Atch 1. SOW B500 Basement_29Aug23.pdf

PDF 263 KB Posted

Attached to
Hard Surface Flooring Federal contract opportunity
Solicitation number
FA4626-23-Q-0055
Issued by
Department of the Air Force Global Strike Command

About this file

This statement of work outlines requirements for installing hard surface flooring at Building 500 on Malmstrom Air Force Base. The contractor shall remove existing flooring and install approximately 7,986 square feet of Shaw LVT Style Solitude plank flooring in color 48760 Woodland, as well as 1,784 linear feet of 4-inch rubber cove base in a complementary color. The performance period is 30 calendar days after materials arrive on site, with work taking place Monday through Friday from 7:00 AM to 4:30 PM. In addition to installing the flooring per manufacturer's specifications and industry standards, the contractor must coordinate activities with the facility manager, abide by all force protection measures, and properly dispose of waste off base. The government will inspect completed areas for acceptance.

View the file

Other files for this federal contract opportunity

Other files attached to Hard Surface Flooring, newest first.
File Type Posted
Wage Determination 15-5391 Rev 19.pdf PDF
B500 COMBO_FA4626-23-Q-0055.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

29 August 2023

INSTALL FLOORING

IN BUILDING 500 Basement

MALMSTROM AFB, MT

1. GENERAL

1.1. Summary of work: The contractor shall provide all labor, equipment, tools, accessories, and materials to properly remove existing flooring and install approximately 7,986 square feet of hard surface flooring (plank flooring) to include approximately 1784 linear feet of 4” rubber cove base using the direct glue down method of installation in building 500 on Malmstrom AFB, MT.

1.2. Anti-Terrorism Awareness Training: In accordance with DoDI O-2000.16v1_AFI 10-245-O, Antiterrorism (AT) Program Implementation, ensure Level I - AT Awareness Training is completed by all contractors within 30 days of requiring access, and annually thereafter. The training will be provided by the government.

The objective of the training is to provide personnel with requisite knowledge necessary to remain vigilant and enable employment of AT tactics, techniques, and procedures.

1.3. Force Protection: Contractor personnel are required to abide by all real-world Force

Protection Condition (FPCON) measures, random anti-terrorism measures (RAMs), shelter-in-place orders, evacuations and lock-down notices as directed. Examples include mandatory badge or ID checks, facility single points-of-entry and searches of hand carried items.

2. MATERIALS

2.1.

The hard surface flooring shall be Shaw LVT Style Solitude 0648V, color 48760 Woodland (or equal). Cove base shall be 4” rubber of a complementary color (color must be approved by Facility Manager prior to purchase).

3. EXECUTION

3.1. The performance period will be 30 calendar days after flooring is received on site.

Working hours will be from 7:00 AM to 4:30 PM, Monday through Friday.

3.2. The contractor shall coordinate all his activities with Facility Manager, this facility will be in use during installation.

3.3. The contractor shall install the flooring as recommended by the manufacturer, using the direct glue down method. The contractor shall provide all materials required to clean, patch, level, and prepare substrate for the new flooring. Flooring shall be installed in accordance with attached floor plan. The contractor’s performance must meet or exceed The Carpet and Rug Institute’s Standard for Installation of Commercial Carpet, CRI 104- 2002. Installation must be performed in strict compliance with all local, state, and federal regulations. The Occupational Safety and Health administration Hazard Communication Standard must be followed.

3.4. The government will inspect and accept the areas as the contractor completes them.

If any areas are found to be unacceptable when inspected by the government, the contractor shall re-perform until the newly installed area meets standard commercial practices.

3.5. Cove Base, Edge Guards and Transition Strips. The contractor shall provide and install aluminum bend-down type edge guard and rubber /vinyl transition strips for direct glue down flooring where required.

4. CLEAN UP

4.1. Clean-up of the job site shall be the responsibility of the installation contractor. The contractor will perform a clean-up (sweep or vacuum) of all replaced surfaces when completed.

4.2 Waste generated by the Contractor in performance of the services specified with this SOW shall be disposed of by contractor off base in compliance with State and Local ordinances.

Attachment 1-Floor plans Attachment 2- VCT tile cut sheet.

ATTACHMENT 1

Attachment 2

INSTALL FLOORING
MALMSTROM AFB, MT