SOW_bldgs_1255_1256__2135_Final.pdf
PDF 82 KB Posted
- Attached to
- Roof Repair
- Solicitation number
- FA4620-14-T-A173
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice_of_Award.doc | DOC document | |
| Attachment_A_Bldg_1255.pdf | ||
| Building_2135_PMEL_Roof_Depressions.pdf | ||
| Attachment_C_Bldg_2135.pdf | ||
| Roof_flashing_1255.jpg | JPG image | |
| Attch_2_Standard_Commercial_Warranty_Clause_Insert.pdf | ||
| Attachment_B_Bldg_1256.pdf | ||
| WD_05-2565_(Rev.-14)_dated_05_Aug_14_for_PD2.pdf | ||
| FA4620-14-T-A173_Repair_Roofs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) for
Repair Roof Bldgs 1255, 1256, & 2135
1. DESCRIPTION OF SERVICES. Contractor shall provide all labor and tools to repair the roofs of buildings 1255, 1256, and 2135 IAW manufacturer procedures, industry and commercial standard practices, state and federal laws and regulations and the base design standards.
2. SCOPE OF WORK:
A. Building 1255:
The existing drip flashing along both sides of the roof ridge shall remain and a counter flashing installed under the standing rib roof metal with new, coated sheet metal drip flashing, closely matching the brown paint color of the existing standing seam metal roof panels. The flashing should be hemmed on the exposed edges (see Attachment A).
All panel seams and flashings must be tight and flush to the greatest extent possible. Caulking is required, the counter flashing can be riveted or screwed to the exiting flashing, however, only 50% of the flashing should be caulked in order to let the roof breathe.
B. Building 1256:
Re-seal around all roof safety anchors and roof penetrations with new Poly-Butyl tape, Poly-Butyl sealants and elastomeric sealants to match existing roof color.
Install a new fastener 1 size larger per industry standards to ensure a water tight seal for all of the existing fasteners. All metal seam gasket/seals will be replaced and will be sealed. Remove the existing sealant and trim metal. Water block shall be installed to prevent water from backing up at the bottom of all valleys. A metal target shall also be installed as needed to extend the bottom of the valleys. All metal will be properly fastened and sealed according to the manufactures specifications.
All penetrations will be sealed with Poly-Butyl cover strip and color tinted elastomeric to prevent further leaking (see Attachment B).
C. Building 2135:
Mechanically fasten an Expanded Polystyrene System (EPS) cricket system at eight locations to properly divert the water to the leading edge (see Attachment C).
Install new EPDM elastomer over the cricket area and properly seal to the existing EPDM with 3" seam tape.
Install new 3" brown edge metal and seal with 6" cover strip at the repair areas.
3. PERFORMANCE PERIOD. Upon contract award, the performance period shall not exceed 90 calendar days.
4. SCHEDULING OF WORK AND ACCESS:
(1) The Contractor shall work during normal operating hours of 7:00 AM – 5:00 PM, Monday through Friday, excluding Federal holidays. Access to the interior of the facility will have to be coordinated through building Facility Managers. If the Contractor wants to work other than normal operating hours, approval from the Contracting Officer must be obtained via a written request submitted at least one week prior to the date the work is to occur. The following federal holidays are observed:
January 1 New Year’s Day rd
Monday in January Martin Luther King, Jr. Day rd
Monday in February President’s Day
Last Monday in May Memorial Day
July 4 Independence Day st Monday in September Labor Day nd
Monday in October Columbus Day
November 11 Veterans Day th Thursday in November Thanksgiving Day
December 25 Christmas
(2) Access through the base entry gates may be delayed due to heavy vehicular traffic, exercises, or real-world emergencies.
(3) The Contractor shall not block entry doors during the course of their work, and shall not park in Reserved Parking spaces.
5. Damage to Government Property.
The contractor shall ensure no damages are made to government property and or land. In the event such damages occur, property, trees, buildings, houses, utilities, equipment, or materials, or to privately-owned property, it shall be immediately reported to the POC or available Government representative. All damages caused by the Contractor shall be the responsibility of the contractor to repair at no additional cost.
6. Government Furnished Property and Services: The government shall furnish site access, restroom facilities, building electrical power, security police, and fire protection. In the event of an emergency, dial 911.
7. SOW ATTACHMENTS
Attachment A - Building 1255 As-Built Drawings
Attachment B - Building 1256 As-Built Drawings
Attachment C - Building 2135 As-Built Drawings