Attachment_2_-_Price_Workbook.XLSX

XLSX spreadsheet 43 KB Posted

Attached to
Direct Procurement Method (Schedule III Only) Federal contract opportunity
Solicitation number
FA462019QA008
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 2 - Price Workbook

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year (0001)

ESTIMATED QUANTITIESSCHEDULE III ONLY
(BASIC YEAR 01 JAN 2019 TO 31 DEC 2019)
CLIN 0001
The quantities shown by area of performance for each item in this Solicitation are the Government’s
estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State,
and local holidays are listed below by area of performance within each schedule. Bidders must complete
the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum
acceptable daily capability, for all items within an area of performance for which they submit bids.
Failure to do so will render the bid non responsive.
Government's Est. MaximumGov. MinimumBidder's Guaranteed
Daily RequirementAcceptable DailyDaily Capability
AREA 1: Zone 50 Benewah, Bonner, Boundary, Kootenai, Lath, Shoshone

Capability

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)200N/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 2: Zone 51 Clearwater, Idaho, Lewis

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 3: Zone 52 Nez Perce

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 4: Zone 89 Whitman, Adams, Stevens,Pend Oreille, Spokane, Lincoln

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 5: Zone 90 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 6: Zone 91 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180
SCHEDULE III
INTRA-CITY AND INTRA-AREA MOVES
Item 0031. Complete Service for Intra-City and Intra-Area Moves. Service must include a premove survey, servicing of appliances,
packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying,
loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as
directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials
from residence.
Area........1................Est Annual QtyUnitUnit PriceTotal
0NCWT$0.00
Area….....2.................
0NCWT$0.00
Area........3...............
0NCWT$0.00
Area........4..............
740NCWT$0.00
Area........5...............
0NCWT$0.00
Area........6................
0NCWT$0.00
Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee’s residence
is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s
notification, the contracting officer (a) cannot locate the member/emploee within 30 minutes, (b) cannot have the member/employee at the
residence within one hour after notification, and © the contractor left a notice of atempted pickup or delivery at the residence
Area.1,2,3,4,5,6..........Est Annual QuantityUnitUnit PriceUnit Total
AA. Attempted Pickup1ea shpmt$0.00
AB. Attempted Delivery1ea shpmt$0.00
Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the
contract area of performance, not to exceed 50 miles. Mileage must be computed on the shortest highway distance
commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.
Area.1,2,3,4,5,6..Estimated Annual QuantityUnitUnit PriceUnit Total
2Per loaded mile$0.00
Note: All above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Total$0.00

1ST OPTION YEAR (1001)

ESTIMATED QUANTITIESSCHEDULE III ONLY
(1st OPTION YEAR 01 JAN 2020 TO 31 DEC 2020)
CLIN 1001
The quantities shown by area of performance for each item in this Solicitation are the Government’s
estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State,
and local holidays are listed below by area of performance within each schedule. Bidders must complete
the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum
acceptable daily capability, for all items within an area of performance for which they submit bids.
Failure to do so will render the bid non responsive.
Government's Est. MaximumGov. MinimumBidder's Guaranteed
Daily RequirementAcceptable DailyDaily Capability
AREA 1: Zone 50 Benewah, Bonner, Boundary, Kootenai, Lath, Shoshone

Capability

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 2: Zone 51 Clearwater, Idaho, Lewis

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 3: Zone 52 Nez Perce

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 4: Zone 89 Whitman, Adams, Stevens,Pend Oreille, Spokane, Lincoln

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 5: Zone 90 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 6: Zone 91 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180
SCHEDULE III
INTRA-CITY AND INTRA-AREA MOVES
Item 0031. Complete Service for Intra-City and Intra-Area Moves. Service must include a premove survey, servicing of appliances,
packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying,
loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as
directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials
from residence.
Area........1................Est Annual QtyUnitUnit PriceTotal
0NCWT$0.00
Area….....2.................
0NCWT$0.00
Area........3...............
0NCWT$0.00
Area........4..............
740NCWT$0.00
Area........5...............
0NCWT$0.00
Area........6................
0NCWT$0.00
Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee’s residence
is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s
notification, the contracting officer (a) cannot locate the member/emploee within 30 minutes, (b) cannot have the member/employee at the
residence within one hour after notification, and © the contractor left a notice of atempted pickup or delivery at the residence
Area.1,2,3,4,5,6..........Est Annual QuantityUnitUnit PriceUnit Total
AA. Attempted Pickup1ea shpmt$0.00
AB. Attempted Delivery1ea shpmt$0.00
Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the
contract area of performance, not to exceed 50 miles. Mileage must be computed on the shortest highway distance
commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.
Area.1,2,3,4,5,6..Estimated Annual QuantityUnitUnit PriceUnit Total
2Per loaded mile$0.00
Note: All above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Total$0.00

