Performance Work Statement Summary: Air Compressor Audit Services
This is a Performance Work Statement for comprehensive air compressor and dryer system audit services at F.E. Warren Air Force Base, Wyoming. The contractor shall provide all labor, equipment, tools, and supplies necessary to conduct a temporary compressed air system audit in Building 1235, Room 11 (East Side Mechanical Room). The audit addresses nonoperational Sullair air compressor (Model L816-60 H/AC) and dryer unit (Model SR250) equipment that currently supports 22 drop lines across seven vehicle and equipment maintenance bays operated by the 790th Maintenance Squadron and 90th Missile Maintenance Squadron. The temporary system must operate continuously for a minimum of seven and maximum of fourteen consecutive calendar days during peak maintenance shifts to capture maximum flow demands and pressure data. The contractor shall measure flow rates (CFM) and pressure profiles (PSI) under active working conditions, deliver data-driven specifications for permanent replacement equipment, and provide a safety/feasibility assessment of existing piping for future high-pressure operations at 175–200 PSI.
The contractor must furnish a turnkey temporary operational compressed air system with all necessary diagnostics and instrumentation, verify available electrical/mechanical hookups or provide self-powered equipment with fuel and spill containment. Upon audit completion, the contractor shall remove all temporary equipment but retain piping modifications, tee-connections, isolation valves, flanges, and electrical disconnect points as Government property, safely capped and labeled. Prior to departure, the contractor must pressure test and certify all left-behind infrastructure to verify it is rated for 175–200 PSI operations. The contractor is responsible for any damage to Government property at no additional cost and shall restore the mechanical room to pre-test conditions. The comprehensive air audit and feasibility report must be delivered within 14 calendar days after equipment removal. Normal working hours are Monday–Friday, 0700–1600 hrs. The contractor must comply with federal, state, and local environmental, safety, security, and ASME/OSHA standards, obtain base access credentials with REAL ID-compliant identification, and follow Controlled Unclassified Information (CUI) safeguarding requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT FOR
AIR COMPRESSOR AUDIT SERVICES
F.E. Warren Air Force Base, Wyoming
15 July 2026
Table of Contents
1. Description of Services
1.1. Overview of Services
1.2. Basic Services
1.3. Background & Technical Environment
1.4. Objectives
1.5. Contractor Responsibilities
2. Services Summary
3. Government Furnished Property and/or Services
3.1. Government Furnished Property
3.2. Government Furnished Services
3.3. Government Property Incidental to the Place of Performance
4. General Information
4.1. Quality Control
4.2. Quality Assurance
4.3. Security Requirements
4.4. Physical Security
4.5. Operational Security (OPSEC)
4.6. Anti-Terrorism
4.7. Location/Hours of Operation
4.8. Conservation of Utilities
4.9. Environmental Controls
4.10. Safety Requirements
4.11. Privatized Utility Systems
4.12. Continuation of Essential DoD Contractor Services During Crisis
4.13. Contractor Personnel
4.14. Records
4.15. Controlled Unclassified Information (CUI)
5. Appendices
APPENDIX A – Publications/Instructions
APPENDIX B – Deliverables
1. Description of Services.
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform Air Compressor and Dryer System Audit Services at Building 1235, F.E. Warren Air Force Base, Wyoming, in accordance with all applicable federal, state, local laws and regulations and this performance work statement
(PWS).
1.1. Overview of Services. This is a service contract to conduct a comprehensive compressed air system audit and analysis in Building 1235, Room 11 (East Side Mechanical Room) at F.E. Warren AFB, WY. The facility's primary air compressor and dryer units are currently nonoperational (INOP). The Contractor shall provide a temporary, operational compressed air source (compressor and dryer package) to support facility operations during the testing window, collect real-time flow and pressure data, and deliver a data-driven engineering recommendation for a permanent, code-compliant replacement system. Vendor certification requirements shall comply with City, State, and Federal ASME Code and OSHA standards / requirements as necessary.
