This document is a Statement of Work (SOW) for the removal and installation of new carpet in the Airman Resiliency Center located in Building 6238, Hangar 11 at Barksdale AFB, Louisiana. The work includes furnishing all materials, labor, and equipment to remove existing carpet and install new carpet in five rooms, totaling approximately 515 square feet. The contract has a delivery and installation period of 60 days from the date of award. The SOW provides details on the location, hours of operation, security requirements, safety, and housekeeping. It also identifies the project liaisons at Barksdale AFB.
The related federal contract opportunity, solicitation number FA460824QC150, is a Request for Quotation (RFQ) for the carpet removal and installation at Barksdale AFB. This is a total small business set-aside with a North American Industry Classification System (NAICS) code of 314110. The RFQ provides background information on the USAF Carpet II program, which has a two-tier structure for carpet manufacturers and installers. It also lists the points of contact for the Tier I carpet manufacturers. The RFQ specifies the required contract line items, a site visit, and the due dates for questions, quotes, and other related information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA460824QC150 - Amendment 03.pdf | ||
| Attachment 3 version 2 - Room Layout.pdf | ||
| FA460824QC150 - Amendment 02.pdf | ||
| FA460824QC150 - Amendment 01.pdf | ||
| Attachment 2 - Statement of Work.pdf | ||
| Attachment 4 - CE Memorandum.pdf | ||
| Attachment 1 - Provisions and Clauses .pdf | ||
| Attachment 3 - Room Layout.pdf | ||
| Attachment 5 - Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA460824QC150
Attachment 2 verison 2 dated 09/06/2024
Statement of Work Airman Resiliency Center Carpet 96th
BGS
339Lindbergh Rd East
Barksdale AFB, LA 71110 Bldg 6238, Hangar 11
8/15/2024
1. SCOPE / DESCRIPTION OF SERVICES: The work covered by these requirements consists of furnishing all plans, materials, labor, equipment, appliances, and performing all operations to remove/install new carpet in the Airman Resiliency Center located in the 96th BGS
2. DELIVERY AND INSTALLATION: Sixty (60) Days AOR.
3. BACKGROUND: An Airman Resiliency Center is being opened in the 96th BGS hangar following the split of 2AMXS and will need to be furnished with new carpet
4. LOCATION:
- 339 Lindbergh Rd East Bldg 6238 located at Barksdale AFB (BAFB), LA
- Second floor of hangar 11
• 2.1. HOURS OF OPERATIONS. Normal hours of operation for this contract are between hours of 0800 and 1600 hours. The contractor shall perform the services required under this contract during this time excluding Saturdays, Sundays, and Federal Holidays.
5. REQUIRMENTS (OVERVIEW): The work covered under this Statement of Work shall consist of furnishing all material, labor, and equipment in performing all operations necessary to remove/install carpet in indicated room(s) to include cove base and transition strips. The cove base will remain in place in the rooms where the electrical conduit and receptacles impede access as shown in the pictures located in attachment 3. Room 213 does not ally as there is no infrastructure impeding access to the carpet and cove base in this room. For rooms 206, 207, 208, and 211 the contractor shall make all attempts to install the new carpet under the existing cove base where the electrical conduit and receptacles are impeding access, unless there are extenuating circumstances whereas the carpet will be terminated at the existing cove base in the identified areas.
a) Remove existing glue down carpet/prep in rooms.
b) Rm 206 install carpet in room (103.47 sq ft)
c) Rm 207 install carpet in room (86.84 sq ft)
d) Rm 208 install carpet in room (94.46 sq ft)
e) Rm 211 install carpet in room (106.76 sq ft)
f) Rm 213 install carpet in room (124.61 sq ft)
6. SECURITY REQUIREMENTS: Visitor Passes: To receive a visitor pass the contractor must complete an (S5 Pass) AF Form 75 Visitors/ Vehicle Pass. The contractor should contact TSgt William Lafosse/SSgt Zachary Miller at (318) 456-3687 or (318) 456-2356, once the driver is 30 min from the East Gate (industrial gate), so an escort can be provided to meet the driver, and/or installation crew, to get their visitor pass. S5 Pass. Once the form is filled out, send the form back to S5 (email is on the form). S5 will conduct a background check, after 7-10 days the sponsor will meet the contractor at the East Gate Visitor Center and escort the contractors to S5 to receive a temporary I.D. for the duration of the project. The contractor vehicle must be inspected for any contraband upon arrival to East Gate anytime they need to gain access to the installation. This information will be reviewed and forwarded to 2 SFS/S5 Pass & Registration Office. If a pass is approved, the 2 SFS/S5 Pass & Registration Office will issue an AF Form 75 (Visitor Pass) to the contractor and his/her employees upon completion of screening process for the duration of the contract. The screening process takes time, and the contractor shall visit the Commercial Visitor Control Center prior to expecting base entry to receive required forms and instruction on the application process, to include estimated time of receiving the visitor pass. Other option is for the contractor to contact TSgt William Lafosse/SSgt Zachary Miller at
(318) 456-3687 or (318) 456-2356, once the driver is 30 min from the east gate (industrial gate), so an escort can be provided to meet the driver, and/or installation crew, to get their visitor pass. Although contractors will not be issued vehicles passes, vehicles are subject to search while on the installation. Employee privately owned vehicles will not be allowed access to restricted/controlled areas without a free zone being established. All Contractor vehicles should have markings with the company name for quick identification of ownership and notification if they are involved in an incident. Conduct Requirements: The contractor shall ensure that his/her employees comply with all base traffic regulations and properly conduct themselves while on the base.
• 5.1. Retrieving Identification Media. The Contractor shall be responsible for retrieving all identification media including vehicle passes from employees who depart for any reason before the contract expires (e.g., terminate for cause, retirement, etc.)
• 5.2. The Contractor and contractor employees shall comply with base traffic regulations.
• .3. Weapons, Firearms, Ammunition. Contractor employees are prohibited from possessing weapons, firearms, and ammunition on themselves or within their contractor or privately owned vehicles while on base.
• 5.4. The Contractor shall be responsible for safeguarding all government property, and controlled forms provided for contractor use. At the end of each work period, Contractor shall secure all Government facilities, equipment, and materials.
• 5.5. The contractor shall be responsible for the quality of all completed look. The contractor shall also ensure that furniture has been inspected for durability, material defects, and physical operational checks of office furniture completed. The contractor will be responsible for safeguarding government property.
7. SAFETY: The Contractor shall have a safety plan for their employees. The Contractor shall instruct each employee in the recognition and avoidance of unsafe conditions and regulations to his or her work environment to control or eliminate any hazards or other exposure to illness or injury. The Contractor shall provide their employees appropriate Personal Protective Equipment (PPE) and mandate proper wear.
• 6.1 Accident/Incident Reporting and Investigation. Contractor shall record and report to the 2d Security Forces Squadron Law Enforcement Desk at (318) 456-2551 all available facts relating to each instance of accidental damage to Government property or injury to either Contractor or Government personnel. The Contractor shall secure the accident scene and wreckage until released by the accident investigative authority through the 2d Security Forces Squadron POC. If the Government elects to investigate the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is complete.
8. HOUSEKEEPING: The Contractor shall keep all facilities and work areas clean and neat
IAW industry, Occupational, Safety and Administration (OSHA), fire and safety standards.
9. PROJECT LIAISONS: Tsgt Lafosse (318) 456-3687 & SSgt Miller (318) 456-2356