This is a Performance Work Statement for a federal cooling tower maintenance project.

The contractor shall procure and install a replacement fan drive for Cooling Tower #3 at Offutt Air Force Base (NexGen Work Task #17154995), which is an Amarillo right-angle fan drive model F110 rated at 64 HP at 1750 rpm with a 4.75:1 reducing ratio. The existing drive is broken and must be replaced with a like-for-like unit compatible with the existing Evapco cooling tower (model REP224-920) and the new NIDEC model GM65 motor (60 hp, 1785 rpm, 230/460V) being installed under a separate contract. The contractor must also replace all motor wiring and repair or replace conduit and connectors from the motor to the tower enclosure boundary, perform electrical megging to ensure operability, and coordinate with the separate motor contractor for proper alignment and connections. Additional requirements include pre-work site verification, adherence to FAA airfield coordination requirements for crane use, two-week advance notice for system outages, removal and reinstallation of fan guards and blades, fan balancing, startup testing, and provision of at least a one-year warranty on labor and materials. The contractor must supply all materials, labor, equipment, tools, and expertise; comply with OSHA, state, AFI, ETL, NFPA, and Unified Facility Criteria standards; perform quality assurance per ISO 9001; maintain traffic flow; provide 15 calendar days advance notice of utility interruptions; and dispose of all waste off-base per Offutt AFB Environmental Special Conditions section 01 57 19.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Project Title: B304 Cooling Tower #3 Fan Drive Replacement

NexGen Work Task #: 17154995

1. Requirements:

The Contractor shall procure and provide a new fan drive to match the cooling tower #3 fan and motor.

The new motor is being provided and installed on a separate contract. The fan drive shall be like-for-like in terms of fit, form, and function; it shall be compatible with the existing cooling tower fan and existing/new motor configuration and match the current unit capacity, size, and operational requirements.

Additionally, the Contractor shall replace the wiring and repair or replace the conduit and conduit connectors from the fan motor to the tower enclosure boundary.

The Contractor shall coordinate with the separately approved contractor and contract that is providing and installing the new motor in order to complete the repair work and provide a fully operational

Cooling Tower #3.

2. Conditions:

The three active towers are three cells, two of which are joined (Evapco S/N 4-108197-8198 refers to the entire installation of three towers), and are rated at 2400 ton and 7200 gpm. The two joined towers are model REP224-920 (two cell type of 1600 ton and 34,800 cfm). The third cell (Tower #3 – the subject of this work) is an extra joined single cell of this model.

- The original tower motor was a 60 hp, 2-speed, 1-winding, 3 phase, 460 VAC unit.

- The previous Tower motor was a 50 hp, 1785 rpm, 3 ph, 460V, 59 Amp, 68 SF Amp, SF 1.15, with 364T frame.

- The new motor to be connected to the new drive is a NIDEC model GM65 60 hp, 1785 rpm, 230/460V, 137/68 Amp, SF 1.15, 95% eff, with 364T frame.

The existing cooling tower fan drive is an Amarillo right-angle fan drive, model F110, S/N 327893, rated at 64 HP at 1750 rpm, with a service rating of 2.0 and a reducing ratio of 4.75:1.

The existing fan drive for tower fan #3 is broken. The motor wiring in Tower #3 was found to be water logged, deteriorated, and hanging loose, creating a potential arc/short hazard.

3. Project Requirements

• The Contractor shall visit site before starting any work to verify existing conditions space requirements in work areas.

• The Contractor shall abide by FAA notice and Airfield coordination requirements for any crane use.

• The Contractor shall coordinate with the Government for system operation to allow the work and testing. Two week notice is required for outages.

• The Contractor shall provide all required Lock-Out-Tag-Out work and equipment.

• The Contractor shall remove the tower fan guard and fan blade on Tower 3 and shall replace the fan drive / gearbox on Tower #3. This replacement shall include the connections, coupling components, and any associated kit equipment from the fan drive to the fan blade. This replacement shall include the fan drive shaft and shaft coupling for connecting to the fan drive motor. Replacement shall include the adjustment or replacement of the fan drive mounting base or mounting hardware as required. The contractor shall complete the alignment of the new fan drive to the fan blade assembly. The Contractor shall coordinate with the Contractor who is providing the new Tower fan motor to align the gearbox-to-motor shaft, coupling, and connections, and provide any hardware or kit equipment required for the fan drive mounting and alignment to the motor.

• The Contractor shall reinstall the fan guards and shall balance the fan of Tower 3 for full operational function.

• Contractor shall replace the wiring and repair or replace the conduit and conduit connectors from the fan motor to the tower enclosure boundary. The Contractor shall megger electrical equipment as required to ensure operability. The Contractor shall coordinate with the contract and contractor providing the new motor to connect the electrical wiring and test the new equipment.

• The Contractor shall provide start up testing to prove satisfactory installation and capability of the new equipment.

• The Contractor shall provide at least a 1-year warranty on all labor and new materials.

• The Contractor shall clean up and dispose of all removed equipment and project waste from the replacements, as well as any trash generated from the work. Refuse shall be disposed of off-Base in accordance with Offutt AFB Environmental Special Conditions section 01 57 19.

4. Other General Requirements:

The contractor shall furnish all material, labor, transportation, equipment, tools, services, expertise, supervision, and incidentals required to fulfill the requirements of this contract. No alterations, additions, or deletions shall be made unless by prior approval of the government Project Manager and the government Procuring Contract Officer (PCO). The work shall conform to the most current applicable State, AFI, ETL, NFPA, and Unified Facility Criteria Standards. Work shall be completed in a neat, substantial, and competent manner. All personnel shall abide by all industry safety standards, such as OSHA, and the Contractor shall provide all required PPE. The contractor shall perform quality assurance activities that conform to the quality assurance processes outlined in International organization of Standards (ISO) 9001, Quality Management Systems. The Contractor shall use PWS requirements.

The Contractor shall coordinate with the Government for needed system operation to allow the work and subsequent testing on the pump. The Contractor shall provide their own lock-out-tag-outs as needed.

During construction the Government will occupy the existing facilities. The contractor shall not restrict nearby pedestrian or vehicular traffic and shall coordinate with the Contracting Officer’s

Representatives to facilitate usage. The Contracting Officer’s Representatives shall be notified not less than 15 calendar days in advance of any interruptions in building utilities / services, which will be described in writing.

File details come from the government source that posted it. Updated .