1.2. Basic Services.
The Contractor shall provide a turnkey, temporary operational compressed air system to temporarily power the facility's air distribution lines, and install all necessary diagnostics and instrumentation to measure system demand (PSI and CFM).
1.2.1. Audit Window: The Contractor's temporary compressed air system and data logging equipment shall operate continuously for a minimum of seven (7) consecutive calendar days and a maximum of fourteen (14) consecutive calendar days.
1.2.2. Operational Alignment: The audit must run during peak maintenance shifts for the vehicle bays to capture maximum flow demands and pressure drops.
1.2.3. System Removal: Upon completion of the audit window, the Contractor shall isolate, shut down, and remove all temporary compressor, dryer, and diagnostic systems, returning the mechanical room to its pre-test state.
1.3. Background & Technical Environment.
The current permanently installed Sullair Air Compressor (Model L816-60 H/AC) and Sullair Dryer Unit (Model
SR250) are nonoperational.
1.3.1. Facility Demand: The compressed air system supports twenty-two (22) drop lines across seven (7) vehicle and equipment maintenance bays operated by the 790th Maintenance Squadron (790 MXS) and the
90th Missile Maintenance Squadron (90th MMXS).
1.3.2. Future Target Requirements: While current drop line fixtures are rated for 135 PSI max, impending mission upgrades require the future replacement system to support 175–200 PSI. The contractor's temporary system must safely pressurize the lines to establish a baseline, and the final report must evaluate the feasibility of upgrading the current distribution lines to 200 PSI.
1.4. Objectives.
1.4.1. Restore Temporary Capabilities: Provide temporary compressed air utility support to allow the 790
MXS and 90 MMXS vehicle bays to operate normally during the audit window.
1.4.2. Data Collection & Analysis: Measure and log flow rates (CFM) and pressure profiles (PSI) under active working conditions.
1.4.3. Engineering Sizing & Feasibility Study: Deliver data-driven specifications for the permanent replacement compressor and dryer, alongside a safety/suitability analysis of the existing piping for future high-pressure (175-200 PSI) operations within 14 calendar days after testing equipment removal.
1.5. Contractor Responsibilities.
The Contractor shall furnish all labor, temporary equipment, fuel/power connections, tools, diagnostic instruments, and transportation required to execute the temporary utility support and air audit.
1.5.1. Power and Hookups: The Contractor is responsible for verifying available electrical/mechanical hookups in Building 1235 or providing their own self-powered (e.g., diesel-driven) temporary compressor units, including fuel and spill containment.
1.5.2. Site Restoration and Infrastructure Handover: Upon completion of the air audit, the Contractor shall isolate, shut down, and remove all temporary compressor, dryer, and diagnostic systems.
1.5.2.1 Infrastructure to Remain: Any piping modifications, tee-connections, isolation valves, flanges, or electrical disconnect points installed by the Contractor to facilitate the connection of the temporary system shall not be removed. These modifications shall remain in place as Government property, safely capped, sealed, and labeled to support the future installation of permanent replacement equipment.
1.5.2.2. Pressure Testing and Certification: Prior to contract completion and equipment departure, the
Contractor shall pressure test and certify all left-behind piping modifications and connections. The test must verify that the infrastructure is structurally sound and rated to safely handle the future target operating pressure of 175–200 PSI.
1.5.2.3. Cleanup and Debris: The Contractor shall remove all temporary hoses, loose fittings, packaging materials, and waste fluids. The Contractor shall clean and restore all other areas of the mechanical room to their original pre-test conditions.
1.5.3. Liability and Damage Reporting: The Contractor shall repair or replace any Government property, equipment, utilities, or facility structures damaged as a result of performance on this service, including installing, operating, or removing the temporary utility equipment and diagnostic loggers, at no additional cost to the Government.
1.5.3.1. Immediate Notification: In the event of any contractor-caused damage, the Contractor shall immediately provide verbal notification to the Contracting Officer and the Facility Manager (within two (2) hours of the incident).
