Submittal Schedule F-01.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
RECOVERY--PROJECT NUMBER NZAS092006, Repair Alert Facility Water Well (F-01)
Solicitation number
FA4626-09-R-0042
Issued by

About this file

Solicitation Atch 2 Submittal Schedule

View the file

Other files

File Type Posted
Solicitation.doc DOC document
Wage Determination 2005-2317 Rev 8 dated 26 May 09.docx DOCX document
Drawings.zip ZIP file
Specifications.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 09-2008Repair Well at F-1 MAFFA4626-09-R-0042
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 1 - GENERAL
101000 3.3, SCHEDULE OF MATERIALS SUBMITTALS210 D ANTP
201000 3.14, QC Plan410 D ANTP
301000 3.17D., Final As-Built Drawings110 D AFI
401000 3.22; Work Clearance Request1as req'd
501000 3.28, Operations & Maintenance Manuals410 D PFI
601000 3.29B, Itemized Equipment List410 D PFI
701000 3.29C, Guarantees for Equipment items410 D PFI
801000 3.29D, Extra Materials45 D PFI
901000 3.30, Notice of Final Inspection and Acceptance45 D PPC

10 01001 3.1A; EAL 4 15 D PSW

DIVISION 1360 - Environmental
1101360 2.2, Permits4as req'd
1201360 11.6, Waste Management Plan410 D PFI
1301360 12.7, Recycled Materials Uitlization Form410 D PFI
DIVISION 2 - SITE WORK REQUIREMENTS
1402525 1.1A, Drilling Data Field Reports420 D A Completion of Drilling
1502525 2.1A. Well Casing and couplings45 D PSW
1602525 2.1B. Pitless Adapter45 D PSW
1702525 2.1C. Well Seal45 D PSW
1802525 2.1D. Grout45 D PSW
1902525 2.1E. Well screen45 D PSW
2002525 2.1F&H. Submersible pump and motor445 D PSW
2102525 2.2F. Performance Test Results45 D ATT
2202526 1.1C. Field Report on Abandonment45 D ATT
DIVISION 3
2303300 2.1E. Concrete Mix Design45 D PSW
DIVISION 15 - MECHANICAL
2415250 1.2. Pipe Insulation45 D PSW
25water softener445 D PSW
26duplex media filter445 D PSW
DIVISION 16 - ELECTRICAL
2716110 1.2, Raceways and Fittings45 D PSW
2816120 1.2, Conductors45 D PSW
D - DaysPSW - Prior to Stort WorkStart WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prioir to Testing
ATT - After Test is TakenPBC - Prior to Beginning Conctruction

&"Times New Roman,Regular"&12Attachment 2

&"Times New Roman,Regular"&12AF Form 66

02: 000510_AC01_00_90-

&F-&D &"Times New Roman,Regular"&12SS-&P of &N

File details come from the government source that posted it. Updated .