Attachment 2 Bid Schedule.xls

XLS spreadsheet 76 KB Posted

Attached to
Services, Non Personal; Government Furnished Carpet Installation
Solicitation number
FA4625-08-R-0006
Issued by

About this file

Bid Schedule

View the file

Other files

File Type Posted
Amendment 2.pdf PDF
Appendix A Government Furnished Property.doc DOC document
Admendment.pdf PDF
Attachment 1 PWS.doc DOC document
solicitation2 clean.doc DOC document
Attachment 4 PPT Questionnaire.doc DOC document
APPENDIX A Government Furnished Materials.doc DOC document
Attachment 5 PERFORMANCE PLAN.doc DOC document
Attachment 3 WD 05-2307.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Year

Schedule B
NON-PERSONAL SERVICES: Provide all personnel, equipment, tools, materials, supervision, other items and services necessary to perform Floor Covering Installation at Whiteman AFB MO in accordance with the Statement of Work (SOW).
BASIC YEAR: 1 SEP 2008 THRU 31 AUG 2009
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
0001PERFORM FURNITURE MOVING
0001AALight Furniture400HR
0001ABHeavy Furniture200HR
0001ACSystems Furniture ( Repair)40HR
0001ADModular Furniture (Repair)40HR$0.00
0002REMOVE AND DISPOSE OF MATERIALS
0002AAGlue-Down Carpet8000SY
0002ABStretched-In Carpet2,500SYF
0002ACCarpet Padding1500SY
0002ADCarpet Tile2500SF
0002AEVinyl Composition Tile12000SF
0002AFSheet Vinyl500SY
0002AGRubber Floor Tile4500SF
0002AHWall Base (Wood, rubber, Vinyl) 4"12000LF
0002AJWall Base (Wood, rubber, Vinyl)6"4000LF
0002AKStair Treads/Nosings500LF
0002ALTransition Strip (Vinyl, Metal)1400LF
0002AMCeramic Tile Underlayment100SF
0002ANCeramic,Porcelain, Tile600SF
0002APR&R Thresholds175EA$0.00
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
0003PERFORM FLOOR COVER INSTALLATION
0003AAGlue-Down Carpet8000SY
0003ABStretched-In Carpet2,500SY
0003ACCarpet Padding1500SY
0003ADCarpet Tile600SF
0003AEVinyl Tile Composition12000SF
0003AFSheet Vinyl250SY
0003AGRubber Floor Tile5000SF
0003AHCeramic,Porcelain, Tile600SF
0003AJEpoxy Poured Floor2500SF$0.00
0004PERFORM INSTALLATION OF FLOOR ACCESSORIES
0004AAWall Base ( Rubber, Vinyl)4"12000LF
0004ABWall Base (Rubber, Vinyl ) 6"4000LF
0004ACWall Base ( Wood with Shoe,(Oak) and Finish800LF
0004ADVinyl Transition750LF
0004AEMetal Transition650LF
0004AFDoor Threshold Plate80EA
0004AGStair Treads/Nosings500LF
0004AHFloor Prep/Patch/Level /Sand1250SF$0.00
0005OTHER FLOOR COVER REQUIREMENTS
0005AAModify/Cut Wood Doors80EA
0005ABCarpet Binding & Serging150LF
0005ACInstall Carpet on Stairs and Steps850EA
0005ADInstall Carpet as Base board1500LF
0005AEInstall Carpet on Stringer250LF
0005AFInstall Carpet as Border, 18" Wide400LF
0005AGInstall Carpet as Border, 24" Wide400LF
0005AHInstall Carpet as Border, 36" Wide300LF
0005AJR&R Toilets22EA
0005AKR&R Floor Telephone & Elec Outlet covers80EA$0.00
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
0006REIMBURSEMENT FOR UNEXPECTED OR SHORT NOTICE CONTRACTOR FURNISHED MATERIALS AND OTHER MISC FLOOR REQUIREMENTS1EaNTE $5,000
Total Base Year$