1.5.3.2. Initial Damage Assessment: The Contractor shall submit an initial written assessment detailing the extent of the damage, the proposed corrective action plan, and the repair schedule to the Contracting Officer within twenty-four (24) hours of the incident. All repairs must be performed by licensed professionals and approved by the Government prior to the start of any repair work.
1.5.3.3. Final Repair & Deliverable Submission: Upon completion of approved repairs, the Contractor shall restore the facility to its original pre-test state and submit a formal, written Contractor-Caused Damage Report to the CO within five (5) calendar days of completed repairs. This report shall include photographs of the original damage, photographs of the completed repairs, a summary of materials used, and a written sign-off from the Base Civil Engineering (BCE) or the Facility Manager verifying that the repairs were executed to Air
Force and industry standards.
2. Services Summary.
The contractor service delivery requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs. For the Performance Objective to be met, service delivery must be in substantial compliance with applicable performance standards. The Performance Threshold describes the minimum overall levels of service delivery required for acceptable quality control. Failure to meet these Performance Thresholds means that contractor Quality Control is unacceptable. The following is a list of the key performance objectives that will be verified as contractually compliant by Government personnel; however, inspection of any contract requirement is authorized.
Performance Objective PWS Para.
Performance Threshold Method of Surveillance
SS-1: Provide and Maintain Temporary Operational Compressed Air System
1.1, 1.2, 1.4.1
100% Availability during scheduled vehicle maintenance shifts. Zero
(0) unexcused system downtime hours. Temporary compressor must safely provide required PSI/CFM to allow vehicle bays to operate normally.
100% Inspection / Customer Feedback
SS-2: Execute Air Audit Within Mandatory Timeframe
1.2.1 Data collection must run
continuously for a minimum of seven (7) consecutive calendar days and a maximum of fourteen
(14) consecutive calendar days during peak maintenance shifts.
Periodic Surveillance (verification of logger installation dates, active operations, and removal dates).
SS-3: Deliver Comprehensive Air Audit & Feasibility Report
1.3.2, 1.4.3, 1.5
100% Compliance with technical requirements. Report must include: demand profiles (PSI/CFM), data-driven specifications for the replacement compressor/dryer, and a safety/feasibility assessment of the existing pipes for 175–200 PSI operations. Deliverable must be submitted within the specified timeframe (e.g., 14 days post-audit).
100% Inspection / Customer Feedback (SME review of the completed report deliverables for accuracy and completeness).
SS-4: Restore Facility and Site Conditions
1.1.3, 1.5.2, 1.5.3
Zero (0) damage to Government property. All temporary compressor/dryer systems, diagnostic loggers, hoses, fittings, and waste fluids must be fully removed. Mechanical room and facility must be restored to 100% pre-test conditions.
100% Inspection (Joint walk-through with Contractor PM upon equipment removal).
3. Government Furnished Property and/or Services
3.1. Government Furnished Property.
3.1.1. None
3.2. Government Furnished Services.
3.2.1. Utilities. The Government will furnish the electricity, water, and sewage services (as necessary) for the accomplishment of service IAW this PWS.
3.3. Government Property Incidental to the Place of Performance.
3.3.1. None
4. General Information.
4.1. Quality Control.
The contractor is required to control the quality-of-service delivery and offer to the Government for acceptance only services which conform to contract requirements. The overall control of quality must meet the specified performance thresholds for each requirement in the Services Summary.
4.2. Quality Assurance
The Government will evaluate the contractor’s performance to ensure services are received. The Government will evaluate the contractor’s performance through on-site inspections and receipt of customer complaints.
The Government will inspect each task as completed. The Government will investigate complaints received from customers. The Government will make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s). Remedies for non-conforming services will be resolved IAW the applicable Inspection/Acceptance clause attached within the contract.
4.2.1. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the Contracting Officer.
4.2.2. The services to be performed by the contractor during the period of this contract shall (at all times and places) be subject to review by the Contracting Officer or authorized representative(s).
