EMCS_updated_SOW.pdf
PDF 307 KB Posted
- Attached to
- ECMS service Contract Federal contract opportunity
- Solicitation number
- FA4600-19-R-0005
About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources_Sought_-_ECMS.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
** DRAFT **
STATEMENT OF WORK FOR
SERVICE AND MAINTENANCE OF
ENERGY MANAGEMENT AND CONTROL SYSTEMS (EMCS)
OFFUTT AFB, NEBRASKA
1. DESCRIPTION OF S E R V I C E S : The contractor shall provide all personnel, tools, supplies, equipment, and labor necessary to service and maintain the Energy Management and Control Systems (EMCS) at Offutt AFB, Nebraska including the Honeywell Enterprise Building Integrator system which is an integral part of the EMCS system.
1.1. Basic Services: The contractor will provide equipment, software and hardware enhancement and support for Customer’s Enterprise Building Integrator (EBI) system, which consists of Hardware, software at specified times listed in this Document.
1.2. Hardware Upgrades:
Base Year:
Provide new Dell server platform operating Windows Server compatible with the most current EBI version software for EBI database servers/point servers for standalone operations located at:
1-Server at Bldg 301D 1-Server at Bldg 500 1-Server at Bldg 522 1-Server at Bldg 185 1-Server at Bldg 583 1-Server at Bldg 288 1-Energy Manager Server Bldg 301D 3-New Dell point server computers located in Bldg 301D compatible with the most current version of EBI software at the time.
20-New Dell workstation computers operating on Windows Operating System and compatible with the most current EBI software at the time. Workstations must include CAC readers.
6-New Dell laptops with the required operating system and software packages loaded for support of Offutt AFB EMCS/DDC programing requirements. These will be commensurate to the laptops that Honeywell Service Technicians and DDC programmers use.
1.2.1. Hardware Support:
For hardware, included in the List of included hardware, the Contractor will, on a periodic basis, evaluate the performance of the hardware and recommend any enhancements needed to allow the software to perform as specified. If the Refresh Option is selected, the Contractor will replace the listed hardware with new hardware that satisfies the requirements of the upgraded or updated software on or about the two-year anniversary of the initiation of these EBI Software Enhancement and Support Services and on or about any succeeding two-year anniversary, for as long as these services remain in effect.
Recommended PM tasks will also be scheduled and performed quarterly. Task listed under Preventative Maintenance are a minimum requirement and a report of findings shall be summited to COR. The EBI software that resides on these machines is included in the coverage of the agreement.
1.3. Software Upgrades:
Base Year:
-Provide and install the most current version of Honeywell EBI software for the above listed servers and workstations.
-Provide labor to install the most current version of EBI software, current EBI graphics and Offutt’s current EBI database onto the provided Server and Workstation hardware listed above.
Formatted: Font color: Red
-Provide labor to transfer existing IP addresses of current EBI servers and workstations to new EBI Servers and Workstations listed above.
All Option Years:
-Provide labor to install and keep current any approved Microsoft Updates andor Honeywell cumulative updates on Servers, laptops, and workstations as necessary, quarterly (4 times annually).
-Provide software and labor to perform and verify all database backups on Servers, laptops, and workstations as necessary. Cataloguing and reporting on the status to be reported to Government quarterly (4 times annually).
1.3.1. Software Enhancement and Support:
For software included in the List of Covered Software the Contractor will, on a scheduled basis, (a) evaluate the condition of the software, (b) apply available updates that are applicable to the installed version of EBI, specifically Rev. 4.30 of the software (but for third-party software only after it has been qualified by the Contractor) and that have not been previously applied, (c) Contractor will perform a full system back-up (d) save the back-up files in a controlled area on Offutt AFB no more than 3 copies; and, will develop a data backup and recovery plan with detailed procedures for performing backups and the steps to take when recovering a system within 30 days of award of contract.
