FA4600-16-Q-0020-0001.pdf

PDF 90 KB Posted

Attached to
EMC SAN Support FA4600-16-Q-0020
Solicitation number
FA4600-16-Q-0020
Issued by

About this file

Please review the attachment which has the updated PWS. Updated text is in red font. The due date has been extended to 8 August 2016 at 03 00PM CST.

View the file

Other files

File Type Posted
FA4600-16-Q-0020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A) update the PWS w ith EMC SAN serial number, model and sw itches used.

B) extend the due date from 03:00PM locat time on 29 Aug 2016 to 02:00PM local time on 8 Aug 2016.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4600-16-Q-0020

X 9B. DATED (SEE ITEM 11)

14-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2016

CODE

55 CONTRACTING SQ

101 WASHINGTON SQ. BLDG 40

OFFUTT AFB NE 68113

FA4600 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4600-16-Q-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

PWS 1 AUGUST 2016

14th Weather Squadron Performance Work Statement EMC Storage Area Network

1 August 2016

1.0 Overview

1.1 Introduction and Background

The 14th Weather Squadron (14WS) located in Asheville, NC, collects stores, and characterized earth-space environmental data to provide tailored and simulated weather information and services to maximize the combat effectiveness of the U.S. Department of Defense (DoD) personnel and weapon systems. The 14WS utilizes the EMC Storage Area Network (SAN) equipment to store 95% of the 14WS earth-space environmental data archive. Due to the critical nature of the 14WS production environment, it is imperative that all equipment be on vendor maintenance agreements.

2.0 Description of Services

2.1 Scope of Work

The Contractor shall provide hardware/firmware/software parts, maintenance and updates for the equipment in Attachment #1, which shall include but not be limited to the following:

• 24 x 7 x 365 phone/online support

• Firmware/Software updates as provided by the vendor

• Provide 4 hour or less onsite response time for emergency failures

• Next-business-day replacement parts

• Provide parts, telephone and online support. The term “Parts” means items such as storage processors, hard drives, controllers, power supplies, replacement fabric switches if necessary, or any part necessary to keep the hardware at full operational status.

2.2 Systems Uptime

The maintenance concept is to provide assistance in troubleshooting/isolation and replacement of faulty hardware components, units, or software to ensure specifications are met and restore system to operation.

To ensure various components operate as designed, the contractor shall provide continuous software, telephone and online support 24 hours per day, 7 days per week, and 365 days per year. In the event of advance troubleshooting or hardware replacement due to a system/hardware failure an onsite contractor will provide support with a 4 hour or less onsite response time. Further, the contractor shall provide next-business-day advanced hardware replacement response on parts delivery. The contractor will supply parts and labor.

2.3 Shipping

The contractor shall be responsible for any shipments required to repair/replace parts.

3.0 Government Furnished Equipment and Information (GFE/GFI)

N/A

4.0 Service Summary

Performance Objective PWS Reference Performance Standard

Phone/Online Support 2.1 24x7x365 ‐ 100%

4 hr or less emergency response 2.1, 2.2 4 hr/or less – 100%

Parts Replacement 2.1 Next‐Business‐Day ‐ 100%

Onsite contractor support 2.2 Next‐Business‐Day ‐ 100%

Shipping 2.3 No damages

5.0 Contractor Qualifications

The contractor shall provide certified EMC technicians when supporting phone/online/onsite support.

6.0 Entire EMC SAN System Information

Serial Number: FNM00093700271 Model Number: CX4-240

7.0 Switches

The switches are Cisco fiber switches. When the SAN was originally purchased, the switches were purchased from EMC with the rest of the SAN.

Attachment #1 Equipment Listing

Serial Number Model Number Model Description QTY

FNM00093700271 CX4-240C8 CX4-240 COMBO(8GBFC- 1GBISCSI) W 2 SPS 1

FNM00093700271 CX-4G15-300 300GB 15K 4GB FC 60

FNM00093700271 CX4-4PDAE 4G DAE FACTORY OR FIELD INSTALL 7

FNM00093700271 CX-SA07-010 1000GB 7200RPM SATA II 31

FNM00093700271 V-CX4-30015K VAULT PACK 300GB 15K 4G DRIVES QTY 5 1

FNM00093700271 DISK RETENTION DISK RETENTION 1

FOX1333GJ3N MDS-9124 MDS-9124 (24 port) 1

FOX1333GJ1V MDS-9124 MDS-9124 (24 port) 1

FXS1804Q4AP MDS-9124 MDS-9124 1

FOX11060U5C MDS-9124 MDS-9124 1

The following have been modified:

LIST OF ATTACHMENTS

Document Type Description Page(s) Attachment 1 Performance Work Statement (PWS) 1 August 2016 3 Attachment 2 WD Rev 17 12 Attachment 3 Local Requirements 1

(End of Summary of Changes)

File details come from the government source that posted it. Updated .