Solicitation.doc
DOC document 1 MB Posted
- Attached to
- HICS BORING CABLE REPAIR Federal contract opportunity
- Solicitation number
- FA4626-15-R-0004
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment__2.pdf | ||
| 15-R-0004_Amendment_1.pdf | ||
| 01000_Missile_Conduit_erosion_repair.pdf | ||
| Preproposal_site_visit.pdf | ||
| Attach_1_Specifications.zip | ZIP file | |
| Attach_3_Wage_Determinations.zip | ZIP file | |
| Attach_4_Base_Entry_Policy_Letter.pdf | ||
| Attach_2_Submittal_Schedule.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
BASE YEAR
FFP
The prices provided for Sub-CLINs 0001AA thru 0001BC will be the prices for any and all sites, mobilization, and bonding for the Base Year. Sites to be identified per Delivery Order. THE QUANTITIES PROVIDED FOR IN SUB-CLINS AA THRU BC ARE ESTIMATED QUANTITIES. PAYMENT WILL BE MADE FOR ACTUAL QUANTITIES USED PER DELIVERY ORDER.
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AA
| 6 |
| Each |
Bore Rig Mobilization
This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Bore Rig Mobilization shall be paid as Each (EA).
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AB
| 3 |
| Each |
Erosion Control Mobilization
This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Erosion Control Mobilization shall be paid as Each (EA).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AC
| 625 |
| Linear Foot |
4” Conduit
Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AD
| 109 |
| Linear Foot |
4” Conduit over 500 Feet
Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AE
| 61 |
| Linear Foot |
6” Conduit.
Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AF
| 130 |
| Linear Foot |
Directional Bore Clay 4” conduit
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AG
| 60 |
| Linear Foot |
Directional Bore Clay 6”conduit
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AH
| 10 |
| Linear Foot |
Directional Bore Clay 4”Conduit over 500
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AJ
| 270 |
| Linear Foot |
Directional Bore Cobble 4” Conduit
Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AK
| 10 |
| Linear Foot |
Directional Bore Cobble 6” Conduit
Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AL
| 300 |
| Linear Foot |
Directional Bore Cobble 4” Conduit
Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AM
| 170 |
| Linear Foot |
Directional Bore Rock 4” Conduit
Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AN
| 10 |
| Linear Foot |
Directional Bore Rock 6” Conduit
Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AP
| 109 |
| Linear Foot |
Directional Bore Rock 4” Conduit
Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AQ
| 55 |
| Linear Foot |
Directional Bore Shale 4” Conduit
Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AR
| 10 |
| Linear Foot |
Directional Bore Shale 4” Conduit
Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AS
| 10 |
| Linear Foot |
Directional Bore Shale 6” Conduit
Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AT
| 236 |
| Cubic Yard |
Class III Rip Rap
Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of 9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AU
| 90 |
| Cubic Yard |
Class II Rip Rap
Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of 7.32 - 24 inch. Not to exceed 800 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AV
| 150 |
| Cubic Yard |
Class I Rip Rap
Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24 – 12.6 inch. Not to exceed 800 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AW
| 1,060 |
| Ton Miles |
Rip Rap Hauling
Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location. Rip Rap Hauling will be paid by the Ton/Mile measured from the Malmstrom AFB, MT to the work Location.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AX
| 90 |
| Cubic Yard |
Fill Dirt
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AY
| 70 |
| Cubic Yard |
Top Soil
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AZ
| 1 |
| Each |
Erosion Repair under 50 CY
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001BA
| 10 |
| Cubic Yard |
Erosion Repair Over 50 Cubic Yards
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001BB
| 2 |
| Each |
Straw Wattle
Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001BC
| 1 |
| Lump Sum |
Bonding
Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| OPTION 1 Cable Erosion/Conduit repair |
FFP
The prices provided for Sub-CLINs 1001AA thru 1001BC will be the prices for any and all sites, mobilization, and bonding for the Base Year. Sites to be identified per Delivery Order. THE QUANTITIES PROVIDED FOR IN SUB-CLINS AA THRU BC ARE ESTIMATED QUANTITIES. PAYMENT WILL BE MADE FOR ACTUAL QUANTITIES USED PER DELIVERY ORDER.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AA
| 6 |
| Each |
| OPTION |
| Bore Rig Mobilization |
FFP
This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Bore Rig Mobilization shall be paid as Each (EA).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AB
| 3 |
| Each |
| OPTION |
| Erosion Control Mobilization |
FFP
This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Erosion Control Mobilization shall be paid as Each (EA).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AC
| 625 |
| Linear Foot |
| OPTION |
| 4” Conduit |
FFP
Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AD
| 109 |
| Linear Foot |
| OPTION |
| 4” Conduit over 500 Feet |
FFP
Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AE
| 61 |
| Linear Foot |
| OPTION |
| 6” Conduit. |
FFP
Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AF
| 130 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 4” conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AG
| 60 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 6”conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AH
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 4”Conduit over 500 |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AJ
| 270 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AK
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AL
| 300 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 4” Conduit |
FFP
Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AM
| 170 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AN
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AP
| 109 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 4” Conduit |
FFP
Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AQ
| 55 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AR
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 4” Conduit |
FFP
Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AS
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AT
| 236 |
| Cubic Yard |
| OPTION |
| Class III Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of 9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AU
| 90 |
| Cubic Yard |
| OPTION |
| Class II Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of 7.32 - 24 inch. Not to exceed 800 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AV
| 150 |
| Cubic Yard |
| OPTION |
| Class I Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24 – 12.6 inch. Not to exceed 800 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AW
| 1,060 |
| Ton Miles |
| OPTION |
| Rip Rap Hauling |
FFP
Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location. Rip Rap Hauling will be paid by the Ton/Mile measured from the Malmstrom AFB, MT to the work Location.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AX
| 90 |
| Cubic Yard |
| OPTION |
| Fill Dirt |
FFP
