FA462519R0010 Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA462519R0010_Lime_Sludge_Questions_and_Answers.pdf | ||
| FA462519R0010_Atch_2_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Attachemnt_6_Amendment_Acknowledgment.pdf | ||
| FA462519R0010_Amendment_2.pdf | ||
| FA462519R0010_Lime_Sludge_Combo_Amendment_1.pdf | ||
| FA462519R0010_Atch_2_Bid_Schedule.xlsx | XLSX spreadsheet | |
| FA462519R0010_Atch_4_Lime_Sludge_Sample_Test.pdf | ||
| FA462519R0010_Atch_3_Site_Visit_Notes_190625.pdf | ||
| FA462519R0010_Atch_1_PWS_Lime_Sludge_Disposal_-_9_May.pdf | ||
| FA462519R0010_Atch_5_Clauses.pdf | ||
| 19R0010_Atch_3_Whiteman_AFB_Water_Permit.pdf | ||
| 19R0010_Atch_2_Bid_Schedule.xlsx | XLSX spreadsheet | |
| FA462519R0010_Lime_Sludge_18Jun19.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
LIME SLUDGE REMOVAL & DISPOSAL
Whiteman AFB, Missouri 9 May 2019
1. GENERAL
1.1. DESCRIPTION AND SCOPE OF WORK. The contractor shall provide all labor, equipment, tools, supplies, tanks, vehicles, and permits required by Missouri Department of Natural Resources (MDNR) to perform all operations necessary for removal and disposal of thickened lime sludge from the Water Treatment Facility located on Whiteman AFB, MO, in strict accordance with these specifications and subject to the terms of the contract.
1.2. SPECIFICATIONS AND DESCRIPTION OF WORK. The specifications herein state the work to be performed under this contract, Lime Sludge Removal and Disposal, shall be conducted in conformity with applicable Federal, State, and Air Force regulations.
Contractor shall be responsible for possessing appropriate permits and performing all necessary testing for proper disposal. The contractor shall be responsible for assuring that all work accomplished and materials used are in accordance with all specifications. Sludge is a white lime slurry material made up of an average of 10% lime sludge and 90% water. These percentages are estimates and will vary.
1.3. PERMITS. The Contractor shall possess and maintain any and all required operating permits for removal, disposal and storage, in the performance of this contract. For required reporting purposes, the Contractor shall provide the Government with application rates and soil sample results for inclusion in the Whiteman AFB annual report, due by December of each year. Contractor shall also be responsible for submitting all required annual reports under their permit. The Contractor shall be liable for any monetary fines from the State of Missouri or Environmental Protection Agency (EPA) for the unpermitted discharge of lime sludge. For reference, Whiteman AFB (Government) has a Missouri State Operating Permit, #MO-G640090.
1.4 ALTERNATIVE DISPOSAL. If land application is not the intended disposal method, the contractor shall provide a detailed description of the process and all permits or approvals associated with this process, prior to contract award.
2. REMOVAL
2.1. Lime sludge shall be removed from the sludge thickening tank located within the fenced area of the Whiteman AFB Water Treatment Facility. This area is located on Whiteman AFB, Southwest of the intersection of Mitchell Avenue and Tinian Loop. The sludge thickening tank and spent wash basin are located in the southeast corner of the enclosed area, adjacent to a gravel driveway.
2.2. The Contractor shall remove sludge from the sludge thickening tank to the level of the discharge pipe, which is 12 feet above the pavement. This is a gravity flow only tank, no pumps or pumping required.
2.3. Under normal circumstances, full truckloads of thickened sludge shall be drawn from the sludge thickening tank. The Contractor shall notify a Water Treatment Plant Operator whenever a load of sludge is removed from the sludge thickening tank. Water Treatment
Plant Operators will be allowed to check the level of sludge in the Contractor’s hauling tank to determine if it is at the level that corresponds to the certified capacity. If a partial load of sludge is removed, the volume of sludge shall be determined by the use of the Contractor furnished dipstick or sight-glass. All readings taken by Water Treatment Plant Operators will be rounded off to the nearest 25 gallons and accomplished with the truck parked on reasonably level ground. Prior to leaving the Water Treatment Plant, the contractor (or contractor’s operator) shall initial the log verifying the number of gallons annotated. If the Contractor feels the readings taken by the Water Treatment Plant Operators are inaccurate, they shall notify the Contracting Officer and have the problem resolved prior to leaving Whiteman AFB. Once the Contractor’s vehicle leaves Whiteman AFB, the quantity entered in the Water Treatment Facility log shall be final.
