This document contains questions and answers related to a federal contract opportunity for carpet replacement at Bldg 1185 on McConnell Air Force Base. The key details are:

The government will provide floor plans and has confirmed that the cove color should be consistent. Contractors are responsible for moving typical office furniture but not heavy items like large safes. All existing carpet, including in the auditorium, needs to be replaced, and the contractors will be responsible for removing and reinstalling the auditorium seating. The project timeline is 60 days from award to completion, and the government will allow contractors to stage materials and a dumpster on-site. Contractors can use rolled carpet in the auditorium if it matches the carpet tiles used elsewhere. Disposal of the demolished carpet is the contractor's responsibility, and the government will provide a designated staging area inside the building. Overall, this document provides details on the scope of work, logistics, and requirements for the carpet replacement project.

View the file

Other files

File Type Posted
MCCONNELL_1185_1-11x17.pdf PDF
MCCONNELL_1185_2-11x17.pdf PDF
1185 flr plan and SF totals.pdf PDF
1185 - Carpet Pictures.pdf PDF
Solicitation - FA462124Q0076.pdf PDF
Attachment 1 - Carpet Replacement - SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bldg 1185 – Carpet Replacement – Questions

1. Are you able to provide the floor plans? Yes, see attached.

2. Do you want the cove color to be all the same? YES

3. What do we consider heavy furniture regarding moving furniture? Contractors will move furniture such as cubicles, desks, bookshelves, tables and typical office type furniture.

Large safes would be an example of heavy furniture that contractors would not move.

4. Who will be moving the furniture/file cabinets? Contractors

5. Will the wood cove be replaced? If removed, the contractor will remove and reinstall the same wood cove base.

6. Where will the contractors store the furniture? Contractors will determine how materials get on site and staged at the building. Space accommodations may be made to allow for a temporary storage container if contractor chooses to supply one.

7. Rm 239 has a wood board transition that was used to bridge a gap from where a wall was taken down, what is the plan for that? Government will remove transition before the work starts, it will not be replaced.

8. How/where do you want the flooring delivered? Contractor will deliver to B1185

9. Does the stage need to be recarpeted as well? Yes, all current carpet needs to be replaced.

10. Who will remove/put back in the auditorium seating? Contractor is responsible for all furniture.

11. What year was the building built? Is it prior to 1989? Placed in service on December 27,

12. Do you have a preference on storage of material on base or at our warehouse? Contractors will determine how materials get on site and staged at the building. Space accommodations may be made to allow for a temporary storage container if contractor chooses to supply one.

13. Confirmation that it is 60 days from award to completion. Correct, this allows for material acquisition as well as time for project completion.

14. In the auditorium:

a. Is the auditorium seating to be removed? Yes, the seating shall be removed as necessary to install new carpet and then put back in place by contractor after new carpet is installed.

b. Are corner guards required? Contractor is expected to leave a clean and safe professional looking product upon project completion, to include corner guards if necessary.

Bldg 1185 – Carpet Replacement – Questions

c. Is nosing required? Contractor is expected to leave a clean and safe professional looking product upon project completion, to include nosing if necessary.

d. How and what materials are required for steps in the stair area of this space? If the rolled product works better in that space than carpet tiles, the contractor should provide choice for approval. It should be exactly the same or compliment the other carpet being installed.

15. Will the base allow a dump trailer and/ or Dumpster to be on site for the removal of the existing carpet. Yes and a space will be designated as close as possible to the building.

16. Is there any particular sequence you are wanting the areas done in? No, but for efficiency we suggest working in a linear path down the halls.

17. One carpet selection from vendor Engineered Floors was no longer available. CE can note that an approved equal may be selected with something similar from that particular vendor, the contractor has to send us samples for us to see and approve.

18. Will the rooms be empty when work starts? The CORS will work closely with the building occupants to ensure contractors have unobstructed access to workspaces and work to prevent work stoppages and delays to work progress. We will note that the building is an active workspace and in certain situations it may be necessary to make minor accommodations around working staff.

19. Can rolled carpet be used in the auditorium instead of the carpet tiles? Specifically, just for the auditorium, yes rolled carpet can be installed if there is an exact match available for the carpet tiles being installed in the rest of the building.

20. Can contractors utilize government dumpsters to dispose of the demolished carpet? No, contractors shall procure and stage a dumpster or means of disposal for the demo waste.

21. How are the materials to be staged or delivered? Contractors will determine how materials get on site and staged at the building. Space accommodations may be made to allow for a temporary storage container if contractor chooses to supply one. A space inside the building will be designated for storing at least 4 pallets of material and possibly more.

22. Are there pictures of a typical office, and the auditorium that can be provided for bidding purposes. Is there on-site storage and what is the distance of that storage for all office furniture, auditorium seating in relation to the work being performed? If it is on a separate floor, what is the elevator access like in terms of traffic, and if it is busy, can furniture movement happen after hours? Yes, pictures of the site are provided, a room inside the building will be designated for staging/storing material of at least 4 pallets worth and possibly more, there is a passenger elevator in the building available for use and the elevator traffic/use is very minimal leaving minimal reason to move anything after hours.

23. Can you please explain the following statement from your SOW: "Installation will be managed by local installers". Did the AF contract a local carpet installer for project oversight? The contract awardee will be the installers for the project. Contracting Officer Representatives (COR) will work daily to maintain project oversight with the onsite installation team project manager. The COR will be the first point of contact for all on site coordination efforts and address any concerns with the building staff from project start to finish.