This document is a Statement of Need (SON) for a 3kW fiber laser to replace an existing CNC plasma machine at the 22nd ARW Innovation Lab at McConnell AFB, Kansas.
The SON specifies that the contractor shall provide an enclosed 3kW fiber laser with a minimum working space of 48in x 48in, 3-axis (X,Y,Z) operation, and Wi-Fi capabilities. The unit must include a machine-mounted monitor connected to a Windows computer with CYP-CUT laser interface pre-installed. The contractor shall provide a minimum 1-year warranty covering all parts, including the fiber laser source. Delivery is required within 120 days of award, and the contractor shall complete installation, setup, and on-site training for machine safety, setup, and basic software functions. The related federal contract opportunity, solicitation number FA462124Q0036, is for the procurement of this 3kW fiber laser system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA462124Q0036- Fiber Laser - Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04 June 2024
Statement of Need
3kw Fiber Laser
McConnell AFB, Kansas
1. Overview
1.1 The 22nd ARW Innovation Lab is need of an enclosed fiber laser to replace the CNC plasma machine that has been processed through DRMO.
2. Description
2.1 The contractor shall provide a 3kw fiber laser that is fully enclosed with a minimum working space of 48in x 48in. The unit needs to have 3 axis (X,Y and Z axis) operation along with Wi-Fi capabilities. There will be a machine mounted monitor connected to Windows computer with CYP-CUT laser interface pre-installed.
3. Warranty
3.1 The contractor shall provide a minimum of 1 year warranty on all parts to include the fiber laser source. Any defect not caused by government damage or misuse will be repaired/replaced by the contractor at no cost to the government.
4. Delivery
4.1 The contractor shall complete delivery of each line item no later than 120 days from date of award.
5. Installation
5.1 The contractor shall complete installation and setup of the fiber laser after all the equipment has been moved to the final location inside the Innovation Lab. The contractor shall ensure that the fiber laser system is fully functional. The contractor shall remove any packing materials after installation is complete.
5.2 The contractor will provide on-site training that includes machine safety, set-up and basic software function.