Exh A CDRL List.doc

DOC document 55 KB Posted

Attached to
FA4600-11-R-0012
Solicitation number
FA4600-11-R-0012
Issued by

About this file

This notice is to attach all Section J attachments for the draft RFP FA4600-11-R-0012 NIDS III requirement. No other changes to the draft RFP.

View the file

Other files

File Type Posted
Atch 6 NCIC Data Letter.doc DOC document
Exh B CDRLS-DD Fm 1423.doc DOC document
Atch 3 DD 254.doc DOC document
Atch 11 PP Tracking Record.docx DOCX document
Atch 12 Subcontracting Teaming Partner Consent Ltr.docx DOCX document
Atch 13 Client Authorization Ltr.docx DOCX document
Atch 14 Pricing model.xls XLS spreadsheet
Atch 4 AP2 BMOA.doc DOC document
Atch 18 WBS Structure.xls XLS spreadsheet
Atch 10 PP Questionnaire.docx DOCX document
Atch 16 SOO Task Order V2.docx DOCX document
Atch 15 DOL OFCCP EEOC clearance.doc DOC document
SECTION J Nov11.docx DOCX document
Atch 17 Representative SCR Worksheet.xlsx XLSX spreadsheet
Atch 1 PWS.doc DOC document
Atch 7 PPQ Cross Ref Matrix.docx DOCX document
Atch 5 Incentive Fee Plan.doc DOC document
Atch 2 GFE LIST.docx DOCX document
Exh C CDRL Matrix.docx DOCX document
Atch 9 PPQ cover ltr.docx DOCX document
Atch 8 PP Information Doc.docx DOCX document
Draft RFP 4Nov11.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A – Contract Data Requirements List (CDRL)

CDRL#
TITLE
PURPOSE
FREQUENCY
USER
A001
Program Management Plan (PMP)
Defines program goals and objectives, specifies how they will be achieved, resource allocation, and associates budget and timelines for completion. Includes the processes for risk management, configuration management, information assurance and quality assurance.
When revised
PM

A002

Integrated Master Schedule (IMS)
Contains the networked, detailed tasks necessary to ensure successful program execution. Contains the contract milestones, accomplishments, and discrete tasks/activities from contract award to completion of the contract.
When revised
PM
A003
Software Development Plan (SDP)
Describes plans for conducting software development efforts.
When revised
PM
A004
Data Accession List (DAL)
Provides a medium for identifying contractor internal data which has been generated by the contractor in compliance with the work effort described in the PWS or TO. The DAL is an index of the generated data that is made available upon request.
As required by Government.
PM
A005
Software Requirements Specification (SRS)
Specifies the requirements and the methods to be used to ensure each requirement has been met. Provides the basis for design and qualification testing.
When baseline changed
PM
A006
Software Test Plan (STP) / Software Test Description (STD)
Describes the overall plan, test preparations, test cases, and test procedures to be used to perform qualification testing.
When baseline changed
PM
A007
User Manuals

· Software User Manual (SUM)

· Mission Analysis Software (MAS) User Manual

Mission Analysis and Validation Simulation (MAVS) User Manual Provides functionality for users on-line and in hardcopy

When baseline changed
PM
A008
Software Test Report (STR)
Records contractor testing results.
When baseline changed
PM

A009

Software Version Description (SVD) includes:

· Software Change Request (SCR) List

Software Change Request (SCR) List and/or SCR Analysis Report

Provides a full identification of the system and description of all changes for each version delivery.
When baseline changed

Additional SCR List and/or SCR Analysis Report: When requested

PM

A010
Training Materials
Provides formal and informal training on the use of the application. Materials include course outlines, lesson plans, training guides, handouts, and other support material.
When revised
PM
A011
Program Management Review (PMR) Package

· PMRs

· TIMs

· ITRs

· PDRs

· CDRs

· Others as requested

Provides meetings and reviews agendas, minutes, and action items.
Agendas are due 10 working days prior to each event; minutes and action items 10 working days after the event
PM

A012

Monthly Activity and Progress Report
Provides monthly report of contractor activities, deliveries, upcoming events, Software Change Requests, and risk management.
12th Working Day Of Each Month (As Of EOM)
PM
A013
Contract Performance Report (CPR)
Provides timely, reliable summary-level data with which to assess current and projected contract cost and schedule performance.
Monthly
PM
A014
Socio-Economic Report
Provide subcontracting socio-economic reports
12th Working Day After Each Reporting Period (1 Apr – 30 September and 1 October – 31 March)
55 CONS
A015
Software Design Document (SDD)
Describes the design of the software to include architectural design, detailed design for implementation and the interfaces.
When Design Changes
PM
A016
Reliability and Maintainability (R&M)
Describes the Contractor’s organization, functions, duties, responsibilities, and

reporting requirements to ensure that a system or equipment contributes to the achievement of the maximum LCAC reliability and operational availability at the lowest possible Total Ownership Cost.

Yearly
PM
A017
Information Assurance (IA) Deliverables
Provides the IA items required for certification of the system.
For each major delivery
PM
A018
Computer Software Product End Items (CSPEI)
Contractor shall make a delivery of the application to coincide with semi-annual maintenance. Deliveries shall consist of raw source code for reference and recompilation as well as working executables.
As required

PM

A019
Technical Report – Study/Service
Provides technical reports, studies or services as requested by the Government.
When requested
PM

Section J: Exhibit B – page 1