SoW_(Final).docx
DOCX document 30 KB Posted
- Attached to
- Water Heater Replacement
- Solicitation number
- FA4600-16-Q-9003
About this file
This is the Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 51061_B324_Repl_HW_tank_Appendix_A.docx | DOCX document | |
| B324_Repl_HW_gen_Rev03_E01_-_P06.pdf | ||
| 51061_B324_Repl_HW_tank_Appendix_B_(002).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Replace Hot Water Generator in Building 324 King Dining Hall Rev 04
1.0 Scope: The work covered by this Statement of Work consists of all labor, equipment, and materials in performing all work required to remove the existing domestic hot water generator and replace it with a commercial electric water heater.
2.0 Major Items of Work:
2.1 System Upgrade
2.1.1 Room Access
Newly installed equipment shall be placed in the basement mechanical room pit area per plan locations. To enable placement, make the following preparations:
2.1.1.01 The water heaters shall be lowered approximately 15’-0” from the dock parking area down into the mechanical room. See Photos in Appendix B for location. Coordinate work activities with Government representative.
2.1.1.02 Remove two barrels serving steam condensate chemical injection system. Refer to Photos in Appendix B for current location. Coordinate activity with Government representative.
2.1.1.03 The Contractor may remove hand rails in boiler room segregating it from the pit and remove stair hand rails at their discretion. Should rails be removed for material handling activities, they must be reinstalled before the conclusion of the project.
2.1.2 New Work Activities
2.1.2.01 The Contractor shall visit site before performing any work to verify existing conditions.
2.1.2.02 The Government shall furnish the Contractor with plans depicting scope and location of work activities. Refer to plans in Appendix A.
2.1.2.03 Furnish and install new hot water heaters (EWH-1 in Plumbing Schedule on drawings), equipment, accessories, and piping per plans, International Plumbing Code, and manufacturer’s recommendations.
2.1.2.04 Provide mechanical and electrical rough-ins as depicted on drawings as required to serve new hot water heaters.
2.1.2.05 Provide electrical rough-ins as required. Mount fusible disconnect switches to vertical strut supports near each heater.
2.1.2.06 Remove operable bronze domestic water circulation pump from existing location and re-install the pump per new work plan location.
2.1.2.07 Fill system and check for leaks before system startup.
2.1.2.08 All new domestic water piping shall be wrapped with mechanical insulation. Insulation material shall be glass fiber with foil scrim, (Manson or approved equivalent.) Thickness shall be 1”. Pipe elbows shall be PVC jacketed.
2.1.2.09 Domestic water piping shall be identified via color-coded, self-adhesive pipe markers with arrows to indicate flow direction. Comply with ANSI / ASME A13.1-2015, ANSI Z535.1 identification codes.
2.1.2.09.1 Marker text shall be of 1-1/4” height. Arrow banding tape shall be of 2” width.
2.1.2.09.2 Acceptable pipe identification materials are: System #2 Pipe Markers by Brimar Industries, or approved equivalent.
2.1.2.09.3 Markers shall be spaced at intervals no greater than 10 linear feet of pipe.
2.1.2.010 The water heater setpoint temperature shall be 140 F.
2.1.2.011 Complete installation by bringing heaters on-line, bleeding air from system, and verifying tempered water at user fixture locations.
2.1.2.012 Remove debris and clean work areas before Owner acceptance.
2.1.3. Water Outage
2.1.3.01. Much of the hot water demand in Building 324 is derived from the commercial kitchen and food preparation areas which serve meals three times each day, seven days each week. To reduce kitchen downtime, the Contractor shall schedule performing the (3) three required line taps during a Tuesday, Wednesday, or Thursday morning starting at 0030 hours. The outage shall last less than (5) five hours, and the system shall be placed back on-line for breakfast activities starting at 0600. The Contractor shall coordinate work activities with Government representative before work is performed.
2.1.3.02. The Contractor shall install new water piping starting at the new water heater locations and work their way towards the existing hot water tank. The Contractor shall have piping rough-ins completed for water heaters, expansion tank, and circulation pump before taps into existing domestic water lines are made.
2.1.3.03. The Contractor shall pressure test their new water piping installation including: water heaters, expansion tank, circulation pump, and the majority of their distribution piping before taps shall be made into the existing domestic water lines. Verifying that the system will sustain a 125 psig pneumatic pressure for (1) one hour without noticeable leaks constitutes an acceptable pressure test method.
2.1.3.04. The Contractor shall perform, at their discretion, switchover activities complying with one of the two following options:
2.1.3.04.01 The Contractor shall relocate the bronze circulation pump during the Water Outage.
2.1.3.04.02 The Contractor shall install a flanged “spool piece” in the new bronze circulation pump rough-in location before the Water Outage. In this scenario, the Contractor shall relocate the bronze circulation pump after the Water Outage.
2.1.3.05 The Contractor shall shut down and drain the hot and cold water distribution systems as necessary in preparation for line tapping activities.
2.1.3.06 The Contractor shall install valved line taps in the existing plumbing system that shall connect to their new installation. After the taps and their connections have been accomplished, the Contractor shall pressurize the system and place it back into normal operation for Owner activities.
2.2 Asbestos Abatement
2.2.01 An asbestos abatement shall be performed on the existing hot water tank after the new installation is brought on-line. The abatement work shall be included as part of this contract.
2.2.02 The Contractor shall schedule the abatement work to follow completion of the new installation and precede demolition.
2.3 Demolition
2.2.03 The existing hot water generator shall remain on-line until the new installation is operable. Once the new installation is operational, the existing generator shall be brought off-line, valved off, drained, and capped.