&C&"Arial,Bold"&14

&RFA4625-08-R-0006

Attachment 2 $0.00 $0.00 $0.00 $0.00 $0.00

Option Year 1

Schedule B
NON-PERSONAL SERVICES: Provide all personnel, equipment, tools, materials, supervision, other items and services necessary to perform Floor Covering Installation at Whiteman AFB MO in accordance with the Statement of Work (SOW).
OPTION YEAR 1: 1 SEP 2009 THRU 31 AUG 2010
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
1001PERFORM FURNITURE MOVING
1001AALight Furniture400HR
1001ABHeavy Furniture200HR
1001ACSystems Furniture ( Repair)40HR
1001ADModular Furniture (Repair)40HR$0.00
1002REMOVE AND DISPOSE OF MATERIALS
1002AAGlue-Down Carpet8000SY
1002ABStretched-In Carpet2,500SYF
1002ACCarpet Padding1500SY
1002ADCarpet Tile2500SF
1002AEVinyl Composition Tile12000SF
1002AFSheet Vinyl500SY
1002AGRubber Floor Tile4500SF
1002AHWall Base (Wood, rubber, Vinyl) 4"12000LF
1002AJWall Base (Wood, rubber, Vinyl)6"4000LF
1002AKStair Treads/Nosings500LF
1002ALTransition Strip (Vinyl, Metal)1400LF
1002AMCeramic Tile Underlayment100SF
1002ANCeramic,Porcelain, Tile600SF
1002APR&R Thresholds175EA$0.00
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
1003PERFORM FLOOR COVER INSTALLATION
1003AAGlue-Down Carpet8000SY
1003ABStretched-In Carpet2,500SY
1003ACCarpet Padding1500SY
1003ADCarpet Tile600SF
1003AEVinyl Tile Composition12000SF
1003AFSheet Vinyl250SY
1003AGRubber Floor Tile5000SF
1003AHCeramic,Porcelain, Tile600SF
1003AJEpoxy Poured Floor2500SF$0.00
1004PERFORM INSTALLATION OF FLOOR ACCESSORIES
1004AAWall Base ( Rubber, Vinyl)4"12000LF
1004ABWall Base (Rubber, Vinyl ) 6"4000LF
1004ACWall Base ( Wood with Shoe,(Oak) and Finish800LF
1004ADVinyl Transition750LF
1004AEMetal Transition650LF
1004AFDoor Threshold Plate80EA
1004AGStair Treads/Nosings500LF
1004AHFloor Prep/Patch/Level /Sand1250SF$0.00
1005OTHER FLOOR COVER REQUIREMENTS
1005AAModify/Cut Wood Doors80EA
1005ABCarpet Binding & Serging150LF
1005ACInstall Carpet on Stairs and Steps850EA
1005ADInstall Carpet as Base board1500LF
1005AEInstall Carpet on Stringer250LF
1005AFInstall Carpet as Border, 18" Wide400LF
1005AGInstall Carpet as Border, 24" Wide400LF
1005AHInstall Carpet as Border, 36" Wide300LF
1005AJR&R Toilets22EA
1005AKR&R Floor Telephone & Elec Outlet covers80EA$0.00
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
1006REIMBURSEMENT FOR UNEXPECTED OR SHORT NOTICE CONTRACTOR FURNISHED MATERIALS AND OTHER MISC FLOOR REQUIREMENTS1EaNTE $5,000
Total Option Year 1$

&C&"Arial,Bold"&14

&RFA4625-08-R-0006

Attachment 2 $0.00 $0.00 $0.00 $0.00 $0.00

Option Year 2

Schedule B
NON-PERSONAL SERVICES: Provide all personnel, equipment, tools, materials, supervision, other items and services necessary to perform Floor Covering Installation at Whiteman AFB MO in accordance with the Statement of Work (SOW).
OPTION YEAR 2: 1 SEP 2010 THRU 31 AUG 2011
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
2001PERFORM FURNITURE MOVING
2001AALight Furniture400HR
2001ABHeavy Furniture200HR
2001ACSystems Furniture ( Repair)40HR
2001ADModular Furniture (Repair)40HR$0.00
2002REMOVE AND DISPOSE OF MATERIALS
2002AAGlue-Down Carpet8000SY
2002ABStretched-In Carpet2,500SYF
2002ACCarpet Padding1500SY
2002ADCarpet Tile2500SF
2002AEVinyl Composition Tile12000SF
2002AFSheet Vinyl500SY
2002AGRubber Floor Tile4500SF
2002AHWall Base (Wood, rubber, Vinyl) 4"12000LF
2002AJWall Base (Wood, rubber, Vinyl)6"4000LF
2002AKStair Treads/Nosings500LF
2002ALTransition Strip (Vinyl, Metal)1400LF
2002AMCeramic Tile Underlayment100SF
2002ANCeramic,Porcelain, Tile600SF
2002APR&R Thresholds175EA$0.00
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
2003PERFORM FLOOR COVER INSTALLATION
2003AAGlue-Down Carpet8000SY
2003ABStretched-In Carpet2,500SY
2003ACCarpet Padding1500SY
2003ADCarpet Tile600SF
2003AEVinyl Tile Composition12000SF
2003AFSheet Vinyl250SY
2003AGRubber Floor Tile5000SF
2003AHCeramic,Porcelain, Tile600SF
2003AJEpoxy Poured Floor2500SF$0.00
2004PERFORM INSTALLATION OF FLOOR ACCESSORIES
2004AAWall Base ( Rubber, Vinyl)4"12000LF
2004ABWall Base (Rubber, Vinyl ) 6"4000LF
2004ACWall Base ( Wood with Shoe,(Oak) and Finish800LF
2004ADVinyl Transition750LF
2004AEMetal Transition650LF
2004AFDoor Threshold Plate80EA
2004AGStair Treads/Nosings500LF
2004AHFloor Prep/Patch/Level /Sand1250SF$0.00
2005OTHER FLOOR COVER REQUIREMENTS
2005AAModify/Cut Wood Doors80EA
2005ABCarpet Binding & Serging150LF
2005ACInstall Carpet on Stairs and Steps850EA
2005ADInstall Carpet as Base board1500LF
2005AEInstall Carpet on Stringer250LF
2005AFInstall Carpet as Border, 18" Wide400LF
2005AGInstall Carpet as Border, 24" Wide400LF
2005AHInstall Carpet as Border, 36" Wide300LF
2005AJR&R Toilets22EA
2005AKR&R Floor Telephone & Elec Outlet covers80EA$0.00
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
2006REIMBURSEMENT FOR UNEXPECTED OR SHORT NOTICE CONTRACTOR FURNISHED MATERIALS AND OTHER MISC FLOOR REQUIREMENTS1EaNTE $5,000
Total Option Year 2$