4.3. Security Requirements.
The contractor shall be responsible for all passes issued to their employees under this contract. Applications shall be coordinated by the Contracting Officer or designated representative. At the time of application, Security Forces will conduct a background check on employees. Upon termination of employment or contract completion, the contractor shall be responsible for returning identification cards/base passes to Security Forces within 24 hours.
4.3.1. REAL ID-Compliant Identification.
IAW DoDM 5200.08V3_DAFMAN 31-101V3_DAFGM 2024-01, Installation Perimeter Access Control. Base access and Common Access Cards (CAC) requests will require REAL ID-Compliant identification for Base access and CAC creation. Failure of the vendor to ensure personnel have REAL ID-compliant identification will result in denial of Base access and CAC requests.
4.3.1.1. Contractor Access to Department of the Air Force Installations.
• The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
• The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate to obtain a vehicle pass.
• During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
• When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with DAFI 31-101, Base Defense Operations, and DODMAN5200.02_DAFMAN 16-1405 , Department of the Air Force Personnel Security Program, as applicable.
• Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
• The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in AFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time.
To update information, personnel can access the globe icon on their system desktop screens and choose the “Access Self-Service” option.
• Failure to comply with these requirements may result in withholding of final payment.
4.4. Physical Security.
The contractor shall be responsible for safeguarding all Government property provided for contractor use. At the close of each work period, Government facilities, property, and materials shall be secured.
4.5. Operational Security (OPSEC).
The contractor shall adhere to the following minimum requirements in support of this requirement:
4.5.1. All contractors, subcontractors, their employees, associates, and consultants who have access to critical information and indicators must comply with the Air Force-sponsored Operations Security (OPSEC) program.
4.5.2. OPSEC is an information-related capability that preserves friendly essential secrecy by using a process to identify, control, and protect critical information and indicators. If critical information and indicators are disclosed, it could allow adversaries or potential adversaries to identify and exploit friendly vulnerabilities leading to increased risk to mission failure or the loss of life. The desired effect of OPSEC is to influence the adversary’s behavior and actions by reducing the adversary’s ability to collect and exploit critical information and indicators about friendly activities.
4.5.3. Responsibilities:
4.5.3.1. Contractors must ensure employees receive OPSEC education that includes an overview of the OPSEC process, the definition of OPSEC, its purpose, what is critical information, the individual’s role in protecting critical information, and the general adversary threat to the AF’s critical information. Additionally, OPSEC education must include updated threat information, changes to critical information and indicators, new procedures and/or OPSEC measures implemented, altered, or deleted by the organization.
4.5.3.2. DoD Contractors with OPSEC requirements or that have access to critical information and indicators shall complete initial and annually recurring refresher training. Accomplishment of initial OPSEC training must not exceed 90 days from initial assignment to a contract with OPSEC requirements. Access to mission-critical https://static.e-publishing.af.mil/production/1/af_a4/publication/dafi31-101/controlled_unclassified_information.pdf https://static.e-publishing.af.mil/production/1/saf_aa/publication/dodman5200.02_dafman16-1405/dodm5200.02_afman16-1405.pdf https://static.e-publishing.af.mil/production/1/saf_aa/publication/dodman5200.02_dafman16-1405/dodm5200.02_afman16-1405.pdf information will not be allowed until OPSEC education has been completed and documented.
4.5.3.3. OPSEC education is a continuous requirement. The host unit OPSEC coordinator must track OPSEC training statistics to include the personnel working on the contract, when each individual receives the required initial OPSEC training, and when refresher training is due and/or completed.
4.5.4. Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Controlled unclassified information (CUI) may only be transmitted as directed in this PWS.
4.5.5. The Contractor shall not post to company websites, publications, newsletters, or other media any images, data, or information that reveal sensitive government operations, personnel, equipment, and/or classified or controlled unclassified information. When in doubt, company press releases related to this contract should be coordinated through the COR or CO, as applicable.