2.4. Gravity Sludge Thickening Tank. The Contractor shall remove approximately 12,000 gallons of sludge per week from the gravity sludge thickening tank.
2.5. Spent Wash Basin. Periodically, there is a requirement for the Contractor to remove, an estimated 90,000 gallons of lime sludge from the spent wash basin. It is estimated that this shall be required every 3 years. The Government will provide the required pumps and hoses.
This is an estimate only of the quantity and time period for removal. When there is a requirement to remove this additional sludge, advance notice will be provided and coordinated with the Contractor, as well as the appropriate funding added to the contract line item.
3. STORAGE
3.1. The Government stores the sludge in a 24-foot diameter, 20-foot high (19-foot water level) sludge thickening tank. Lime sludge withdrawal shall be by gravity flow through a 4-inch pipe outlet 12 feet above ground. Note: Due to space limitations within the Water Treatment Plant, a semi-truck (18-wheeled) shall not be utilized to haul sludge.
3.2. The Contractor shall provide a permitted, off-base storage facility to store sludge when land application is not allowed by permit. The storage facility shall be permitted by MDNR and maintained to prevent accidental discharge into waterways. The Contractor shall identify any storage facility to be used and submit a copy of the MDNR permit prior to award.
4. DISPOSAL, TESTING AND CLEANING
4.1. Lime sludge shall be disposed of in accordance with the contractor’s MDNR permit or by an MDNR approved alternate method. Disposal location and process is at the discretion of the Contractor and must be MDNR approved. The Government does not offer a disposal site.
4.2. The Contractor shall provide a legal description of all land application sites. That description shall be submitted to the Contracting Officer prior to the pre-performance conference. Any changes to land application areas shall be submitted to the Contracting Officer prior to land application. Soil testing, as applicable, shall be a requirement of the contractor. As required for reporting per Whiteman AFB’s operating permit, soil testing for each parcel of land shall be conducted at least once every five (5) years where lime sludge is land applied and the results provided to the Government. In addition, soil shall be tested at least annually for total aluminum concentration on a dry weight basis and for soil pH. All other portions in the Land Application Requirements section in the operating permit shall be adhered to as well. If land application is to occur for the first time on a field, soil testing shall be conducted and a copy of the test results provided to Water Plant for verification of permit compliance prior to the commencement of land application. After initial testing, all laboratory results/reports of soil testing shall be provided to 509 CES/CEOIA (Water Treatment Facility) no later than 10 December of the current years lime sludge hauling. Frequency for testing and analytics to be tested shall be determined by the permit. POC information will be provided by the Government upon contract award.
4.3. The Contractor shall be responsible for fully cleaning any spillage during loading, to the approval of the authorized Contracting Officer Representative (COR), with coordination of the Water Treatment Plant Operator. Any spillage occurring during transportation shall be cleaned up in accordance with any and all state regulations. All spills shall be reported to the Contracting Officer Representative within 24 hours of spillage occurring.
5. INSPECTIONS
5.1. All work performed, the methods and manner of performance, all areas used by the Contractor, and all equipment, materials, and supplies used for the work shall be subject to inspection at any and all times by the authorized COR. The Contracting Officer will issue all notices of unsatisfactory conditions or services in writing to the Contractor.
6. HOURS OF OPERATION. The Contractor shall perform the services required under this contract during the following hours:
6.1. Normal Operations. Normal hours of operation at Whiteman AFB are Monday through Friday, 0730-1630, except for Federal Holidays. Changes to pick-up scheduling shall be coordinated with the COR and Water Plant Treatment Plant Operator.