&C&"Arial,Bold"&14

&RFA4625-08-R-0006

Attachment 2 $0.00 $0.00 $0.00 $0.00 $0.00

Option Year 3

Schedule B
NON-PERSONAL SERVICES: Provide all personnel, equipment, tools, materials, supervision, other items and services necessary to perform Floor Covering Installation at Whiteman AFB MO in accordance with the Statement of Work (SOW).
OPTION YEAR 3: 1 SEP 2011 THRU 31 AUG 2012
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
3001PERFORM FURNITURE MOVING
3001AALight Furniture400HR
3001ABHeavy Furniture200HR
3001ACSystems Furniture ( Repair)40HR
3001ADModular Furniture (Repair)40HR$0.00
3002REMOVE AND DISPOSE OF MATERIALS
3002AAGlue-Down Carpet8000SY
3002ABStretched-In Carpet2,500SYF
3002ACCarpet Padding1500SY
3002ADCarpet Tile2500SF
3002AEVinyl Composition Tile12000SF
3002AFSheet Vinyl500SY
3002AGRubber Floor Tile4500SF
3002AHWall Base (Wood, rubber, Vinyl) 4"12000LF
3002AJWall Base (Wood, rubber, Vinyl)6"4000LF
3002AKStair Treads/Nosings500LF
3002ALTransition Strip (Vinyl, Metal)1400LF
3002AMCeramic Tile Underlayment100SF
3002ANCeramic,Porcelain, Tile600SF
3002APR&R Thresholds175EA$0.00
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
3003PERFORM FLOOR COVER INSTALLATION
3003AAGlue-Down Carpet8000SY
3003ABStretched-In Carpet2,500SY
3003ACCarpet Padding1500SY
3003ADCarpet Tile600SF
3003AEVinyl Tile Composition12000SF
3003AFSheet Vinyl250SY
3003AGRubber Floor Tile5000SF
3003AHCeramic,Porcelain, Tile600SF
3003AJEpoxy Poured Floor2500SF$0.00
3004PERFORM INSTALLATION OF FLOOR ACCESSORIES
3004AAWall Base ( Rubber, Vinyl)4"12000LF
3004ABWall Base (Rubber, Vinyl ) 6"4000LF
3004ACWall Base ( Wood with Shoe,(Oak) and Finish800LF
3004ADVinyl Transition750LF
3004AEMetal Transition650LF
3004AFDoor Threshold Plate80EA
3004AGStair Treads/Nosings500LF
3004AHFloor Prep/Patch/Level /Sand1250SF$0.00
3005OTHER FLOOR COVER REQUIREMENTS
3005AAModify/Cut Wood Doors80EA
3005ABCarpet Binding & Serging150LF
3005ACInstall Carpet on Stairs and Steps850EA
3005ADInstall Carpet as Base board1500LF
3005AEInstall Carpet on Stringer250LF
3005AFInstall Carpet as Border, 18" Wide400LF
3005AGInstall Carpet as Border, 24" Wide400LF
3005AHInstall Carpet as Border, 36" Wide300LF
3005AJR&R Toilets22EA
3005AKR&R Floor Telephone & Elec Outlet covers80EA$0.00
CLINSERVICEEST QTYUNITUNIT PRICETOTAL ESTIMATED AMOUNT
3006REIMBURSEMENT FOR UNEXPECTED OR SHORT NOTICE CONTRACTOR FURNISHED MATERIALS AND OTHER MISC FLOOR REQUIREMENTS1EaNTE $5,000
Total Option Year 3$

&C&"Arial,Bold"&14

&RFA4625-08-R-0006

Attachment 2 $0.00 $0.00 $0.00 $0.00 $0.00

Totals

Total Base Year$
Total Option Year 1$
Total Option Year 2$
Total Option Year 3$
Grand Total Base Year and 3 Option Years$
NOTE:
MINIMUM AND MAXIMUMS: There are no minimums and maximums for each
CLIN. There are no minimums or maximums for each year of the contract.
The overall values over the life of the contract are a minimum of $1,000.00
and a maximum of $1,950,000.00.

File details come from the government source that posted it. Updated .