This is a Questions and Answers document for Air Force solicitation FA460026Q0088, Basketball Court 4 Resurfacing, issued by the Department of the Air Force Air Combat Command. The Q&A provides clarifications on a performance work statement for resurfacing a severely damaged basketball court located in Building 321 at Offutt Air Force Base.
The court resurfacing project requires contractors to perform a complete sand-to-bare-wood refinishing using no fewer than five levels of sanding with contractor-selected grit sequences, followed by application of water-based high-solids gym-floor finish. The court dimensions are 64.5 feet wide by 105 feet long with two 9-by-4.5-foot basketball hoop extensions, totaling 6,853.5 square feet. Additional work includes repainting existing basketball court lines in their current locations and colors, stenciling a 129-inch-wide by 73-inch-tall Air Force Fitness logo in red, blue, and gray at center court, and installing two in-floor volleyball net sleeve systems with contractor-specified standard-compatible sleeves and covers. The government will provide the volleyball court layout responsibility to the contractor, remove basketball hoops and bleachers, and supply digital logo graphics. Contractors are expected to serve as subject matter experts for grit sequencing, volleyball sleeve specifications, and determining when the facility is safe to return to service. The solicitation deadline for questions was September 16, 2026 at 1100 Central Time, with offers due September 21, 2026 at 1100 Central Time. The period of performance is October 15 through November 15, 2026. No site visit attendance is mandatory, though one was conducted September 14, 2026. Site visit photographs and logo files were attached in Amendment 00002. No bonds are required, and the 8(a) program subcontracting limitations apply, requiring at least 50 percent of personnel costs to be performed by the 8(a) participant's own employees. The government point of contact for daily coordination is the Director of Sports and Fitness, Michelle Hannah.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Basketball Court 4 resurfacing FA460026Q0088 | |||
| Questions | Answers | ||
| 1 | The Government is still accepting quotes, | Yes quotes can be submitted until 21 Sep 2026 at 1100am Central Time. | |
| 2 | An extension or amendment is planned, | No extension is planned, an amendment has been posted to include the answers to all questions submitted. | |
| 3 | Or if an award has already been made? | Award has not been made. | |
| 4 | Current photographs of Basketball Court 4 showing the extent of the coating damage described in the PWS (peeling/stripping areas, any visible gouges or deep scratches, and the aluminum edge trim referenced in PWS §1.4). | Photos attached in Amendment 00002 | |
| 5 | Any existing floor dimensions, court markings layout, or as-built drawings on file for Court 4, if available. | Dimensions: 64.5ft wide x 105feet long. 2 Basket Ball Hoop extensions measuring 9 feet x 4.5 feet. Totalling 6,853.5 square feet | |
| 6 | Whether a brief virtual walkthrough (phone or video call with facility staff) could be arranged as an alternative for offerors unable to attend in person. | No virtual walkthrough will be conducted | |
| 7 | The PWS requires “no fewer than five levels of sanding.” Does this mean five separate abrasive grits/passes, and is a specific grit sequence required? | Yes. Contractor is expected to be the Subject Matter Expert when it comes to what grit sequence shall be used. | |
| 8 | Is the intent a full sand to bare wood or an abrasion/screening process followed by recoating? | Full sand to bare wood | |
| 9 | Does the Government know the existing finish system and whether wax or other maintenance coatings have been applied? | yes, wax and other maintenance coatings have been applied | |
| 10 | For the two in-floor volleyball net sleeve systems, please provide the required manufacturer/model, sleeve diameter, covers/lids, and other specifications | No requried manufatcurer or model will be supplied by the Government. Offerors should determine the appropriate sleeve diameter, cover, and other specifications. | |
| 11 | Is the contractor providing only sleeves and covers, or also posts, nets, anchors, hardware, or complete volleyball systems? | Only sleeves and covers. Must be compatible with STANDARD Volleyball systems. | |
| 12 | Please provide any available information on the existing floor construction beneath the maple, including subfloor system and approximate distance to the concrete slab | Information not available. | |
| 13 | Will the Government provide the approved volleyball court/sleeve layout, or is the contractor responsible for establishing it? | Contractor responsibility | |
| 14 | For the Air Force Fitness logo, will the Government provide approved artwork, dimensions, colors, and placement? | Yes, attached in Amendment 00002 | |
| 15 | Please confirm whether existing basketball/game lines are to be repainted in their current locations/colors and whether specific line widths or color standards apply. | Yes, existing game lines are to be repainted in their current locations/colors | |
| 16 | The PWS references deep scratches and gouges. Can you provide an approximate quantity or description of the repair areas? | no. The 5 levels of sanding will repair all scratches and gauges | |
| 17 | Is any maple-board replacement anticipated, or only sanding, filling, and refinishing? | no - not anticipated | |