6.2. Federal Holidays. The following is a list of Federal Holidays observed by this installation:
New Year's Day, 1 January or the Friday preceding or Monday following Martin Luther King's Birthday, 3rd Monday in January President's Day, 3rd Monday in February Memorial Day, Last Monday in May Independence Day, 4 July or the Friday preceding or Monday following Labor Day, First Monday in September Columbus Day, 2nd Monday in October Veterans Day, 11 November or the Friday preceding or Monday following Thanksgiving Day, 4th Thursday in November
Christmas Day, 25 December or the Friday preceding or Monday following
7. PERSONNEL
7.1. The contractor shall ensure all personnel are trained and qualified to perform their duties.
7.2. The contractor and contract employees shall be subject to all base instructions, including but not limited, to all vehicle traffic and security instructions. The contractor shall ensure each employee obtains a contractor pass. This shall be accomplished by completing an Entry Authorization List (EAL) through CE Service Contracts office. All employees shall have the contractor pass in their possession at all times when on base. Contractor employees shall be readily identifiable while on base and display their identification badges. The base pass will suffice for the identification badge.
8. EQUIPMENT
8.1. The Contractor shall provide all necessary equipment to remove and dispose of the thickened lime sludge.
8.2. The Contractor shall provide suitable equipment for hauling sludge from the sludge thickening tank to the disposal site. The hauling container shall consist of a tank or tanks capable of being filled through an opening on top and designed to prevent leakage or splashing of sludge while in transit. The tank shall be equipped with a sight glass calibrated in 250-gallon increments. Upon contract award, the Contractor shall provide third party documentation certifying the calibration of the sight glass.
8.3. The Government will furnish no equipment, material or labor for hauling or disposal of the sludge. The Government will provide adequate piping and valves, to be operated by the Contractor and maintained by the Government, for gravity removal of the sludge from the Government’s sludge thickening tank. The current system consists of a 4” pipe that extends 10’ horizontally from the tank and suspends 12’ above the road that allows trucks to pull underneath to dispense the lime slurry. A valve is used to control the flow of the lime slurry.
The Contractors hauling equipment shall be compatible with the Government’s system/piping.
8.4. All of the Contractor’s equipment shall be equipped with proper safety and noise limiting devices and will be in safe operating condition.
9. VEHICLES
9.1. Vehicles must be operated in accordance with base rules and regulations while on the base. The Contractor shall maintain all vehicular equipment used under this agreement in good repair, safe to operate, and in a clean condition. The Contractor’s name shall be displayed prominently on each contractor-owned vehicle.
9.2. The contractor should anticipate delays in getting commercial vehicles on base and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits throughout the base. Procedures for commercial vehicle access to the base are subject to change without prior notice.
10. BILLING
10.1. INVOICES/SERVICE TICKETS/LOGS. Invoicing/billing shall be done via Wide Area Work Flow (WAWF) at https://wawf.eb.mil/. Invoices shall detail date(s) of service, quantity/cost of each service, and total cost. Service tickets/logs, at a minimum, shall reflect the date, time, and number of gallons removed. A copy of the tickets/logs shall be sent to 509 CES/CEOIA (Water Treatment Facility).
11. CONTRACTOR MANPOWER REPORTING
11.1. The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
11.2. Reporting inputs will be for the labor executed during the period of performance for each Government Fiscal Year (FY), which runs 1 October through 30 September. (While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year). Contractors may direct questions to the CMRA help desk.
Reporting Period: Contractors are required to input data by 31 October of each year.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will the data be released to the public with the contractor name and contractor number associated with the data.
User Manuals: User manuals for government personnel and contractors are available at the CMRA link at http://www.ecmra.mil.
12. DEFINITIONS
12.1. SLUDGE: Defined as the semi solid by-product produced by the coagulation/softening process for drinking water.
12.2. OPERATOR: Defined as an individual, either civilian or military, employed by the Government and working at the Water Treatment Facility Whiteman Air Force Base, Missouri.
End of Statement of Work http://www.ecmra.mil/ http://www.ecmra.mil/
| PERFORMANCE WORK STATEMENT |
| FOR |
| Whiteman AFB, Missouri |
| 9 May 2019 |
| 2. REMOVAL |
| 3. STORAGE |
| 4. DISPOSAL, TESTING AND CLEANING |
| 5. INSPECTIONS |
| 7. PERSONNEL |
| 8. EQUIPMENT |
| 9. VEHICLES |
| 10. BILLING |
| 11. CONTRACTOR MANPOWER REPORTING |
| 12. DEFINITIONS |