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AY
| 70 |
| Cubic Yard |
| OPTION |
| Top Soil |
FFP
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AZ
| 1 |
| Each |
| OPTION |
| Erosion Repair under 50 CY |
FFP
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001BA
| 10 |
| Cubic Yard |
| OPTION |
| Erosion Repair Over 50 Cubic Yards |
FFP
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001BB
| 2 |
| Each |
| OPTION |
| Straw Wattle |
FFP
Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001BC
| 1 |
| Lump Sum |
| OPTION |
| Bonding |
FFP
Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| OPTION 2 Cable Erosion/Conduit repair |
FFP
The prices provided for Sub-CLINs 2001AA thru 2001BC will be the prices for any and all sites, mobilization, and bonding for the Base Year. Sites to be identified per Delivery Order. THE QUANTITIES PROVIDED FOR IN SUB-CLINS AA THRU BC ARE ESTIMATED QUANTITIES. PAYMENT WILL BE MADE FOR ACTUAL QUANTITIES USED PER DELIVERY ORDER.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AA
| 6 |
| Each |
| OPTION |
| Bore Rig Mobilization |
FFP
This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Bore Rig Mobilization shall be paid as Each (EA).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AB
| 3 |
| Each |
| OPTION |
| Erosion Control Mobilization |
FFP
This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Erosion Control Mobilization shall be paid as Each (EA).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AC
| 625 |
| Linear Foot |
| OPTION |
| 4” Conduit |
FFP
Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AD
| 109 |
| Linear Foot |
| OPTION |
| 4” Conduit over 500 Feet |
FFP
Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AE
| 61 |
| Linear Foot |
| OPTION |
| 6” Conduit. |
FFP
Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AF
| 130 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 4” conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AG
| 60 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 6”conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AH
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 4”Conduit over 500 |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AJ
| 270 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AK
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AL
| 300 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 4” Conduit |
FFP
Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AM
| 170 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AN
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AP
| 109 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 4” Conduit |
FFP
Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AQ
| 55 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AR
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 4” Conduit |
FFP
Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AS
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AT
| 236 |
| Cubic Yard |
| OPTION |
| Class III Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of 9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AU
| 90 |
| Cubic Yard |
| OPTION |
| Class II Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of 7.32 - 24 inch. Not to exceed 800 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AV
| 150 |
| Cubic Yard |
| OPTION |
| Class I Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24 – 12.6 inch. Not to exceed 800 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AW
| 1,060 |
| Ton Miles |
| OPTION |
| Rip Rap Hauling |
FFP
Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location. Rip Rap Hauling will be paid by the Ton/Mile measured from the Malmstrom AFB, MT to the work Location.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AX
| 90 |
| Cubic Yard |
| OPTION |
| Fill Dirt |
FFP
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AY
| 70 |
| Cubic Yard |
| OPTION |
| Top Soil |
FFP
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AZ
| 1 |
| Each |
| OPTION |
| Erosion Repair under 50 CY |
FFP
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001BA
| 10 |
| Cubic Yard |
| OPTION |
| Erosion Repair Over 50 Cubic Yards |
FFP
Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001BB
| 2 |
| Each |
| OPTION |
| Straw Wattle |
FFP
Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001BC
| 1 |
| Lump Sum |
| OPTION |
| Bonding |
FFP
Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| OPTION 3 Cable Erosion/Conduit repair |
FFP
The prices provided for Sub-CLINs 3001AA thru 3001BC will be the prices for any and all sites, mobilization, and bonding for the Base Year. Sites to be identified per Delivery Order. THE QUANTITIES PROVIDED FOR IN SUB-CLINS AA THRU BC ARE ESTIMATED QUANTITIES. PAYMENT WILL BE MADE FOR ACTUAL QUANTITIES USED PER DELIVERY ORDER.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AA
| 6 |
| Each |
| OPTION |
| Bore Rig Mobilization |
FFP
This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Bore Rig Mobilization shall be paid as Each (EA).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AB
| 3 |
| Each |
| OPTION |
| Erosion Control Mobilization |
FFP
This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Erosion Control Mobilization shall be paid as Each (EA).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AC
| 625 |
| Linear Foot |
| OPTION |
| 4” Conduit |
FFP
Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AD
| 109 |
| Linear Foot |
| OPTION |
| 4” Conduit over 500 Feet |
FFP
Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AE
| 61 |
| Linear Foot |
| OPTION |
| 6” Conduit. |
FFP
Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AF
| 130 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 4” conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AG
| 60 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 6”conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AH
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Clay 4”Conduit over 500 |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AJ
| 270 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AK
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AL
| 300 |
| Linear Foot |
| OPTION |
| Directional Bore Cobble 4” Conduit |
FFP
Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AM
| 170 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AN
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AP
| 109 |
| Linear Foot |
| OPTION |
| Directional Bore Rock 4” Conduit |
FFP
Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AQ
| 55 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 4” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AR
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 4” Conduit |
FFP
Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AS
| 10 |
| Linear Foot |
| OPTION |
| Directional Bore Shale 6” Conduit |
FFP
Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AT
| 236 |
| Cubic Yard |
| OPTION |
| Class III Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of 9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AU
| 90 |
| Cubic Yard |
| OPTION |
| Class II Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of 7.32 - 24 inch. Not to exceed 800 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AV
| 150 |
| Cubic Yard |
| OPTION |
| Class I Rip Rap |
FFP
Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24 – 12.6 inch. Not to exceed 800 cubic yards per site.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AW
| 1,060 |
| Ton Miles |
| OPTION |
| Rip Rap Hauling |
FFP
Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location.