2ND OPTION YEAR (2001)

ESTIMATED QUANTITIESSCHEDULE III ONLY
(2nd Option YEAR 01 JAN 2021 TO 31 DEC 2021)
CLIN 2001
The quantities shown by area of performance for each item in this Solicitation are the Government’s
estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State,
and local holidays are listed below by area of performance within each schedule. Bidders must complete
the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum
acceptable daily capability, for all items within an area of performance for which they submit bids.
Failure to do so will render the bid non responsive.
Government's Est. MaximumGov. MinimumBidder's Guaranteed
Daily RequirementAcceptable DailyDaily Capability
AREA 1: Zone 50 Benewah, Bonner, Boundary, Kootenai, Lath, Shoshone

Capability

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 2: Zone 51 Clearwater, Idaho, Lewis

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 3: Zone 52 Nez Perce

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 4: Zone 89 Whitman, Adams, Stevens,Pend Oreille, Spokane, Lincoln

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 5: Zone 90 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 6: Zone 91 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180
SCHEDULE III
INTRA-CITY AND INTRA-AREA MOVES
Item 0031. Complete Service for Intra-City and Intra-Area Moves. Service must include a premove survey, servicing of appliances,
packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying,
loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as
directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials
from residence.
Area........1................Est Annual QtyUnitUnit PriceTotal
0NCWT$0.00
Area….....2.................
0NCWT$0.00
Area........3...............
0NCWT$0.00
Area........4..............
740NCWT$0.00
Area........5...............
0NCWT$0.00
Area........6................
0NCWT$0.00
Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee’s residence
is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s
notification, the contracting officer (a) cannot locate the member/emploee within 30 minutes, (b) cannot have the member/employee at the
residence within one hour after notification, and © the contractor left a notice of atempted pickup or delivery at the residence
Area.1,2,3,4,5,6..........Est Annual QuantityUnitUnit PriceUnit Total
AA. Attempted Pickup1ea shpmt$0.00
AB. Attempted Delivery1ea shpmt$0.00
Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the
contract area of performance, not to exceed 50 miles. Mileage must be computed on the shortest highway distance
commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.
Area.1,2,3,4,5,6..Estimated Annual QuantityUnitUnit PriceUnit Total
2Per loaded mile$0.00
Note: All above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Total$0.00

3RD OPTION YEAR (3001)

ESTIMATED QUANTITIESSCHEDULE III ONLY
(3rd Option YEAR 01 JAN 2021 TO 31 DEC 2021)
CLIN 3001
The quantities shown by area of performance for each item in this Solicitation are the Government’s
estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State,
and local holidays are listed below by area of performance within each schedule. Bidders must complete
the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum
acceptable daily capability, for all items within an area of performance for which they submit bids.
Failure to do so will render the bid non responsive.
Government's Est. MaximumGov. MinimumBidder's Guaranteed
Daily RequirementAcceptable DailyDaily Capability
AREA 1: Zone 50 Benewah, Bonner, Boundary, Kootenai, Lath, Shoshone

Capability

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 2: Zone 51 Clearwater, Idaho, Lewis

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 3: Zone 52 Nez Perce

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 4: Zone 89 Whitman, Adams, Stevens,Pend Oreille, Spokane, Lincoln

