This is an amendment to add the site visit questions and answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation SERE VTC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXCEPTION OF SF 30, APPROVED BY NARS 5/79
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF
PAGES
1 | 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
20 July 2010
4. REQUISITION/PURCHASE REQ. NO.
SEE SCHEDULE
5. PROJECT NO. (If applicable)
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
92nd Contracting Sq/LGCA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (√) 9A. AMENDMENT OF SOLICITATION NO.
X
FA4620-10-Q-A051
9B. DATED (SEE ITEM 11)
12 July 2010
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [X] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _ _1_____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(√) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _1 _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to add the site visit questions and answers
A copy of this amendment must be signed and returned with the contractor’s proposal.
Please remember to complete Blocks 8 and 15 of this amendment Contact SSgt John Lam Ho at 509-247-2235 (john.lamho@fairchild.af.mil) if you have any questions Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
SERE VTC System Site Visit Questions
1. Does the contractor have to maintain the system after the one year standard warranty?
Answer: No
2. Does the contractor integrate the new VTC system with existing sound system and media players?
Answer: Yes
3. Does the contractor provide connection to PC with the VTC?
Answer: Yes
4. Does the contractor provide additional inputs to LCD's, other than VTC?
Answer: Yes
5. Are the 42" LCD's consumer or commercial grade?
Answer: Consumer
6. Can the wires to the LCD TVs be fed through the wall or the exterior in wire channel?
Answer: It can be fed through the wall or external wire channel, no wires to the LCD TVs shall be exposed
7. Can the LCD TVs be mounted on the external wall?
Answer: Yes
8. Where does the contractor move the old equipment? Same building? Alternate location?
Answer: It will be directed by VTC personnel at the location
9. Does the existing VTC system have a touch screen controller?
Answer: No, it has a small push button keyboard that controls the camera and has menus
10. What is the Base Design Standard?
Answer: It is specific building codes for Fairchild AFB, because it is different from base to base with climate, location and other factors
11. Does the VTC system need to provide secure and non-secure connections?
Answer: The VTC system does not need a secure connection