| 18 | Will Government personnel move the bleachers and large equipment, or is the contractor responsible for moving/protecting them? | yes. Government personnel will move baskets | |
| 19 | Is there a required manufacturer/product for the water-based high-solids gym finish, or may the contractor propose a professional commercial gym-floor finish meeting the PWS? | No specific product is being requested by the government. | |
| 20 | Are there required cure times or a specific date the facility must be returned to service? | No. Facility will return to service when the contractor - an expert in the field- tells the Governmentt it is safe to return to service. | |
| 21 | If an alternate visit is not possible, can additional photographs, measurements, or existing-condition information be provided before the quote deadline? | Please see photos include with Amendment 00002 | |
| 22 | Please confirm whether attendance at the site visit is mandatory to submit a quote. | The site visit is not mandatory to submit a quote | |
| 23 | Floor plan of existing game lines and/or measurements of the existing court | Dimensions: 64.5ft wide x 105feet long. 2 Basket Ball Hoop extensions measuring 9 feet x 4.5 feet. Totalling 6,853.5 square feet. STANDARD Basketball lines | |
| 24 | Vectorized file of the Air Force Fitness logo that would be required, along with dimensions | Yes, attached in Amendment 00002 | |
| 25 | List of any/all equipment that needs to be removed from the space and where it would be stored. Much easier if equipment is removed base facility staff | Government will remove basketball hoops | |
| 26 | Wage determination | SCA Wage determinations are included with the original solicitation. | |
| 27 | Also, is a site visit available for Q0088? May a proposed flooring subcontractor/technical representative attend on behalf of, or with, the prime contractor? | Site visit was conducted on 14 September 2026, as outlaid in the solicitation description on Sam.gov | |
| 28 | May the same prime contractor submit separate quotations for both Q0088 and Q0089? If awarded both, may mobilization, personnel, equipment, and scheduling be coordinated between the projects while keeping each contract's scope and pricing separate? | Yes | |
| 29 | Are bid, performance or payment bonds required for this procurement? If so, please identify the applicable requirements, amounts and forms. | No | |
| 30 | What limitations on subcontracting or prime self-performance requirements apply to this solicitation, including any applicable deviations? We are evaluating the use of a specialist flooring subcontractor and need to establish whether that execution approach is permissible. | Per RFO 19.108-8(a)(1) Limitations on subcontracting: To be awarded a contract or order under the 8(a) program, the 8(a) participant is required to perform— |
For services (except construction), at least 50 percent of the cost incurred for personnel with its own employees.
| 31 | Please identify the required insurance types and minimum limits, and clarify whether the stated October 1–31 delivery period will be adjusted if award/funding occurs later. | Peroid of Performance date has been adjusted in Amendment P00002 to 15 Oct -15 Nov 26 |
| 32 | The notice uses CST for the September 16 question deadline, September 21 offer deadline and site visit. Please confirm whether those times mean local Offutt time (America/Chicago) or fixed Central Standard Time. | Local time, which is currently Central Time. |
| 33 | To assist with accurately pricing the required work, would you be able to provide any available current-condition photos of Basketball Court #4, including: | Included in Amendment 00002 |
| 35 | Wide-angle photos showing the overall court and existing layout | Included in Amendment 00002 |
| 36 | Close-up photos showing the peeling/stripping finish and damaged areas | Included in Amendment 00002 |
| 37 | Photos showing the existing court lines/markings that are to be repainted | Included in Amendment 00002 |
| 38 | Photos showing any deep gouges, scratches, floor tape, gum, or other areas requiring repair or removal | Included in Amendment 00002 |
| 39 | Photos of the court perimeter/edges | Included in Amendment 00002 |
| 40 | Is a drawing, image, or specification available showing the required Air Force Fitness center logo, including its approximate dimensions and required colors? | Yes, this has been included in Amendment 00002 |
| 41 | Is a drawing or layout available identifying the required locations and specifications for the two in-floor volleyball net systems/sleeves? | No |
| 42 | Is information available regarding the existing floor/subfloor construction at the locations where the volleyball sleeves will be drilled and installed? | No |
| 43 | Could you please provide: | |
| 44 | Approved logo artwork or a digital file | Included in Amendment 00002 |
| 45 | Required finished dimensions | 129inches wide x 73 inches tall |
| 46 | Required colors | red, blue, gray |
| 47 | Exact placement on the court | center court |
| 48 | Confirmation whether the Government will provide the stencil or the contractor must furnish it | Government will only provide digital graphics that have been included in Amendment 00002. |
| 49 | What is the exact Outer Diameter (O.D.) of the existing volleyball net upright posts currently owned by the base? | No current equipment. Gov't requires contractor to install STANDARD sleeves that will be easy to purchase equipment to fit. |
| 50 | Alternatively, does the government require a specific Inner Diameter (I.D.) for the new, permanently anchored in-floor sleeves (e.g., 3-inch, 3.5-inch, or 4-inch standard) to guarantee compatibility with their current equipment? | No current equipment. Gov't requires contractor to install STANDARD sleeves that will be easy to purchase equipment to fit. |
