MALMSTROM AFB, MT

1. GENERAL

1.1. Summary of work: The contractor shall provide all labor, equipment, tools, accessories, and materials to properly remove existing flooring and install approximately 2521 square feet of hard surface flooring (plank flooring) to include approximately 481 linear feet of 4” rubber cove base using the direct glue down method of installation in building 407 on Malmstrom AFB, MT.

1.2. Anti-Terrorism Awareness Training: In accordance with DoDI O-2000.16v1_AFI

10-245-O, Antiterrorism (AT) Program Implementation, ensure Level I - AT

Awareness Training is completed by all contractors within 30 days of requiring access, and annually thereafter. The training will be provided by the government.

The objective of the training is to provide personnel with requisite knowledge necessary to remain vigilant and enable employment of AT tactics, techniques, and procedures.

1.3. Force Protection: Contractor personnel are required to abide by all real-world Force

Protection Condition (FPCON) measures, random anti-terrorism measures (RAMs), shelter-in-place orders, evacuations and lock-down notices as directed. Examples include mandatory badge or ID checks, facility single points-of-entry and searches of hand carried items.

2. MATERIALS

2.1.

The hard surface flooring shall be Shaw LVT Style Solitude 0648V, color 48760

Woodland (or equal). Cove base shall be 4” rubber of a complementary color (color must be approved by Facility Manager prior to purchase).

3. EXECUTION

3.1. The performance period will be 120 calendar days after delivery of contract.

Working hours will be from 7:00 AM to 4:30 PM, Monday through Friday.

3.2. The contractor shall coordinate all his activities with Facility Manager, this facility will be in use during installation.

3.3. The contractor shall install the flooring as recommended by the manufacturer, using the direct glue down method. The contractor shall provide all materials required to clean, patch, level, and prepare substrate for the new flooring. Flooring shall be installed in accordance with attached floor plan. The contractor’s performance must meet or exceed

The Carpet and Rug Institute’s Standard for Installation of Commercial Carpet, CRI 104-

2002. Installation must be performed in strict compliance with all local, state and federal regulations. The Occupational Safety and Health administration Hazard Communication

Standard must be followed.

3.4. The government will inspect and accept the areas as the contractor completes them.

If any areas are found to be unacceptable when inspected by the government, the contractor shall re-perform until the newly installed area meets standard commercial practices.

3.5. Cove Base, Edge Guards and Transition Strips. The contractor shall provide and install aluminum bend-down type edge guard and rubber /vinyl transition strips for direct glue down flooring where required.

4. CLEAN UP

4.1. Clean-up of the job site shall be the responsibility of the installation contractor. The contractor will perform a clean-up (sweep or vacuum) of all replaced surfaces when completed.

4.2 Waste generated by the Contractor in performance of the services specified with this

SOW shall be disposed of by contractor off base in compliance with State and Local ordinances.

Attachment 1-Floor plans

Attachment 2- VCT tile cut sheet.

ATTACHMENT 1

Attachment 2