Attch_2_Submittal_Schedule__MEECN_Vault.xls

XLS spreadsheet 38 KB Posted

Attached to
Construct MEECN Vault Federal contract opportunity
Solicitation number
FA4626-14-R-0030
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 2 Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Construct MEECN Vault, newest first.
File Type Posted
MEECN_Vault_Questions_-_8-20-14.pdf PDF
MEECN_Vault_Questions_-_8-19-14.pdf PDF
Pre_-Preposal_Conference_Minutes.pdf PDF
Drawings.zip ZIP file
Specs.zip ZIP file
Attch_3_Schedule_of_Drawings.docx DOCX document
Attch_5_Wage_Determination.pdf PDF
Attch_6_Base_Entry_Policy_Letter.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 15-0038Construct MEECN VaultFA4626-14-R-0030
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1As-Built Field Drawings 01000 3.54PTFA
2Operating and Maintenance Instructions 01000 3.74PTFA
3Shop Drawings 01000 3.10 as Required by Technical Specifications4PTSW
4Start of Work Notification 01000 3.114PTSW
5Notice of Final Inspection 01000 3.121PTFA
6Utility Outage Notices 01000 3.141PTO
7Submittals 01000 3.151PTSW
8Quality Control Plan 01000 3.18.21PTSW
9Quality Control Records 01000 3.18.44PTFA
101354 Checklist (Property Inventory Checklist) 01000 3.194PTSW
11Identification of Employees 01001 1.1.A1PTSW
12Asbestos Report / Removal Plan 241104PTSW
13Carpet Sample 0968134PTSW
14Manufacturer's Literature, Vault Door, 1102004PTSW
15Test and Balance Report, HVAC, 2305934PTFI
16Light Fixtures, 2651004PTSW
17Plans and Literature, Intrusion Detection System, 2816004PTSW
18Fire Alarm Devices Literature 2831114PTSW
Schedule of Abbreviations:
D - DaysPSW - Prior to Start WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning Construction

&L&"Times New Roman,Regular"&12Attachment 2&C&"Times New Roman,Regular"&12Title&R&"Times New Roman,Regular"&12FA4626-14-R-0030 &L&"Times New Roman,Regular"&12This list is not all inclusive. If needed, additional items may be added.

AF Form 66 &D&C&"Times New Roman,Regular"&12

SS-&P

REQUIRED TECHNICAL SUBMITTALS