Attch_5_Drawings.pdf
PDF 2 MB Posted
- Attached to
- XUMU 13-1021B Upper El Rancho Rd. Bridge Federal contract opportunity
- Solicitation number
- FA4610-14-R-0032
About this file
Attch 5 FA4610-14-R-0032 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| POST_SITE_VISIT_Questions_for_Upper_El_Rancho_Bridge_FA4610.docx | DOCX document | |
| Site_Visit_Meeting_Minutes_(2).doc | DOC document | |
| Attch_6_Specifications.pdf | ||
| Attch_3_Davis_Bacon_17_Oct_2014.pdf | ||
| FA4610-14-R-0032_Sol_pd2579D.pdf | ||
| Attch_1_SOW.pdf | ||
| Attch_4_Basis_of_Design-Upper_El_Rancho.pdf | ||
| Attch_2_Environmental_Specs.pdf | ||
| Attch_7_RMDF.pdf | ||
| Attch_8_General_Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATEDESCRIPTION OF REVISIONSYMBOL
PRO
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
DO NOT DUPLICATE THIS DRAWING -- OR THE DATA CONTAINED ON IT
ATTCH 5: FA4610-14-R-0032
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
JEC
T #
D
RA
W
IN
G
DATE
O F
SCALE
DRAWING TITLE
PROJECT TITLE DRAWN
REVIEWED
DESIGNED
FOR OFFICIAL USE ONLY -- INFORMATION SAFEGUARDING IS REQUIRED
The information contained on this drawing shall remain under the control of the originating requester or agency or ts successor in function at all times. Information safeguarding is the responsibility of the individual/agency/company requesting the data and taking original possession of this drawing. Release/disclosure of data to any party beyond the original request and intended use is prohibited. No public publication of the data by any means or analyses thereof is authorized. Upon completion of the use of the data contained on this drawing, the drawing must be returned or destroyed.
Direct any questions to the Engineering Support Element, 30 CES/CECB, at 805-606-4716.
Information safeguarding requirements are per AFMAN37-104, AFI 33-332, DOD Reg 5400.11, and Executive Order 12958 (when applicable).
File details come from the government source that posted it. Updated .