1.4. EBI Operator Training Support: The Contractor will provide five (5) 8 hour blocks of agreed upon EBI training for base personnel. Training topics shall include iItems stated in Appendix B, but the training topics can be changed/updated by the COR. Training will be scheduleds and conducted on mutually agreed upon dates during the first 30 days of each Option Year.
1.5. On Site Preventative Maintenance: The Contractors personnel will be on site to perform maintenance tasks for a minimum of 8 hours every other week on Wednesday of that week. T h e PM Service report will be emailed to The Contracting Officer Representative (COR) monthly. EBI, CARE and CAE, workstation, and laptop backups are part of these PM tasks. Backups shall be stored inside locker within EMCS office. The contractor shall maintain theupkeep EBI database and remove all unused points and associated loops and graphics from EBI database. The contractor shall update the inventory of devices on the front end quarterly and provide the COR with the updated inventory.
PM Tasks
Description Quarterly
Perform full OS System backup X
Perform CMS database backup X
Perform ASCII data backup X
Perform Honeywell Server Data backup X
Perform Display Builder database back-up X
Perform Quickbuilder File backup X
Apply available supported updates to the EBI OS X
Review event log and archive backup X
Check all cables and connections X
Check all Disk drives for correct operation X
Check memory base & expanded for correct operation X
Check cooling fan for correct operation X
Check Channel performance X
Check device and peripheral performance X
Check subjective operator activity X
Check event archiving status if in use X
Check alarm log for recurrent alarm activity X
Run disk clean up system utility X
Check and record free space on each disk drive X
Perform Acronis image copy X
W/custs agreement archive old files to free space. X
Save downloadable controllers on EBI. X
Record event number compare w/stack maximum value X
Analyze event log files & take appropriate action X
Test the Web EBI server is working correctly X
Apply Security Patches X
Test SQL server, send reqts to other SQL client X
Check the error percentage on all channels. X
Check the error percentage on all controllers. X
Check comm rates of all channels with XLNET tool X
Check synchronization of databases and files X
Save the set-up & specific menus of each station. X
Synch system pages & client pages with the server X
Run disk defragmenter utilities X
Store all backups in 3 separate locations X
Check & clean keyboard, mouse, monitor etc. X
1.6. Additional Support: Any additional support that is required by base technicians is NOT
COVERED by this contract. The work must be preauthorized by CE personnel and will require a separate purchase order at the current GSA negotiated price.
2. SERVICE DELIVERY SUMMARY:
Performance Objective Performance Threshold Provide Quality Control Program:
Periodic review of QC program and records. Updates and status of Government approved QCP to be accomplished within 30 days of contract award and annually thereafter.
No defects allowed.
Service and Maintain EMCS Equipment.
Provide maintenance of all EBI front ends and laptops, including hardware and software, and fiber optic multiplexers. Provide software updates for all maintained systems.
2 defects annually within the contract option year.
Operate computer systems and associated peripheral equipment in accordance with established procedures.
No defects allowed.
Analyze processing malfunctions in cooperation with Government personnel to determine causes and take appropriate corrective action.
2 defects annually within the contract option year.
Perform standard preventive maintenance on all hardware as defined by the equipment vendor and/or 55CES established procedures and provide report of action taken.
2 defects annually within the contract option year.
Inventories of hardware located on VLAN down to network connection
30 calendar days after award of contract and on an annual basis thereafter.
Reports as identified within the P.W.S. Turned in during the required time frame and meeting Government approved criteria.
2 defects annually within the contract option year.
3. GOVERNMENT FURNISHED PROPERTY: See Appendix A
4. SERVICE FORMATION:
4.1. Quality Control:
4.1.1. Contractor shall develop and maintain a quality program to ensure services are performed in accordance with commonly accepted commercial practices for service and maintenance of Energy Management and Control Systems and air force regulation. (AFGM2017-32-01) to include maintaining inventories, Logs of access, reports (alarms, connections, etc.)
