55 CYS Fiber Optic Cables - Questions and Answers.docx
DOCX document 16 KB Posted
- Attached to
- 55 CYS Fiber Optic Cables
- Solicitation number
- FA460024Q0124
About this file
This document is a set of Questions and Answers related to a federal contract opportunity for 55th CYS Fiber Optic Cables at Offutt AFB.
The key details are:
- The contract is for the purchase of fiber optic cables, with the contractor required to provide the specified products per the attached Statement of Need document.
- All items must be TAA and Buy American Act compliant.
- The agency issuing the solicitation is the Department of the Air Force Air Combat Command.
- The Questions and Answers cover details such as the type of zip ties required (PVC), the need for hinged covers on the 2U 19" horizontal wire managers, the desired width of the hook and loop (1/2 inch), the required type of fiber patch panels (front and rear access slidable), and the current air blown fiber solution installed at Offutt AFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBO - 55th CYS Fiber Optic Cables - Amendment 0001.pdf | ||
| 55th CYS - Statement Of Need - Fiber Optic Cable 1.docx | DOCX document | |
| COMBO - 55th CYS Fiber Optic Cables.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
55th CYS Fiber Optic Cables Questions & Answers Q1. Can you elaborate on the details and scope of the CONS support listed in the statement of need?
A1. 55th CYS is requesting support from CONS or Contracting on base to purchase these materials.
Q2. Do the 14” zip ties need to be plenum or pvc?
A2. PVC
Q3. Do the 4” zip ties need to be plenum or pvc?
A3. PVC
Q4. Will the 2U 19” horizontal wire managers need covers? If so do they need to be hinged or snap on A4. Add covers, hinged preferred, but first available is fine.
Q5. On the hook and loop 25-yard roll, what is the desired width of the hook and loop.
A5. Half inch Q6. Do the fiber patch panels need to be:
a. Front access
b. Front access fixed
c. Front and rear access slidable A6. C.
Q7. What is the current air blown fiber solution installed at Offutt AFB A7. Current paths are future path micro duct 12.7mm IOD / 16mm OOD Q8. Does the 144-strand fiber need to be air blown fiber or blown/jetted?
A8. Blown/jetted Q9. Do 55 CONS have any quote formatting instructions, i.e. font, spacing, and borders?
A9. No