Amendment 1 - Questions and Answers.pdf

PDF 203 KB Posted

Attached to
Emergency Sewage Bypass Pump
Solicitation number
FA460825QC038
Issued by

About this file

This document is an Amendment 01 to a federal solicitation for an Emergency Sewage Bypass Pump, issued by the 2d Contracting Squadron at Barksdale Air Force Base. The amendment provides a Questions and Answers document addressing six vendor inquiries about the pump specifications, including operational parameters, control panel requirements, and physical characteristics. Key details include the pump's required performance of 1000GPM at 160'TDH, need for a Prime Guard II Controller (or equivalent), confirmation that the unit will be enclosed and sound attenuated, and mounting on a DOT Approved Highway Trailer. The solicitation remains a small business set-aside with a size standard of 750 employees, and the original quote submission deadline of 1:30 PM CDT on 31 March 2025 remains unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA460825QC038, Emergency Sewage Bypass Pump, Amendment 01

DEPARTMENT OF THE AIR FORCE

2D CONTRACTING SQUADRON (AFGSC)

BARKSDALE AIR FORCE BASE LOUISIANA

26 March 2025

MEMORANDUM FOR Vendors/Offerors

FROM: 2d Contracting Squadron/PKP 801 Kenney Avenue, Building 4400, Suite 2300 Barksdale Air Force Base, Louisiana 71110

SUBJECT: Amendment 01, FA460825QC038, Emergency Sewage Bypass Pump

1. The purpose of issuing Amendment 01 is to provide supplemental information in the form of a Question and Answers document. The following questions were submitted to 2 CONS by the deadline of 1:30 PM CDT on 21 March 2025 and the answers to each are highlighted below in red:

Question 1: What is the actual operating point?

Answer 1: This unit will be used at varying lift stations and sewer projects. Please refer to

Section 1.2 of the Salient Characteristics. Pump must provide the maximum duty point of

1000GPM at 160’TDH.

Question 2: What is the system’s force main back pressure?

Answer 2: Please refer to Section 1.2 of the Salient Characteristics. Pump must provide the maximum duty point of 1000GPM at 160’TDH.

Question 3: Is there a control panel model desired per the specs in section 2.2 of the Salient

Characteristics?

Answer 3: Control panel desired should be the Prime Guard II Controller by “Godwin Pump” or

Equal to Prime Guard II Controller.

Question 4: Is this unit enclosed?

Answer 4: Yes.

Question 5: Does the unit need to be sound attenuated or not?

Answer 5: Yes, sound attenuated enclosed.

Question 6: Is this unit to be skid mounted, on an off-road wheel package, or DOT ready?

Answer 6: Pump to be mounted on a DOT Approved Highway Trailer.

2. The due date and time of 1:30 PM CDT on 31 March 2025 remains unchanged for Solicitation

FA460825QC038.

FA460825QC038, Emergency Sewage Bypass Pump, Amendment 01

3. If you have any questions or concerns regarding this amendment please contact SrA Courtney

Decker, Contract Specialist, by telephone at (318) 456-4011 or by email at courtney.decker@us.af.mil.

ALISIA DAVIS, SrA, USAF Contracting Officer

2025-03-26T09:45:20-0500