4.5.6. Prior to seeking approval through the F. E. Warren AFB Public Affairs, any information to be released outside of official U.S. Government channels, via any media (to include electronic communications), must be approved through an OPSEC review. All personnel must promptly report OPSEC-related incidents, issues, and concerns to the host-unit OPSEC coordinator.
4.5.7. Contractor shall restrict access to those individuals with a valid need-to-know who are actually providing services under the contract. Further dissemination to other contractors, subcontractors, or other government agencies and private individuals or organizations is prohibited unless authorized in writing.
4.5.8. Because observation of events, operations, physical changes, etc., may reveal National Security information, specific restrictions are needed to preclude unintentional release of this information to unauthorized parties. Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793. Therefore, contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including Social Networking sites) any images, data/information, or observed events that reveal sensitive government operations, personnel, equipment, including, but not limited to:
4.5.8.1. Tactics, techniques, and procedures, production, or work schedules, any visible or concealed modifications, upgrades, additions to vessels, aircraft, or weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, vehicle, vessel, or aircraft movements;
specialized equipment orders, deliveries, shipments, etc. Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the COR or CO, as applicable.
4.5.8.2. Government issued badges, identification shall be removed and/or concealed from plain sight when off base and shall not be left in vehicles or unprotected areas. Badges and passes may not be duplicated, copied, or loaned to others. Lost or stolen identification badges, vehicle passes, etc., will be immediately reported to the COR, CO, and/or Installation Security Office.
4.6. Anti-Terrorism
4.6.1. Notification: If the Contractor (contract employees/subcontractors) identify any suspicious activity, they shall contact the Base Defense Operations Center (BDOC) at 307-773-3501 (On-installation)/Missile Security Control (MSC) at 307-773-2701 (Off-installation) and notify the CO and COR (if appointed) that they contacted the BDOC and/or MSC.
4.7. Location/Hours of Operation.
4.7.1. Location. Place of performance is at FE Warren AFB WY. Telework shall not be permitted for this task order/contract.
4.7.2. Normal Hours of Operation. The contractor shall perform the services required under this contract during the hours listed within Table 1, Location and Hours of Work. The contractor may work (with prior approval of the CO) extended hours to ensure timely completion of work at no additional cost to the Government.
4.7.3. Recognized Holidays. The contractor is not required to provide service on the following days, unless otherwise noted:
• New Year's Day (January 1).
• Birthday of Martin Luther King, Jr. (Third Monday in January).
• Washington's Birthday (Third Monday in February).
• Memorial Day (Last Monday in May).
• Juneteenth National Independence Day (June 19).
• Independence Day (July 4).
• Labor Day (First Monday in September).
• Columbus Day (Second Monday in October).
• Veterans Day (November 11).
• Thanksgiving Day (Fourth Thursday in November).
• Christmas Day (December 25).
If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
Table 1. Location and Hours of Work
Building No. Name of Facility Days Time
Bldg. 1235, East Mechanical Room
Col Flint Maintenance Building Monday-Friday 0700-1600 hrs
4.8. Conservation of Utilities.
The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:
4.8.1. Lights shall be used only in areas where and when work is being performed.
4.8.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
4.8.3. Water faucets or valves shall be turned off after the required use has been accomplished.
4.8.4. Government telephones shall be used only for official Government business.
4.9. Environmental Controls.
4.9.1. Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, federal, state, and local laws, regulations, and requirements regarding environmental protection, to include Section 01 57 19.05 32, Environmental Protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost because of the change, the contractor shall inform the CO pursuant to notice requirements and negotiate a modification to the contract.
4.9.2. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the F.E. Warren AFB Fire Dept at 911 (landline) or 307-773-2931 (cell phone). The liability for the spill or release of such substance(s) rests solely with the contractor and its agent.