4.1.2. Conduct and maintain accurate inventories of Equipment install, added, and removed under the purview of CE VLAN network. The installations’ CS inventory should provide thorough awareness of existing systems from ITN thru controller level. This should will be delivered within 30 calendar days after award of contract and on an annual basis.
4.1.3. Recovery plans (Incident Recovery/Disaster Recovery) are in place and managed IAW NIST SP 800-82. Response and recovery plans should contain specific tactics, techniques, and procedures (TTP) for when adverse incidence is detected. Such a plan may include having current back copies of Data base, Spare hard drives, key boards, disk, Etc. and written plan to install or mitigate issues.
4.1.4. The contractor shall develop and implement procedures to identify and prevent defective services from recurring.
4.1.5. The contractor shall develop quality control procedures that address and identifies problems in writing to the government of hardware and software issues and conflicts within the system. Reports and findings shall be electronic and emailed to the COR for approval.
4.2. Quality Assurance: The government will periodically evaluate the contractor's performance in accordance with the Quality Assurance Surveillance Plan.
4.3. Government Remedies: The contracting officer shall follow the requirements of FAR 52.212-4, Contract Terms and Conditions for Commercial Items (May 1997), for contractor's failure to correct nonconforming services.
4.4. Hours of Operation: Normal operat ion is Monday through Friday (7:30 a.m. to 4:15 p.m.) except for Federal Holidays. Inspection and Maintenance shall be performed during normal duty hours, emergency repairs 24 hours a day, seven (7) days a week.
4.5. Security Requirements: Contractor personnel shall obtain and possess at all times while on Offutt AFB, an authorized identification (ID) card and Restricted Area Badge (only in applicable areas). It is estimated that approximately two (2) full days of processing for these ID cards are required for each contractor employee prior to contract start date. Each contractor employee will be required to fill out a DD Form 1172, Application for Uniformed Services Identification Card, prior to issuance of an ID card. This form will be available from the Quality Assurance Evaluators office or the contracting office.
4.5.1. The contractor shall request a United States Air Force (USAF) Restricted Area Badge for all personnel who require unescorted entry into a restricted area(s) for specific work for the duration of the contract. While paperwork for badges is being processed escorts will be provided by the Unit Area Functional Manager (UAFM) on an interim basis for areas that requires access. The contractor will r e qu e s t a c ces s t h r ou gh th e CO R a nd wait no longer than twenty (20) minutes after the scheduled time for an escort to gain access into the restricted area. It is the contractor's responsibility to fully document al l cases where entry to restricted areas was not granted. The contractor's personnel shall have proper identification prior to entry into restricted areas. It is the responsibility of each UAFM to brief all contractor personnel working in their area on procedures and policies of their particular restricted area and document the briefing for their files.
4.5.2. The contractor shall obtain a favorable National Agency Check (NAC) investigation for its employees for unescorted entry to restricted areas. This will be accomplished by downloading Electronic Personnel Security Questionnaire (EPSQ) from the internet using address of www.dss.mil. Using the computer program each individual requiring unescorted access will accomplish a Questionnaire for Non-Sensitive Position on, SF 85 and record on a blank computer disk per EPSQ ins t ruc t ions . After accomplishment call for an appointment w i t h 55 CES/CER at 402-294-6864 for the processing of AF Form 2583 and also Resource Protection Section, 55th Security Police, Bldg. 323 1st floor, P h . 402-294-5252, who will initiate the NAC.
4.5.3. The Contractor is responsible for controlling and accounting for all identification cards and restricted area badges. When employee(s) leave the employment of the Contractor, the Contractor is responsible to recover the ID cards and all other entry/security documents from the terminated employee and immediately (within one duty day) deliver these items to the COR. When restricted area badges are involved notify the 55 CES/CER security officer. If loss or failure to turn in these items within ten (10) calendar days, the Government shall deduct the amount of $25.00 per item, per employee from the next applicable invoice. The fee is to cover the Government's administrative and inventory cost.