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 5: Zone 90 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 6: Zone 91 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180
SCHEDULE III
INTRA-CITY AND INTRA-AREA MOVES
Item 0031. Complete Service for Intra-City and Intra-Area Moves. Service must include a premove survey, servicing of appliances,
packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying,
loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as
directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials
from residence.
Area........1................Est Annual QtyUnitUnit PriceTotal
0NCWT$0.00
Area….....2.................
0NCWT$0.00
Area........3...............
0NCWT$0.00
Area........4..............
740NCWT$0.00
Area........5...............
0NCWT$0.00
Area........6................
0NCWT$0.00
Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee’s residence
is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s
notification, the contracting officer (a) cannot locate the member/emploee within 30 minutes, (b) cannot have the member/employee at the
residence within one hour after notification, and © the contractor left a notice of atempted pickup or delivery at the residence
Area.1,2,3,4,5,6..........Est Annual QuantityUnitUnit PriceUnit Total
AA. Attempted Pickup1ea shpmt$0.00
AB. Attempted Delivery1ea shpmt$0.00
Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the
contract area of performance, not to exceed 50 miles. Mileage must be computed on the shortest highway distance
commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.
Area.1,2,3,4,5,6..Estimated Annual QuantityUnitUnit PriceUnit Total
2Per loaded mile$0.00
Note: All above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Total$0.00

4TH OPTION YEAR (CLIN 4001)

ESTIMATED QUANTITIESSCHEDULE III ONLY
(4th Option YEAR 01 JAN 2023 TO 31 DEC 2023)
CLIN 4001
The quantities shown by area of performance for each item in this Solicitation are the Government’s
estimates of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State,
and local holidays are listed below by area of performance within each schedule. Bidders must complete
the “Bidder's Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum
acceptable daily capability, for all items within an area of performance for which they submit bids.
Failure to do so will render the bid non responsive.
Government's Est. MaximumGov. MinimumBidder's Guaranteed
Daily RequirementAcceptable DailyDaily Capability
AREA 1: Zone 50 Benewah, Bonner, Boundary, Kootenai, Lath, Shoshone

Capability

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 2: Zone 51 Clearwater, Idaho, Lewis

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 3: Zone 52 Nez Perce

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/A270N/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 4: Zone 89 Whitman, Adams, Stevens,Pend Oreille, Spokane, Lincoln

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 5: Zone 90 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180

AREA 6: Zone 91 Franklin, Columbia, Garfield, Asotin, Grant, Ferry, Douglas

OUTBOUNDNCWTNCWTNCWT
(Schedule I)N/AN/AN/A
INBOUNDNCWTNCWTNCWT
(Schedule II)N/AN/AN/A
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)200180
SCHEDULE III
INTRA-CITY AND INTRA-AREA MOVES
Item 0031. Complete Service for Intra-City and Intra-Area Moves. Service must include a premove survey, servicing of appliances,
packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying,
loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as
directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials
from residence.
Area........1................Est Annual QtyUnitUnit PriceTotal
0NCWT$0.00
Area….....2.................
0NCWT$0.00
Area........3...............
0NCWT$0.00
Area........4..............
740NCWT$0.00
Area........5...............
0NCWT$0.00
Area........6................
0NCWT$0.00
Item 0032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee’s residence
is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s
notification, the contracting officer (a) cannot locate the member/emploee within 30 minutes, (b) cannot have the member/employee at the
residence within one hour after notification, and © the contractor left a notice of atempted pickup or delivery at the residence
Area.1,2,3,4,5,6..........Est Annual QuantityUnitUnit PriceUnit Total
AA. Attempted Pickup1ea shpmt$0.00
AB. Attempted Delivery1ea shpmt$0.00
Item 0033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the
contract area of performance, not to exceed 50 miles. Mileage must be computed on the shortest highway distance
commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.
Area.1,2,3,4,5,6..Estimated Annual QuantityUnitUnit PriceUnit Total
2Per loaded mile$0.00
Note: All above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Schedule Total-Area ................ $..........$0.00
Total$0.00

Totals Basic (CLIN 0001) 1st Option (CLIN 1001) 2nd Option (CLIN 2001) 3rd Option (CLIN 3001) 4th Option (CLIN 4001) TOTALS (5 Year)

Schedule III
Area1$0.00$0.00$0.00$0.00$0.00$0.00
Area2$0.00$0.00$0.00$0.00$0.00$0.00
Area3$0.00$0.00$0.00$0.00$0.00$0.00
Area4$0.00$0.00$0.00$0.00$0.00$0.00
Area5$0.00$0.00$0.00$0.00$0.00$0.00
Area6$0.00$0.00$0.00$0.00$0.00$0.00
Schedule III TOTALS$0.00$0.00$0.00$0.00$0.00$0.00
TEP
SCHEDULE III 5 YEARS
Schedule I & II Totals$0.00$0.00$0.00$0.00$0.00$0.00
TEP

File details come from the government source that posted it.