4.9.3. Hazardous Material (HM). If hazardous materials will be used in the execution of this contract, the contractor shall comply with all federal, state and local regulations concerning the use, storage, and reporting of HM in accordance with DAFMAN 32-7002, Environmental Compliance and Pollution Prevention. The contractor shall be required to obtain authorization per the Installation Hazardous Materials Management Program before ordering or purchasing any hazardous product and may not bring a HM onto F.E. Warren AFB property, nor use a HM, until the contractor receives all required authorizations. This authorization process may take up to three weeks. The contractor shall provide the information listed in Attachment 1 of Section 01 57 19.05 32 to request authorization for all hazardous materials proposed for use on FE Warren AFB or the missile field.
4.9.4. Green Procurement Program (GPP). In performance of this contract, contractors shall use Environmental Protection Agency (EPA) designated recycled content products, Information Technology (IT) Energy Star products/appliances, Federal Energy Management Program (FEMP) Designated Energy Efficient Low Stand By Power products/appliances, U.S. Department of Agriculture (USDA) Bio based/Bio preferred products, Environmentally preferable products, Electronic Product Environmental Assessment Tool (EPEAT) registered products, Water Sense or other water efficient products, non- or Low Ozone depleting substances under the Significant New Alternatives Policy (SNAP), non or Low toxic or hazardous constituents (e.g. non- VOC paint) and any other environmentally sustainable product/method, to the greatest extent possible.
4.9.5. Elimination of Use of Class I Ozone Depleting Substances (ODS).
4.9.5.1. Contractors shall not:
4.9.5.1.1. Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or
4.9.5.1.2. Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.
4.9.5.2. For the purposes of Department of the Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in DAFMAN 32-7002) are Class I ODSs:
4.9.5.2.1. Halons: 1011, 1202, 1211, 1301, and 2402;
4.9.5.2.2. Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC- 115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R- 502, and R-503; and
4.9.5.2.3. Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
4.10. Safety Requirements.
4.10.1. In performing work under this contract, the contractor shall:
4.10.1.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
4.10.1.2. Record and report promptly (within one hour), to the contracting officer or designated COR, all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel.
4.10.1.3. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the CO.
4.10.2. Health and Safety on Government Installations. In performing work under this contract on a Government installation, the contractor shall:
4.10.2.1. Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
4.10.2.1.1. Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
4.10.2.2. The contracting officer may, by written order, direct Department of the Air Force Occupational Safety and Health (AFOSH) Standards and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.
4.10.2.3. Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.
4.11. Privatized Utility Systems.
4.11.1. The electrical distribution utility system at F.E. Warren Air Force Base has been sold to High West Energy (“System Owner”) as part of the USAF Utilities Privatization (UP) effort. Therefore, the System Owner is the sole provider of these utility services to the installation and should be viewed just like any other local utility Contractor.
4.11.2. Newly installed system infrastructure and modifications of (or connections to) existing system infrastructure identified in the specifications and drawings must be coordinated with the System Owner prior to the contract start date. The System Owner must be integrated into the design, inspection of construction, tie-in to existing utilities, and conveyance of any exterior utilities. The preferred process for connecting facilities is to request that the System Owner install the required connecting facilities, up to a point of demarcation to be identified by the Government, as a connection charge. However, if a connection charge cannot be negotiated, work may be accomplished by the Prime Construction Contractor and later connected to the System Owner’s system, provided that the System Owner’s connection criteria, as set forth in its utility services contract with the Government, are met. Any fees associated with connecting Contractor constructed infrastructure to the System Owner’s system must be negotiated with the System Owner. All work on the system or facilities expected to connect to the system shall comply with the System Owner’s specifications and construction standards.
In no event shall the Contractor cap, connect to, or otherwise touch the System Owner’s infrastructure without the System Owner’s express written permission. This also applies in the event of a utility strike involving the System Owner’s infrastructure.
4.11.3. System Owner Office Hours:
• Monday thru Thursday, 7:30am – 5:00pm MST
4.11.4. If the Contractor requests the System Owner’s efforts outside of the above identified business hours, additional costs may be incurred by the Contractor due to the scheduling of the request.
