Attachment 2 - Submittal Schedule.xls

XLS spreadsheet 36 KB Posted

Attached to
RECOVERY-- NZAS051059 - Repair Berm, Muns Stor B1893
Solicitation number
FA4626-09-R-0010
Issued by

About this file

Submittal Schedule

View the file

Other files

File Type Posted
preproposal 09D0010.doc DOC document
Attachment 4 - Drawings.zip ZIP file
Attachment 3 - Schedule of Drawings.doc DOC document
Sol FA4626-09-R-0010, Berms B1893.doc DOC document
Attachment 1 - Specifications.zip ZIP file
Attachment 6 - Survey.doc DOC document
Attachment 5 - Wage Determination-MT1.doc DOC document
Cover sheets.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 05-1059Repair Berm Building 1893FA4626-09-R-0010
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 1 - GENERAL
101000 3.5.2, As-Built Field Data13 D PFI
201000 3.5.3.1, Names of Drafters43 D PWS
301000 3.5.2, Final As-Built Drawings130 D AFI
401000 3.5.4.3 Marked up As-Builts15 D PT
501000 3.7, Shop Drawings45 D PBC
601000 3.16.2 Contractors Quality Control Plan415 D PBC
701001 1.1.1 AF Form 75 or Af Form 355114 D PBC
DIVISION 2 - SITE WORK REQUIREMENTS
802201 1.5 Utility Notices
902201 3.1 Type 1 Bedding Material Sieve Analysis & Proctor414 D ANP
1002201 3.2 Type 2 Bedding Material Seive Analysis & Proctor414 D ANP
1102201 Imported Backfill Material Sieve Analysis & Proctor
1202201 4.3 Compaction Test Results414 D ANP
1302203 Subgrade Proctor
1402203 Compaction Results
1502203 Fill Material Proctor
1602203 Compaction Results
1702580 3.1 Gravel Subbase Course Seive414 D ANP
1802580 3.1 Gravel Subbase Course Proctor414 D ANP
1902580 3.1 Gravel Subbase Course Liquid Limit414 D ANP
2002580 3.1 Gravel Subbase Course Plasticity Index414 D ANP
2102580 3.2 Crushed Gravel Base Course Seive414 D ANP
2202580 3.2 Crushed Gravel Base Course Proctor414 D ANP
2302580 3.2 Crushed Gravel Base Course Liquid Limit414 D ANP
2402580 3.2 Crushed Gravel Base Course Plasticity Index414 D ANP
2502580 3.3 Tack Coat414 D ANP
2602580 3.4 Asphalt Mix Design414 D ANP
2702580 3.4 Asphalt Mix Marshal414 D ANP
2802580 4.3 Gravel Subbase Course Density Testing41 D ATT
2902580 4.3 Crushed Gravel Base Course Density Testing41 D ATT
3002580 4.5 Asphalt Pavement Density Testing41 D ATT
3102750 3.3 Storm Drain Pipe and Fittings
3202750 3.3 Inlet Grates and Frames
3302820 2.3 Seed Vendor's Certified Statement
3402820 4.1 Topsoil source, ownership and crop data
35Sheet 2, Detail 1, Detail Geotextile Fabric414 D PBC
DIVISION 3 - CONCRETE REQUIREMENTS
3603010 3.1.1.1 Portland Cement414 D PBC
3703010 3.3 Fly Ash & Pozzolanic Materials414 D PBC
3803010 3.4 Chemical Admixtures414 D PBC
3903010 3.5 Concrete Aggregate414 D PBC
4003010 3.7 Sampling and Testing of Materials414 D PBC
4103010 3.7.1 Cement Testing414 D PBC
4203010 3.7.2 Fine Course Aggregate414 D PBC
4303010 3.8.4.1 Concrete Mix Design for Each Mix421 D PSW
4403010 4.3.4 Admixtures414 D PBC
4503020 3.3 Reinforcement Bars414 D PBC
4603020 3.4 Bar and Rod Mats414 D PBC
4703020 3.6 Expansion Joint Materials41 D BBCW
4803020 3.7 Curing Compounds
4903020 Reinforcement Shop Drawings
5003020 Concrete Placing Noficication
5103020 4.10 Concrete ACI Certified Testing Results47 D ATT
5203031 1.3 Manufacturer's Technical Information
5303031 1.3 Samples of Stucco Color and Texture
D - DaysPSW - Prior to Start WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning Conctruction

&LRepair Berm, Bldg. 1893 NZAS 05-1059&RAttachment 2

FA4626-09-R-0010

&L&"Times New Roman,Regular"AF Form 66

02: 000510_AC01_00_90-

12 Mar 09&C&"Times New Roman,Regular"&12SS-&P of &N