4.6 Performance of Services During Crisis Declared by the National Command Authority or Overseas Combatant Commanded: All services to be performed under this contract have been determined to be essential for performance during crisis and, according to Department of Defense Instruction (DODI) 3020.37 and Air Force implementation thereof, it is determined that the contractor will be required to perform during crisis as stipulated in paragraph 1 above, unless otherwise directed by the CO or COR.
4.7. The contractor shall provide emergency services within 2 hours to repair the Energy Management and Control system as determined by the COR. For purposes of this specification, an emergency situation is any condition that requires immediate action to eliminate life or serious injury hazards to personnel, prevent loss or damage to government property, or restore essential services. It is anticipated that this service will be required 25 times per year.
5. APPENDICES:
APPENDIX A
EQU IPMENT LIST
(SOFTWARE AND HARDWARE)
LOADED ON SERVERS
SOFTWARE DESCRIPTION QUANTITY REVISION
AppSight Blackbox 1
Adobe Reader XI 1 11
Server 2008 1
BACNET Explorer 1 1.00.2001.0405
BACNET Point Server 1 R430
Building Network Point Server 1 R430
CARE Controller Programmer Honeywell 1 8.03.01
Client Components 1 R430
Diagnostics Framework 1 R430
Display Builder 1 R430 build 5.7.202.103
Echelon iLON 1 600
Echelon LNS Server 1 2.00.24
Echelon Open LDV 1 3.3
Excell 5000 Direct 1 R430
HMI Web station & Display Builder 1 R430
Honeywell Logger Service 1 R430
Honeywell Plugins: CVAHU, FCU, HYD2, R10, UV, VAV2
1 R430
Honeywell HCI Runtime 1 R430
HVAC Solution Pack 1 R430
Java SE8 1 SE 8 U31
Symantec Live Update 1 2.6
Symantec Antivirus 1 10.0.2.2000
LON Works Point Server 1 R430
MS AQL Server Desktop Engine 1
Quick Builder 1 Version 3.6 build 209
Acronis 1 Version 11.5
Central Events Program Utility 1 R430
Client Side Components 1 R430
Cute PDF Writer (Shareware) 1 2.5
Interprise Building Integrator 1 R430
HMI Web Browser 1 R430
Lantronix Device Installer 1 4.2.0.4
Lantronix Redirector 1
Live Reg Symantec 1
MS Viewer Redistributable 1 2008
MS SQL 1 2008
ODBC Client 1 R430
OPC Data Transfer 1 R430
OPC Server Connect 1 R430
SQL XML 1 R430
WinPcap 1 4.1.3
LOADED ON POINT SERVERS
SOFTWARE DESCRIPTION QUANTITY REVISION
AppSight Blackbox 1
Adobe Reader XI 1 11
BACNET Explorer 1 1.00.2001.0405
BACNET Point Server 1 R430
Building Network Point Server 1 R430
CARE Controller Programmer Honeywell 1 8.03.01
Client Components 1 R430
Diagnostics Framework 1 R430
Display Builder 1 R430 build 5.7.202.103
Echelon iLON 1 600
Echelon LNS Server 1 2.00.24
Echelon Open LDV 1 3.3
Excell 5000 Direct 1 R430
HMI Web station & Display Builder 1 R430
Honeywell Logger Service 1 R430
Honeywell Plugins: CVAHU, FCU, HYD2, R10, UV, VAV2
1 R430
Honeywell HCI Runtime 1 R430
HVAC Solution Pack 1 R430
Java SE8 1 SE 8 U31
Symantec Live Update 1 2.6