2.2.04 Hot water tank asbestos abatement activities shall be performed by a credentialed contractor under this contract. Generator demolition shall occur after the abatement activites.
2.2.05 Demolish the existing domestic water tank, Grundfos circulator, backflow preventor, and associated piping.
2.2.06 The existing steam-to-domestic hot water converter shall be brought off-line, valved off, drained, and demolished.
2.2.07 The steam converter stand shall be demolished.
2.2.08 Existing sump pumps and steam condensate receiver shall remain in place.
2.2.09 The Contractor shall remove all materials off-base.
2.2.010 Remove debris and clean work areas.
3.0 Location of Work: The work location is on Offutt AFB in Building 324.
4.0 General: Replacing the hot water generator, piping, and associated accessories is required due to the rapid deterioration of the existing generator. It is corroded and currently leaking. Adequate hot water is needed for daily kitchen activities.
5.0 Codes: The work shall conform to the latest applicable Unified Facilities Criteria (UFC), International Mechanical Code (IMC), International Plumbing Code (IPC), and National Electric Code (NEC).
6.0 Contractor Qualifications
6.1 The Contractor shall be required to have at least 5 years’ combined experience in performing jobs involving one or more of the following topics:
6.1.01 Food service domestic water systems
6.1.02 Service water heating
6.1.03 Potable water distribution
6.2 The Contractor shall submit (3) job references with points-of-contact for the Government to verify work experience.
6.3 The Contractor crew shall consist of at least one person trained and experienced in Uniform and International Plumbing Code methodology. At least one person on the crew shall possess one or more of the following credentials:
6.3.01 A current Nebraska Journeyman Plumber license.
6.3.02 A current Nebraska Master Plumber license.
6.4 For applicable crafts other than the plumbing trade, technicians shall be licensed in Nebraska.
6.5 The Contractor shall submit certification information of credentialed individuals for Government records. That information shall include: person’s name, type of certification, certification agency, locale in which registered, registration number, and expiration date, as applicable. Contractor certification(s) shall be valid during the Performance period.
7.0 Occupancy: During construction the Government will not occupy the existing facilities. The contractor shall not restrict nearby pedestrian or vehicular traffic to this facility and shall coordinate construction with the Construction Inspector to minimize conflicts and to facilitate usage. The contractor shall perform the work so as not to interfere with ongoing operations in nearby areas. The contractor shall coordinate with the Project’s Point of Contact (POC) before arrival onsite.
8.0 Coordination: The contractor shall visit the premises and thoroughly familiarize themselves with the working conditions and the work to be performed.
The contractor shall coordinate and properly relate the work to be done at the site with other trades, as applicable. The contractor shall verify all of the dimensions in the field, and advise the Government Representative of any discrepancy before performing any work.
9.0 Repair of Work: The work shall be carefully laid out in advance. Where cutting, channeling, chasing, or drilling of floors, walls, partitions, ceilings or other surfaces is necessary, it shall be done to avoid damage to Government property to the maximum extent possible. Any damage to buildings, piping, or equipment, or any other Government property shall be repaired by workers skilled in that particular trade, at no additional cost to the Government.
10.0 Use of Utilities / Service Interruptions: The Government Representative shall be notified in advance of any interruptions of building utilities/services. The contractor shall describe in writing the work to be done and the time and duration of the interruption. No work shall be done until approval is received from the Government Representative.
All utilities will be made available to the Contractor without charge. Utilities shall be defined in this activity as electrical power, domestic water, and natural gas. Any temporary connections of lines that may be required will be installed, maintained and removed by the contractor at his own expense and in a manner satisfactory to the Contracting Officer. Removal of such connections or lines shall be accomplished prior to final acceptance of the contract.
10.0 Clean Up: The contractor shall ensure that the work area is cleaned up at the end of each day. Debris and trash shall be removed and properly disposed of by the contractor outside the confines of Offutt AFB.
11.0 Work Schedule:
Excluding water outage activites, the Contractor shall perform work between the hours of 0700 – 1700. Coordinate work schedule with Facility Manager before performing any work.
The work for this contract shall not be performed on Federal Holidays (New Year’s Day, Martin Luther King’s Birthday, Washington’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day and Christmas Day).
12.0 Performance Period: The work shall be performed during 06 September 2016 through 07 October 2016.
13. 0 Payment: All of the costs in connection with this contract shall be included in the lump sum price for all of the work to be performed under the Contract.
14.0 Guarantee: The equipment furnished under this contract shall be guaranteed against defective materials, design, and workmanship for the full warranty period which is standard with the manufacturer and/or supplier, but in no case less than one year from the date of acceptance either for beneficial use or final acceptance (whichever is earlier). Upon receipt of notice, from the Government, of failure of any part of the guaranteed equipment, during the guarantee period, the affected part or parts shall be replaced promptly with new parts at the expense of, and by, the contractor.
15.0 Final inspection: Contractor will allow Government’s inspector to inspect and verify all workmanship and operation of the system prior to sign off. If any deficiencies are found, the contractor will correct within 7 calendar days.
16.0 Point of Contact: The Point of Contact (POC) for this project will be Mr. Dave Perry, Civil Engineering Operations Mechanical Engineer, (402) 232-2086, david.perry.23@us.af.mil.
Personal Security Requirements: Contractor personnel shall obtain and possess an authorized identification (ID) card at all time while on Offutt Air Force (AFB).
17.0 Contractor/Employee Base and Identification, Special Clearances and Vehicle Passes: The contractor shall comply with all requirements and procedures IAW AFFARS 5352.242-900, Contractor Access to AIR Force installations.
File details come from the government source that posted it. Updated .