| File | Type | Posted |
|---|---|---|
| Attach_1_Specifications.zip | ZIP file | |
| Attch_9_-_Subcontractor_Consent_Form_-_10R0027.doc | DOC document | |
| Attach_3_Schedule_of_Drawings.doc | DOC document | |
| Solicitation.doc | DOC document | |
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_6_Base_Entry.pdf | ||
| Attach_5_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| 10-1043C | Replace HTHW Service Lines | FA4626-16-R-0012 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| DIVISION 1 - GENERAL REQUIREMENTS | |||||||||||||||||||||
| 1 | 01000.3.5.B As-Built Drawings | 4 | * | *3d PTFI | |||||||||||||||||
| 2 | 01000.3.5.B Corrected As-Built Drawings | 4 | * | *10d after received back from CE, if needed | |||||||||||||||||
| 3 | 01000.3.5.D Final As-Built submittal | 4 | * | *30d PTFP | |||||||||||||||||
| 4 | 01000.3.5.F List of Equipment-In-Place | 4 | * | *PTFI | |||||||||||||||||
| 5 | 01000.3.7.A Four (4) Complete Sets Operations & Maintenance | 4 | * | *PTFI | |||||||||||||||||
| 6 | 01000.3.8.A.1 Itemized Equipment List | 4 | * | *10d PTFI | |||||||||||||||||
| 7 | 01000.3.8.A.2 Guarantees for Equipment items list | 4 | * | *10d PTFI | |||||||||||||||||
| 8 | 01000 3.18.4 Quality Control Report - Daily | 4 | * | *EWD | |||||||||||||||||
| 9 | 01000 3.18.5 Quality Control Plan | 4 | * | *PTSW | |||||||||||||||||
| 10 | 01000.3.19.A Property Inventory Checklist | 4 | * | *10d PTFI | |||||||||||||||||
| 11 | List of Employees 01001. 1.1.A. | 1 | |||||||||||||||||||
| 12 | Entry Authorization List 01001. 3.1.C.5. | 1 | |||||||||||||||||||
| 13 | Environmental Protection & Waste Management Plan 01360, 11.6. & 1360-A, Attachment 1 | 1 | * | *10d PTFA | |||||||||||||||||
| 14 | Recovered Materials Written Determination Form 1360-B, Attachment 2 | 1 | * | *10d PTFA | |||||||||||||||||
| 15 | Recycled Material Use Report 01360, 12.3 & From 1360-C, Attachment 3 | 1 | * | *10d PTFA | |||||||||||||||||
| 16 | Selective Demolition Qualifications Data 01732, 1.5 | 4 | 4 | ||||||||||||||||||
| 17 | Trench Excavation Backfill Soil & Bedding Samples and Test Data 02221 1.3.A & B | 1 | 4 | * | *3d AWC | ||||||||||||||||
| 18 | Contaminated Work Area Plan 02222, 3.2.A. | 4 | * | *21d PTSW | |||||||||||||||||
| 19 | Contaminated Areas Project Report, 02222, 3.3 | 4 | * | *15d PTFI | |||||||||||||||||
| 20 | SSHP , 02222, 5.3.B | 4 | * | *21d PTSW | |||||||||||||||||
| 21 | Logs, Reports & Record Keeping 02222, 5.3.C. | 4 | * | *AWC | |||||||||||||||||
| 22 | Notification for Excavation in Roads & Parking Lots 02300 1.1A.3.c. | 1 | * | *10d PTSW | |||||||||||||||||
| 23 | Backfill Compaction Test Results 02300 3.1.A. | 4 | * | *3d AWC | |||||||||||||||||
| 24 | Submittals 02511, 1.3 Hot-Mix Asphalt | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||||
| 25 | Quality Assurance 02511, 1.4 Qualifications | 4 | * | *15d ANTP | |||||||||||||||||
| 26 | Submittals 02570, 1.2.A Pre-Cast Manholes | 4 | 4 | * | *15d ANTP | ||||||||||||||||
| 27 | Submittals 02570, 1.2.B Test Reports | 4 | 4 | 4 | *3d AWC | ||||||||||||||||
| 28 | Field Quality Control 02511 3.11 Test Reports | 4 | 4 | 4 | *3d AWC | ||||||||||||||||
| 29 | Submittal 02800, 1.2.A. Lab analysis | 4 | * | *15d ANTP | |||||||||||||||||
| 30 | Dryland Grass Seed Product Data, 02912, 1.4.A. | 4 | 4 | 4 | 4 | * | *15d PTSW | ||||||||||||||
| 31 | Submittals 03300, 1.4.A. Notification of Placement | 1 | * | *18 hours SN | |||||||||||||||||
| 32 | Submittals 03300, 1.4.B. Product Data & Instructions | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||||
| 33 | Submittals 03300, 1.4.C. Product Samples | 1 | * | *3d AWC | |||||||||||||||||
| 34 | Submittals 03300, 1.4.D. Mix Design | 4 | * | *21d PTSW | |||||||||||||||||
| 35 | Submittals 03300, 1.4.E. Test Results | 4 | * | *36 hours AWC | |||||||||||||||||
| 36 | Submittals 15027, 1.3.C.1 Shop Drawings | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||||
| 37 | Submittals 15027, 1.3.C.2 Test Reports | 4 | *AWC | ||||||||||||||||||
| 38 | Submittals 15090, 1.4 B Equipment Submittals | 4 | 4 | 4 | 4 | *15d ANTP | |||||||||||||||
| 39 | Submittals 15090, 1.4 C Seismic Drawings | 4 | 4 | 4 | 4 | *15d ANTP | |||||||||||||||
| 40 | Submittals 15100, 1.3 Shop Drawings | 4 | 4 | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||
| 41 | Submittals 15250, 1.2.B. Shop Drawings | 4 | * | *15d ANTP | |||||||||||||||||
| 42 | Submittals 15702, 1.4.B Shop Drawings | 4 | 4 | * | *15d ANTP | ||||||||||||||||
| 43 | Submittals 15702, 1.4.C Welder Certifications | 4 | * | *PTSW | |||||||||||||||||
| 44 | Submittals 15702, 1.4.D Test Results | 4 | * | *AWC | |||||||||||||||||
| 45 | Submittals 15702, 3.6.B Cleaning Procedures | 4 | * | *14d PTSW | |||||||||||||||||
| Schedule of Abbreviations: | |||||||||||||||||||||
| AWC | |||||||||||||||||||||
| PTSW | |||||||||||||||||||||
| AFA | = After Work Completed | BMF | = | Before Material Delivery | |||||||||||||||||
| PTO | = Prior to Starting Work | SN | = | Advance Notification | |||||||||||||||||
| PTNT | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| ANTP | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| EWD | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| PTFA | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| ACA | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| = Prior to Final Acceptance | PT | = | Prior To | ||||||||||||||||||
| = After Contract Award | PSS | = | Per Submittal Schedule |
&L&"Times New Roman,Regular"&12Attachment 2&C&"Times New Roman,Regular"&12HTHW SERVICE LINES IDIQ&R&"Times New Roman,Regular"&12FA4626-xx-R-xxxx &L&"Times New Roman,Regular"&12AF Form 66 02:
&F-&D&C&"Times New Roman,Regular"&12 SS-&P
REQUIRED TECHNICAL SUBMITTALS
File details come from the government source that posted it. Updated .