Atch 3 Past Performance Questionaire 20191231.docx
DOCX document 19 KB Posted
- Attached to
- 30 FSS Water Softener Canister Exchange
- Solicitation number
- FA461020Q0007
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATER SOFTENER CANISTER EXCHANGE SERVICES
TECHNICAL RESPONSE QUESTIONNAIRE
Source Selection Sensitive (when filled-out) IAW FAR 2.101 and FAR 3.104
INSTRUCTIONS: For each sub-factor below, in the first table provide a detailed description of specific tasks performed for that factor that correspond to your “Project References” 1, 2, 3. Use the reference table to provide at least one but up to three (3) references for factor 1 to support the experience claimed in the first table. [Reference Addendum to FAR 52.212-1, Paragraph C.1.(a)].
Factor 1: Three (3) years of experience providing specific water canister exchange services within the last five (5) years preceding the release of this request for proposal. Provide detailed information in performing water canister exchange services as described in factors 1. Provide reference(s) and contact information to support the experience claimed by offeror.
To Be Considered Technically Acceptable for Factor 1: The contractor’s responses evidence that the contractor has three (3) years of experience performing the tasks described factors 1 within the last five (5) years preceding the release of this request for proposal. References provided must support the experience claimed by offeror.
Use the narrative block in the first table to provide a description of water canister exchange services performed for below item that corresponds to your referenced projects (i.e. ref. #1,2,3).
| Water Canister Exchange Services for food srvice establishments. |
| At least three (3) years of experience within the last five (5) years? |
(ref. Atch 1 PWS dated 25 Oct 2019)
|_| Yes |_| No
Narrative:
At least one reference but no more than 3 references for factor 1.
Project Reference #1 for factor 1
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub Contractor (S)? |
Check as appropriate
|_| P |_| S
POC Name:
Phone #:
Email:
Project Reference #2 for factor 1 (leave blank if N/A)
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub Contractor (S)? |
|_| P |_| S
POC Name:
Project Reference #3 for factor 1 (leave blank if N/A)
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub Contractor (S)? |
|_| P |_| S
POC Name:
FOR OFFICIAL USE ONLY (FOUO) FA4610-20-Q-0007
Attachment 3 Technical Experience Questionnaire
File details come from the government source that posted it. Updated .