For a non-emergency, the System Owner may be contacted at:
• Project Manager o 307-365-6458
• HWE Main Office o 6270 CR 212, PO Box 519
Pine Bluffs, WY 82082 o 307-245-3261
For emergencies or utility strikes involving the System Owner’s infrastructure, please follow standard procedures identified on the Dig Permit Request Checklist.
4.12. Continuation of Essential DoD Contractor Services During Crisis.
IAW R-DFARS 237.7602(a), it is determined that the Air Compressor and Dryer System Audit Services has NOT been identified as an essential service.
4.13. Contractor Personnel.
4.13.1. Contract Manager: the contractor shall provide a contract manager who shall be responsible for the performance of the services. The name of the contract manager shall be provided to the CO in writing prior to the beginning of the first performance period. The contract manager must be able to read, write, speak, and understand English.
4.13.1.1 The contract manager shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract.
4.13.2. Contractor Employees: the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
4.13.2.1. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.
4.13.3. Contractor Certification: Contractor certification requirements shall comply with City, State and Federal American Society of Mechanical Engineers (ASME) Code and Occupational Safety and Health Administration (OSHA) standards. The contractor shall submit a written confirmation on company letterhead with the quote, to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees meeting certification requirements.
The contracting officer will endorse the confirmation and maintain in accordance with file and disposition requirements.
4.14. Records. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS or required by the provisions of a mandatory directive listed in Applicable Publications and Forms. If requested by the Government, the contractor shall provide the original record, or a reproducible copy of any such record within five working days of receipt of the request.
4.15. Controlled Unclassified Information (CUI).
4.15.1. Contractors shall follow CUI safeguarding and dissemination controls in accordance with Part 2002 of Title 32, CFR, DoDI 5200.48, Controlled Unclassified Information, and DoDI 5200.48_DAFI 16-1403, Controlled Unclassified Information.
4.15.2. Unlike classified information, an individual or organization generally does not need to demonstrate a need-to-know to access CUI, unless required by a law, regulation, or government- wide policy, but must have a lawful governmental purpose for such access.
4.15.3. Marking Requirements. Contractors shall follow CUI marking requirements in accordance with DoDI
5200.48 and DoDI 5200.48_DAFI 16-1403.
4.15.4. Dissemination. Contractors shall follow CUI dissemination requirements in accordance with DoDI
5200.48 and DoDI 5200.48_DAFI 16-1403.
4.15.5. Storage. Contractors shall follow CUI storage requirements in accordance with DoDI 5200.48 and DoDI 5200.48_DAFI 16-1403. During working hours, steps shall be taken to minimize the risk of access by unauthorized personnel, such as not reading, discussing, or leaving CUI information unattended where unauthorized personnel are present. After working hours, CUI information will be stored in unlocked containers, desks, or cabinets if the government or government-contract building provides security for continuous monitoring of access. If building security is not provided, the information shall be stored in locked desks, file cabinets, bookcases, locked rooms, or similarly secured areas.
4.15.6. Transmission. Contractors shall follow CUI transmission requirements in accordance with DoDI
5200.48 and DoDI 5200.48_DAFI 16-1403. CUI information and material may be transmitted via first class mail, parcel post, or, bulk shipments. When practical, CUI information may be transmitted electronically (e.g., data, website, or e-mail), via approved secure communications systems or systems utilizing other protective measures such as Public Key Infrastructure or transport layer security (e.g., https). Avoid wireless telephone transmission of CUI when other options are available. CUI transmission via facsimile machine is permitted;
however, the sender is responsible for determining whether appropriate protection will be available at the receiving location before transmission (e.g., facsimile machine attended by a person authorized to receive CUI;
facsimile machine located in a controlled government environment). Contractors will remain cognizant of aggregation and compilation of CUI based on the potential to generate classified information pursuant to security classification guidance.
4.15.7. Disposition.
4.15.7.1. Contractors shall follow CUI disposition requirements in accordance with DoDI 5200.48 and DoDI
5200.48_DAFI 16-1403.
