Attachment 5 - Wage Determination.doc

DOC document 36 KB Posted

Attached to
Demolition of Bldg 7253 and 7254
Solicitation number
FA4608-11-Q-C945
Issued by

About this file

Wage Determination

View the file

Other files

File Type Posted
Questions and Answers from 10 Aug site visit for Demolition jobs on Barksdale AFB.docx DOCX document
Demo B7253 B7254.pdf PDF
Attachment 3 - Environmental.doc DOC document
Attachment 6 - AFI 32-1001.rtf RTF text file
Attachment 1 - Drawings.pdf PDF
Attachment 4 - BAFBI 33-2.rtf RTF text file
Attachment 2 - AF66.pdf PDF
Attachment 7 - Insurance.doc DOC document
FA4608-11-Q-C945 - Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4608-11-Q-C945

Attachment 5

General Decision Number: LA100010 07/22/2011 LA10

Superseded General Decision Number: LA20080010

State: Louisiana

Construction Type: Building

Counties: Bossier, Caddo, Ouachita, Rapides and Webster

Counties in Louisiana.

BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

2 07/02/2010

3 08/13/2010

4 08/27/2010

5 09/03/2010

6 10/01/2010

7 11/12/2010

8 01/21/2011

9 02/11/2011

10 03/18/2011

11 05/13/2011

12 06/17/2011

13 07/22/2011

ELEC0194-005 09/05/2010

BOSSIER, CADDO, and WEBSTER PARISHES

Rates Fringes

ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 24.75 8.97

ELEC0446-006 03/01/2011

OUACHITA PARISH

Rates Fringes

ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 20.60 1%+8.81

ELEC0576-005 03/01/2011

RAPIDES PARISH

Rates Fringes

ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 23.50 5.70

PLUM0141-004 08/01/2010

BOSSIER, CADDO, and WEBSTER PARISHES

Rates Fringes

PLUMBER (includes HVAC pipe).....$ 24.52 10.43

PLUM0247-003 05/01/2011

RAPIDES PARISH

Rates Fringes

PLUMBER (includes HVAC pipe).....$ 24.10 8.30

* PLUM0659-002 07/01/2011

OUACHITA PARISH

Rates Fringes

PLUMBER (includes HVAC pipe).....$ 23.10 8.45

SHEE0361-003 01/01/2009

BOSSIER, CADDO, OUACHITA, RAPIDES, AND WEBSTER PARISHES

Rates Fringes

Sheet Metal Worker (includes

HVAC duct).......................$ 24.18 9.10

SULA2004-001 03/24/2004

Rates Fringes

CARPENTER (includes acoustical; drywall hanging/framing; metal stud installation; formbuilding;

and formsetting).................$ 13.77 0.00

Cement Mason/Concrete Finisher...$ 12.92 0.00

GLAZIER..........................$ 14.00 0.81

HVAC MECHANIC (setting system only)............................$ 9.00 0.00

IRONWORKER

Metal Building Erection.....$ 11.48 2.71

Structural..................$ 15.76 4.30

Laborer, common..................$ 9.00 0.00

Power Equipment Operators

Backhoe/Excavator...........$ 13.05 2.30

Crane.......................$ 17.36 0.00

Forklift....................$ 13.00 0.00

Trackhoe....................$ 10.00 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .