SOW_Kitchen_Equip_Install_V2.pdf

PDF 21 KB Posted

Attached to
Kitchen Equipment Installation Federal contract opportunity
Solicitation number
FA462019QA313
Issued by
Department of the Air Force Air Mobility Command

About this file

SOW - V2

View the file

Other files for this federal contract opportunity

Other files attached to Kitchen Equipment Installation, newest first.
File Type Posted
FA462019QA313_Amendment_02.pdf PDF
FA462019QA313_Amendment_01.pdf PDF
Attachment_1-_SOW.pdf PDF
Attachment_3_-_Appliance_Listing.pdf PDF
Attachment_2_-_WDOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK - V2

RMC APF KITCHEN EQUIPMENT INSTALL

Building 2452, 7 W Ent St, Fairchild AFB, WA 99011

1. DESCRIPTION OF SERVICES. Vendor shall install the government furnished items listed in Table 1 into the kitchen in bldg. 2452 as shown on the floor plan.

2. SCOPE OF WORK. Contractor shall install all items listed in Table 1. Items will be transported to site by government but vendor will be required to unpack items, remove shipping materials, move inside facility, place items according to floor plan, and install according to manufacture requirements and all state/federal laws and applicable electrical codes.

a. Government is only providing equipment listed below. Vendor is responsible for all additional supplies and material to hook equipment into utilities

b. Equipment must be installed according to manufacturer specifications.

c. Contractor is responsible for properly disposing of packing material. Cardboard may be recycled at the base Recycle Center. All other material shall be properly disposed of off Fairchild.

TABLE 1

Condition Location on Floor Plan

Quantity Item Brand Model #

In original packaging on pallet (purchased in 2014)

IM-E 1 ICE MAKER with ICE

STORAGE BIN

Scotsman Scotsman -

C1448MA-32B

In original packaging on pallet (purchased in 2014)

HC 1 HEATED HOLDING &

PROOFING CABINET

Victory HS-1D-1-PT- 115V

In original packaging on pallet (purchased in 2014)

COS 2 ELECT. BOILERLESS

COMBI OVEN

STEAMER

Rational SCC WE 62 (2 Ovens Stacked)

In original packaging on pallet (purchased in 2014)

ECO 1 ELECTRIC COMBI

OVEN

Rational SCC WE 202

In original packaging on pallet (purchased in 2014)

FRG 1 REACH-IN

REFRIGERATOR

Arctic Air AR49E

Used PS-E 1 2-BASIN PREP SINK

(SALVAGED)

Eagle Group

FN2840-2-24-

14/3

3. GENERAL INFORMATION: Hours of when work can be performed are Mon-Fri 0730 to 1630, excluding Holidays and Weekends.

4. PERFORMANCE PERIOD: Project shall not exceed 45 days after government Notice to Proceed. The notice to proceed should be issued on or about 15 June.

5. APPENDICES

Appendix A: Construction Floor Plan Appendix B-J: Product Information

Used FRZ 1 REACH-IN FREEZER

(SALVAGED)

Traulsen RDT232NUT-

HHS

Used FRG-E &

FRZ-E

2 ROLL-IN

REFRIGERATOR

(SALVAGED)

Traulsen RR1232LUT-

FHS

Used S1NK3-E 1 3-BASIN SINK w/

SIDEBOARDS

(SALVAGED)

Eagle Group

314-16-3-24

File details come from the government source that posted it.