Questions Answers.docx

DOCX document 11 KB Posted

Attached to
Demo Maintenance Shop Buildings
Solicitation number
FA4608-12-R-0014
Issued by

About this file

These are the questions and answers from the Site Visit. Please contact SrA Jeffery Hairston at (318) 456-6739 or by email at jeffery.hairston us.af.mil with any questions or concerns.

View the file

Other files

File Type Posted
Attachment 3 - Environmental.pdf PDF
Attachment 6 - Insurance.pdf PDF
Attachment 1 WD.pdf PDF
Attachment 7 Utility Map.pdf PDF
Attachment 2 - AF66.pdf PDF
FA4608-12-R-0014 Solicitation.pdf PDF
Attachment 4 - BAFBI 33-2.pdf PDF
Attachment 5 - AFI 32-1001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers for FA4608-12-R-0014

1. Is the government going to remove all of these items prior to demo?

Or should the contractor price in the cost to remove the items?

Answer: All items contained within the building and on the site will be removed prior to commencement of demolition.

2. Is sodding allowed on this job as well as seeding?

Answer: Sodding is allowed, however the project is anticipated to bid using seeding. If sodding is requested instead of, or in addition to seeding, provide rationalization for extra cost (why sodding is in the best interest of the Government).

3. Are the electric transformers to be removed from the poles and returned to the base?

Answer: Yes

4. If the building is ACM positive, is the base going to perform the abatement, or do we provide a line item for abatement in our bid to show is separate from the rest of the bid?

Answer: Asbestos abatement will be handled as a Change Order Request.

5. How far back is the concrete to be removed? Will concrete be taken out back to the concrete joint closest to the street?

Answer: Leave the existing culvert. Remove concrete driveway to closest joint to street, provided a safety hazard is not created by differences in elevation caused by the removal of the driveway. It is anticipated utility vehicles, personal cars, and mowers will require access across the culvert.

6. Is the fire alarm system to be returned to the base? If so, what part/parts of the system exactly?

Answer: Yes. Major components are to be returned (box and devices).