Attach_2_Material_Submittal.xls

XLS spreadsheet 41 KB Posted

Attached to
Replace High Temperature Hot Water Service Lines, Phase 16 Federal contract opportunity
Solicitation number
FA4626-16-R-0012
Issued by
Department of the Air Force Global Strike Command

About this file

Attach 2 Material Submittal

View the file

Other files for this federal contract opportunity

Other files attached to Replace High Temperature Hot Water Service Lines, Phase 16, newest first.
File Type Posted
Attach_1_Specifications.zip ZIP file
Attch_9_-_Subcontractor_Consent_Form_-_10R0027.doc DOC document
Attach_3_Schedule_of_Drawings.doc DOC document
Solicitation.doc DOC document
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attach_4_Drawings.zip ZIP file
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_6_Base_Entry.pdf PDF
Attach_5_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
10-1043CReplace HTHW Service LinesFA4626-16-R-0012
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 1 - GENERAL REQUIREMENTS
101000.3.5.B As-Built Drawings4**3d PTFI
201000.3.5.B Corrected As-Built Drawings4**10d after received back from CE, if needed
301000.3.5.D Final As-Built submittal4**30d PTFP
401000.3.5.F List of Equipment-In-Place4**PTFI
501000.3.7.A Four (4) Complete Sets Operations & Maintenance4**PTFI
601000.3.8.A.1 Itemized Equipment List4**10d PTFI
701000.3.8.A.2 Guarantees for Equipment items list4**10d PTFI
801000 3.18.4 Quality Control Report - Daily4**EWD
901000 3.18.5 Quality Control Plan4**PTSW
1001000.3.19.A Property Inventory Checklist4**10d PTFI
11List of Employees 01001. 1.1.A.1
12Entry Authorization List 01001. 3.1.C.5.1
13Environmental Protection & Waste Management Plan 01360, 11.6. & 1360-A, Attachment 11**10d PTFA
14Recovered Materials Written Determination Form 1360-B, Attachment 21**10d PTFA
15Recycled Material Use Report 01360, 12.3 & From 1360-C, Attachment 31**10d PTFA
16Selective Demolition Qualifications Data 01732, 1.544
17Trench Excavation Backfill Soil & Bedding Samples and Test Data 02221 1.3.A & B14**3d AWC
18Contaminated Work Area Plan 02222, 3.2.A.4**21d PTSW
19Contaminated Areas Project Report, 02222, 3.34**15d PTFI
20SSHP , 02222, 5.3.B4**21d PTSW
21Logs, Reports & Record Keeping 02222, 5.3.C.4**AWC
22Notification for Excavation in Roads & Parking Lots 02300 1.1A.3.c.1**10d PTSW
23Backfill Compaction Test Results 02300 3.1.A.4**3d AWC
24Submittals 02511, 1.3 Hot-Mix Asphalt444**15d ANTP
25Quality Assurance 02511, 1.4 Qualifications4**15d ANTP
26Submittals 02570, 1.2.A Pre-Cast Manholes44**15d ANTP
27Submittals 02570, 1.2.B Test Reports444*3d AWC
28Field Quality Control 02511 3.11 Test Reports444*3d AWC
29Submittal 02800, 1.2.A. Lab analysis4**15d ANTP
30Dryland Grass Seed Product Data, 02912, 1.4.A.4444**15d PTSW
31Submittals 03300, 1.4.A. Notification of Placement1**18 hours SN
32Submittals 03300, 1.4.B. Product Data & Instructions444**15d ANTP
33Submittals 03300, 1.4.C. Product Samples1**3d AWC
34Submittals 03300, 1.4.D. Mix Design4**21d PTSW
35Submittals 03300, 1.4.E. Test Results4**36 hours AWC
36Submittals 15027, 1.3.C.1 Shop Drawings4444**15d ANTP
37Submittals 15027, 1.3.C.2 Test Reports4*AWC
38Submittals 15090, 1.4 B Equipment Submittals4444*15d ANTP
39Submittals 15090, 1.4 C Seismic Drawings4444*15d ANTP
40Submittals 15100, 1.3 Shop Drawings44444**15d ANTP
41Submittals 15250, 1.2.B. Shop Drawings4**15d ANTP
42Submittals 15702, 1.4.B Shop Drawings44**15d ANTP
43Submittals 15702, 1.4.C Welder Certifications4**PTSW
44Submittals 15702, 1.4.D Test Results4**AWC
45Submittals 15702, 3.6.B Cleaning Procedures4**14d PTSW
Schedule of Abbreviations:
AWC
PTSW
AFA= After Work CompletedBMF=Before Material Delivery
PTO= Prior to Starting WorkSN=Advance Notification
PTNT= After Final AcceptanceSRO=After Each Occurrence
ANTP= Prior to OutagePTFI=Prior to Final Inspection
EWD= Prior to Notice to ProceedPTFP=Prior to Final Payment
PTFA= After Notice to ProceedPTCW=Prior to Completing Work
ACA= Each work day AF Form 3000 not requiredAFI=After Final Inspection
= Prior to Final AcceptancePT=Prior To
= After Contract AwardPSS=Per Submittal Schedule

&L&"Times New Roman,Regular"&12Attachment 2&C&"Times New Roman,Regular"&12HTHW SERVICE LINES IDIQ&R&"Times New Roman,Regular"&12FA4626-xx-R-xxxx &L&"Times New Roman,Regular"&12AF Form 66 02:

&F-&D&C&"Times New Roman,Regular"&12 SS-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it. Updated .