Attachment 1 SOW

View the file

Other files

File Type Posted
Amendment_1_SF30.pdf PDF
FA462019QA208_RMC_Storage_System.pdf PDF
SOW_Appendix_A_100_Percent_Drawings_Storage_Area.pdf PDF
SOW_Appendices_B_and_C.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) For

High Density Mobile Storage Solution, Building 2452 Fairchild AFB, WA

1. DESCRIPTION OF SERVICE: The contractor shall provide High Density Movable Carriage Storage Shelving System will be an integrated assembly of independent mobile rows. Rows of shelving shall be mounted on mobile carriages that travel along a track such that all rows shall be packed together tightly and an aisle can be created between rows by moving the carriages from side to side. Mobile rows can be moved by means of a mechanical assist system.

2. SCOPE OF WORK: The Contractor shall complete all work, which includes furnishing all supervision, labor, material, equipment and services, unless otherwise specified herein, required under this contract. All work shall be performed in accordance with all Federal, State, local laws and regulations, manufacturer’s recommendations and this Statement of Work (SOW).

- Install high density mobile storage solution to maximize storage space in Rm 118 of building 2452

- Area for racking is 404” wide by 228” deep, rack and mounted rail system should use entire width and rack length should take up as much depth as is allowable in the space. (See Appendices A&B)

3. SALIENT CHARACTERISTICS

- Racks should be 48” +/-2” width and be able to move having access to both sides of the rack.

-System should have a total of 7 racks.

-Rack length should be the maximum length allowable in the 228” space (acceptable range 224” to 226”)

- System will be movable along a surface mounted rail system.

- Mechanical assistance for moving of racks will be built into system, no electrical assist systems will be allowed.

-Mechanical assistance element must be positioned on rack system in a location that makes it readily accessible by the user.

- Total Rack height will not exceed 10’

- ~24” shelf spacing to allow for 4 shelves within rack. (See Appendix C)

- Weight limit 2000 lbs per rack minimum with minimum limit of 500 lbs per shelf

4. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with Contracting Officer.

Federal Holidays:

January 1 New Years Day 3rd Monday in January Martin Luther King Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas

5. WORK AREA: The contractor shall at all times, keep work areas free from any accumulation of debris, waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job, RFQ FA462019QA208 (RMC Storage System) Attachment 1 or when away from the work site, the contractor shall leave the work area and its premises in a clean, neat, safe and workmanlike condition. The contractor is responsible for removal and proper disposal of all job related waste material at a permitted site.

6. PERFORMANCE PERIOD: Project shall not exceed 30 days after contract award. Delivered and installed NLT 1 August 2019

7. APPENDICES:

Appendix A: Site Floor Plan Appendix B: Layout within Equipment Storage Area Appendix C: Rack Configuration