4.15.7.2. Record and non-record copies of CUI documents will be disposed of in accordance with Chapter 33 of Title 44, U.S.C. and the DoD Components’ records management directives. When destroying CUI, including in electronic form, agencies must do so in a manner making it unreadable, indecipherable, and irrecoverable. If the law, regulation, or government-wide policy specifies a method of destruction, agencies must use the method prescribed.
4.15.7.3. Record and non-record CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable the original information such as those identified in NIST SP 800-88 and in accordance with Section 2002.14 of Title
32, CFR.
4.15.8. Disclosure.
4.15.8.1. Contractors shall follow CUI disclosure requirements in accordance with DoDI 5200.48 and DoDI
5200.48_DAFI 16-1403.
4.15.8.2. Contractor shall immediately notify the Contracting Officer and servicing Information Protection Office of unauthorized disclosure of CUI.
5. Appendices
A. Publications/Instructions
B. Deliverables
APPENDIX A – Publications/Instructions
Publication/Instruction /Name
Date Applicable
Paragraph/Chapter PWS Paragraph
DoDM 5200.08V3_DAFMAN 31-
101V3_DAFGM
26 Feb 20 Entire Document 4.3.1
DAFI 31-101, Base Defense Operations
09 Sep 24 As applicable for unescorted entry
4.3.1.1
DODMAN5200.02_DAFMAN 16-
28 Nov 23 As applicable for unescorted entry
4.3.1.1
AFMAN 10-206, Operational Reporting
30 Jun 26 As applicable 4.3.1.1
18 USC § 793 N/A As applicable to disclosure 4.5.8
Section 01 57 19.05 32, Environmental Protection
Apr 2026 Entire Document 4.9.1
DAFMAN 32-7002 12 Jun 2025 Entire Document 4.9.3
Title 32, CFR, Part 2002 N/A Entire Document 4.15.1, 4.15.7.3
DoDI 5200.48, Controlled Unclassified Information
03 Mar 2020 Entire Document 4.15.1, 4.15.3, 4.15.4, 4.15.5, 4.15.6, 4.15.7.1, 4.15.8.1
DoDI 5200.48_DAFI 16-1403 04 Oct 21 Entire Document 4.15.1, 4.15.3, 4.15.4, 4.15.5, 4.15.6, 4.15.7.1, 4.15.8.1
Title 44, U.S.C., Chapter 33 N/A As applicable to records disposal
4.15.7.2
NIST SP 800-88 Dec 2014 As applicable to media sanitization
4.15.7.3
APPENDIX B – Deliverables
All deliverables must meet professional standards and the requirements set forth in the applicable contractual documents. The Contractor shall be responsible for delivering all specified end items. The end items listed in the table below are outputs, which fall within the scope of this effort and are illustrative of the type of work the Government expects to require.
Title Submission Date Distribution Copies Written Request for Base Access (PWS para. 4.3.1.1)
Prior to requiring base access Contracting Officer (CO)
1 each
Hazardous Materials Authorization Request & SDS (PWS para 4.9.3)
Three weeks prior to planned use CO 1 each
Comprehensive Air Audit & Feasibility Report (PWS para 1.4.3, 1.5)
Within 14 calendar days after equipment removal
CO 1 each
Piping Pressure Test Certification (PWS para. 1.5.2.2)
Prior to equipment removal / final departure CO 1 each
Returned Base Identification/Passes (PWS para 4.3.1)
Upon termination of employment or contract completion
Security Forces All
Verbal Damage Notification (PWS para. 1.5.3.1)
Within two (2) hours of the incident CO & Facility Manager
Verbal
Initial Damage Assessment & Corrective Plan (PWS para.
1.5.3.2)
Within twenty-four (24) hours of the incident CO 1 each
Final Contractor-Caused Damage Report (PWS para. 1.5.3.3)
Within five (5) calendar days of completed repairs
CO 1 each
Contractor Certification (PWS para 4.13.3)
With Quote CO 1 Each
File details come from the government source that posted it. Updated .