Symantec Antivirus 1 10.0.2.2000
LON Works Point Server 1 R430
MS AQL Server Desktop Engine 1 R430
Quick Builder 1 R430
SWEBI‐MSSQL 1 R430
SWEBI‐Point License 1 R430
SWEBI‐Client License 1 R430
SWEBI‐HMI Browse Lie 1 R430
SWEBI‐DSA‐Points 1 R430
SWEBI‐IF‐XL5 Point Server 1 R430
SWEBI‐IF‐XL+ 1 Version 3.6 build 209
COMPUTER WORK STATIONS
SOFTWARE DESCRIPTION QUANTITY REVISION
Adobe Reader XI 1 11
Building Network Point Server 1 R430
Cute PDF viewer(Share Ware)
EBI Client Components 1 R430
EBI Station and Display Builder R430
EBI Shape Library 1 R430
EBI System Display 1 R430
Symantec Live Update 1 2.6
Symantec Antivirus 1 10.0.2.2000
Symantec Scan Engine 1 111.2.0.72
Windows 7 1
Loaded on Laptops (field tools)
Adobe Acro Reader7.0.8 8
Broadcom Gigabit integrated controller
Care 8.03
Conexant had d330 MDC V.92 MODEM R430.1
Data logger 1
Dell mobile broad band card utility 2.06
Dell resource CD 1
ECHELON open LDV 4
High definition auto driver package KB888111
Intel graphic media accelerator driver
MacAfee solidifier Antivirus 111.2.0.72
Microsoft.Net Framework 2.0 service pack 2
Microsoft.Net Framework 3.0 service pack 2
Microsoft.Net Framework 3.5 SP1 service pack 2
MSXML 6.0 Parser (KB933579 6.10.1200.0
OZ776 SCR driver V1 1.1.3.9
P Series Driver 5.07.08
Sigma TEL Audio 5.10.4820.0
Verizon Mobile Broadband Drivers 3.02.002.002
Verizon wireless USB760 Firmware Updates 1.0.3
VMware Player 301.1.13618
Windows Installer ( KB893803) 3.1
Windows XP
SWEBI‐MSSQL 1 R430
SWEBI‐Point License 1 R431
SWEBI‐Client License 1 R432
SWEBI‐HMI Browse Lie 1 R433
SWEBI‐DSA‐Points 1 R434
SWEBI‐IF‐XL5 Point Server 1 R435
SWEBI‐IF‐XL+ 1 R436
HARDWARE SERIAL # BUILDING #
SERVER CCM6P22 301D
SERVER C3M6P22 500
SERVER C3N4P22 522
SERVER C3N5P22 185
SERVER CCN5P22 301
COMPUTER J5PFP22 185
SERVER CCPAP22 301D
SERVER CCN4P22 301D
SERVER CCN6P22 301D
COMPUTER J5QDP22 500
COMPUTER J5NDP22 518
COMPUTER J5SDP22 301D
COMPUTER J5QCP22 301D
COMPUTER J5RCP22 304
COMPUTER J5SCP22 185
COMPUTER J5QBP22 507
COMPUTER J5PBP22 301
COMPUTER J5SBP22 404
COMPUTER J5PDP22 457
COMPUTER J5PCP22 565
COMPUTER J5MFP22 500
COMPUTER J5RDP22 185
COMPUTER J5RBP22 288
COMPUTER J5NCP22 583
COMPUTER J5NBP22 301D
COMPUTER J5NFP22 301
LAPTOP # 1 1BKBGD1 301D
LAPTOP # 2 2CKBGD1 301D
LAPTOP # 3 FBKBGD1 301D
LAPTOP # 4 BBKBGD1 301D
LAPTOP # 5 H1806C1 301D
LAPTOP # 6 HBKBGD1 301D
APENDIX B
MINIMUM TRAINING
DDC Personnel Training
1 How to trouble shoot and identify problems within the EBI system to include communication and networking.
2 Backing-up Servers, Point Servers, Work Stations, and Laptops.
3 Basic EBI administration.
4 Alarm logs (all facets of alarm management)
3 How to load a new BUS in EBI.
4 How to set up a new controller on EBI.
5 Building graphics and importing/deleting points on EBI.
6 Creating and deleting histories and trends.
7 Creating and exporting custom reports.
8 Any other topics deemed necessary by the COR.