| 51 | To ensure structural safety during the subfloor concrete core-drilling phase, will the government provide structural blueprints of the slab beneath Basketball Court 4, or verify if the slab contains embedded utility conduits or post-tension cables? | Unknown I can try |
| 52 | What are the required dimensional boundaries (height and width) for the stenciled Air Force Fitness logo at center court? | 129in Wide x 73in tall |
| 53 | Scope of repair items (PWS Section 1.4). The Scope section lists several items in the same bulleted format as the affirmative work requirements, but they read as though they may be exclusions rather than included tasks: "Handling or enclosure of bleachers, loose equipment or furniture from the gym," "Removal of floor tape or excessive gum from the court," "Removal of deep gouges, scratches in floor from old bleachers," and "Repairs, repainting or touch up painting." Please confirm whether these four items are included in the Contractor's scope of work or are excluded from it, as this materially affects our pricing. | Contractor would be responsible for touching up paint errors they are responsible for. Otherwise, the 5 levels of sanding will be sufficient to remove excessive gum and smooth any scratches. |
| 54 | Work site building number. PWS Section 1.2 identifies the court as located in "building 321," while the solicitation's Deliveries/Performance and Inspection & Acceptance sections list the service performance and delivery address as "105 Washington Square, Bldg 49." Please confirm the correct building for Court 4 and for any site visit or work-site check-in. | Building 321 |
| 55 | Site visit and base access (EAL) logistics. We were not able to locate a stated site visit date, time, or RSVP/registration process within the solicitation documents as issued. Please confirm whether a site visit is being offered, and if so, the date, time, location, and the process and deadline for submitting Entry Authorization List (EAL) requests for attendees, given the compressed timeline before the September 21, 2026 offer due date | Site visit was conducted on 14 September 2026, as outlaid in the solicitation description on Sam.gov |
| 56 | Government point of contact / COR. PWS Section 2.10 (Contracting Officer Representative) is marked "N/A," while Section 2.11 (Key Personnel) identifies "the Director of Sports and Fitness" as key personnel on the government side. Please confirm who will serve as the government's on-site point of contact for daily coordination and acceptance during the period of performance. | Director of Sports and Fitness - Michelle Hannah |
| 57 | Wage determination conformance. The attached Wage Determination (No. 2015-5005, Rev. 30) does not include a labor classification that reasonably corresponds to gym floor sanding/finishing work. We intend to identify a conformed classification per 29 CFR 4.6(b)(2) and would appreciate confirmation of the government's expected timeline for reviewing a conformance request (SF-1444), given the 30-day period of performance. | The Government believes the attached SCA wage determinations attached does include a labor category that would apply to this requirement. |
| 58 | Does the requirement for “no fewer than five levels of sanding” mean five separate grit passes and a complete sand-to-bare-wood refinishing process, or is the intended scope a screening and recoating process? | Complete sand to bare wood refinishing process. See pictures of Court #3 - completed last year - as example |
| 59 | What type and manufacturer of finish is currently on the court? Has wax, acrylic floor polish, or another maintenance coating been applied? If this information is unknown, will the Government permit onsite adhesion testing before work begins? | wax. All current finish should be removed with 5 levels of sanding |
| 60 | Please confirm the approximate 7,000-square-foot court area. Can the Government provide a floor plan, court dimensions, photographs, video, or notes from the site visit? | Dimensions: 64.5ft wide x 105feet long. 2 Basket Ball Hoop extensions measuring 9 feet x 4.5 feet. Totalling 6,853.5 square feet. STANDARD Basketball lines. Photos attached in Amendment 00002 |
| 61 | Can the Government provide the approximate number, dimensions, and locations of the deep gouges, scratches, damaged boards, loose boards, or other areas requiring repair? | there are no deep gauges. all scratched can be smoothed with 5 levels of sanding |
| 62 | Are the existing bleachers retractable or movable? Is the contractor expected to move the bleachers, or only protect and enclose them during the work? | removable. Government will remove bleachers. |
| 63 | Can the Government provide a court-marking diagram showing all existing lines that must be repainted, including their required dimensions and colors? | See photos attached in Amendment 00002 |
| 64 | The PWS identifies the completed court as a PFA HAMR testing court. Are new HAMR lines required? If so, please provide the required HAMR layout, measurements, line colors, and applicable Air Force standard. | HAMR line is a straight blue line across the width of the court 20 meters from the basketball edge line |
| 65 | Please provide the required layout, measurements, and colors for the two tournament-ready volleyball courts. | Contractor responsibility - contractor should know the standard dimensions of a volley ball court and basketball court and should know line placement. Color for volleyball lines: Subdued green gray. |
