Attachment 2 - Submittal Schedule.xls

XLS spreadsheet 34 KB Posted

Attached to
RECOVERY--PROJECT NUMBER NZAS092009, Repair Lagoons at Two Alert Facilities
Solicitation number
FA4626-09-R-0036
Issued by

About this file

Attachment 2 - Submittal Schedule (excel file)

View the file

Other files

File Type Posted
FA4626-09-R-0036-0001.zip ZIP file
Concerns regarding 36 mil Liner and 20 year warantee.docx DOCX document
Attachment 4 - Drawings.zip ZIP file
Attachment 3 - Schedule of Drawings.doc DOC document
Attachment 5 - Wage Determination.doc DOC document
Attachment 6 - Past and Present Performance Questionnaire.doc DOC document
Attachment 1 - Specs.zip ZIP file
SF1442.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 09-2009Update Sewage Lagoons at G-1 and K-1FA4626-09-R-0036
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
101000, Pg 7, 3.14.B. Quality Control Plan410D ANP
201000, Pg 11, 3.17.D. As built field drawings410D AFI
301000, Pg. 15, 3.28.A. Operating and Maintenance Instruction Manuals420D AFA
401005, Pg. 3, 4.3.1. General Permit for Storm Water Discharges (if applicable)410D PSW
501200-1, Article 9. Letter stating name and experience of surveyor410D PSW
602220, Pg 6, Part 5. Signed survey of lagoon410D PTI
702225, Pg 8, Part 4. Standard Proctor Curves436H ATS
802225, Pg 8, Part 4. Density test results4IAT
902490, Pg 2, Part 3. Seed certification tags410D AC
1002830, Pg 1, Part 5. Product Brochures and Catalog Data410D ANP
1103300, Pg 1, 2.1.E, Concrete batch plant mix design410D ANP
1206660, Pg 1, 1.2. Name, address, phone, fax and qualifications of liner manufacturer, proposed fabricator and installer410D PTI
1306660, Pg 1, 1.3. Product data and specifications430D ANP
1406660, Pg 2, 1.4. Polypropylene Panel Layout410D ANP
1506660, Pg 2, 1.6.B. Shear seam strength and peel adhesion test results410D ATS
1606660, Pg 3, 1.7. Written certification of meeting material requirements410D PTI
1706660, Pg 6, Part 3. Warranty from polypropylene manufacturer410D PTS
1806665, Pg 2, 2.05. Sample of HDPE drainage net and geotextile110D PTS
1906665, Pg 2, 3.01. Notarized certification of material meeting specifications410D PTI
2015065, Pg 8, Part 4. Catalog cuts of piping and appurtenances410D PTI
2115065, Pg 8, Part 4. Test results410D PTI
ANP - After Notice to ProceedATS - After Taking SamplePTS - Prior to Shpment
PSW - Prior to Start of WorkAFI - After Final InspectionAFA - After Final Acceptance
AC - After CompletionPTI - Prior to InstallationIAT - Immediately After Test

&L&"Times New Roman,Regular"&12ATTACHMENT 2&C&"Times New Roman,Regular"&12MALMSTROM AFB MT&R&"Times New Roman,Regular"&12FA4626-09-R-0036 &L&"Times New Roman,Regular"&12AF FORM 66&R&"Times New Roman,Regular"&12SS - &P

File details come from the government source that posted it. Updated .