| 66 | Please provide the approved Air Force Fitness logo artwork, preferably in a vector format, along with its required finished dimensions, colors, and exact center-court placement. | Governmentt will provide artwork and required dimensions and colors. Contractor is required to map out exact center court layout while mapping out other line requirements. 129in Wide x 73in tall. File has been attached in Amendment 00002 |
| 67 | Does the requirement for two in-ground volleyball net systems include only the floor sleeves and covers, or must the contractor also provide posts, nets, padding, anchors, and related equipment? | Only sleeves and covers. Must be compatible with STANDARD Volleyball systems. |
| 68 | If complete volleyball systems are required, is there a specified or preferred manufacturer and model? Please also provide any available information concerning the existing wood-floor assembly and the concrete or structural substrate below the proposed sleeve locations. | No |
| 69 | Will the Government identify or clear the proposed sleeve locations for concealed utilities, electrical lines, plumbing, or structural conflicts before drilling? | yes |
| 70 | Is there a required manufacturer, minimum percentage of solids, gloss level, slip-resistance standard, or other specification for the two coats of water-based high-solids gym-floor finish? | No specific product is being requested by the government. |
| 71 | Must the floor remain available for partial use during performance, or may Court 4 remain completely closed throughout sanding, painting, finishing, and curing? | no - completely closed during work |
| 72 | Are nights or weekends available if needed for sanding, painting, finish application, drying, and curing? | yes |
| 73 | Were questions, measurements, photographs, drawings, or other information developed during the September 14 site visit? If so, will that information be issued to all offerors through an amendment? | All questions and pictures from site visit have been included in Amendment 00002 |
| 74 | The Government is still accepting quotes, An extension or amendment is planned, Or if an award has already been made? | The governemnt is still acctepting quotes till 21 September 11am Central time. |
| 75 | The PWS requires “no fewer than five levels of sanding.” Does this mean five separate abrasive grits/passes, and is a specific grit sequence required? | Yes. Contractor is expected to be the Subject Matter Expert when it comes to what grit sequence shall be used. |
| 76 | Is the intent a full sand to bare wood or an abrasion/screening process followed by recoating? | yes |
| 77 | Does the Government know the existing finish system and whether wax or other maintenance coatings have been applied? | wax. All current finish should be removed with 5 levels of sanding |
| 78 | For the two in-floor volleyball net sleeve systems, please provide the required manufacturer/model, sleeve diameter, covers/lids, and other specifications. | No requirement. The contractor who wins this should be an expert in the field and should be able to provide this |
| 79 | Is the contractor providing only sleeves and covers, or also posts, nets, anchors, hardware, or complete volleyball systems? | Only sleeves and covers. Must be compatible with STANDARD Volleyball systems. |
| 80 | Please provide any available information on the existing floor construction beneath the maple, including subfloor system and approximate distance to the concrete slab | unknown |
| 81 | Will the Government provide the approved volleyball court/sleeve layout, or is the contractor responsible for establishing it? | contrractor responsible for establishing it |
| 82 | For the Air Force Fitness logo, will the Government provide approved artwork, dimensions, colors, and placement? | yes. See pdf, photos and center court |
| 83 | Please confirm whether existing basketball/game lines are to be repainted in their current locations/colors and whether specific line widths or color standards apply | repainted in existing colors and places |
| 84 | The PWS references deep scratches and gouges. Can you provide an approximate quantity or description of the repair areas? | there are no deep gauges. all scratched can be smoothed with 5 levels of sanding |
| 85 | Is any maple-board replacement anticipated, or only sanding, filling, and refinishing? | not anticipated |
| 86 | Will Government personnel move the bleachers and large equipment, or is the contractor responsible for moving/protecting them? | yes |
| 87 | Are there required cure times or a specific date the facility must be returned to service? | the contractor should be an expert in the field and tell the Gov't the required cure times |
| 88 | Red Stick Flooring LLC will be attending previously scheduled flooring training in Calhoun, Georgia from September 14 through September 16 and cannot attend the September 14 site visit. Could the Government accommodate an alternate site visit on September 17 or September 18, 2026? If so, please advise who we should coordinate with regarding appointment and base-access requirements. | There will not be another site visit provided. |
| 89 | If an alternate visit is not possible, can additional photographs, measurements, or existing-condition information be provided before the quote deadline? | All pictures from site visit will be posted on SAM.gov posting. |
| 90 | Please confirm whether attendance at the site visit is mandatory to submit a quote. | Attendance to site visit is not mandatory. |