02300FL_.pdf

PDF 72 KB Posted

Attached to
RECOVERY - SGBPP060023P3 - Repair Gas Lines & Valves, Basewide
Solicitation number
FA4600-09-B-9001
Issued by

View the file

Other files

File Type Posted
Sht111.pdf PDF
Spec Appendices.pdf PDF
Sht031.pdf PDF
Sht101.pdf PDF
Sht011.pdf PDF
Sht051.pdf PDF
Sht021.pdf PDF
Phase 3 Specs 3.pdf PDF
Sht141.pdf PDF
Sht121.pdf PDF
Sht091.pdf PDF
Phase 3 Specs2.pdf PDF
Sht071.pdf PDF
Phase 3 Specs.pdf PDF
Questions and answers.doc DOC document
Sht061.pdf PDF
Sht041.pdf PDF
Sht081.pdf PDF
Specs Amendment.pdf PDF
Sht131.pdf PDF
Bid Opening Amendment.pdf PDF
Phase 2 Specs 3.pdf PDF
Phase 2 Specs.pdf PDF
Phase 2 Specs 2.pdf PDF
09B9002-0001--posted as 9001.doc DOC document
09B9001-info to disregard Posting.doc DOC document
09B9001-0001.doc DOC document
Sht12.pdf PDF
Sht14.pdf PDF
1-52.pdf PDF
Sht03.pdf PDF
Sht11.pdf PDF
1-50.pdf PDF
Sht10.pdf PDF
Sht04.pdf PDF
Sht08.pdf PDF
02741FL_.pdf PDF
Sht07.pdf PDF
Sht13.pdf PDF
Gas Mains P3.pdf PDF
Sht06.pdf PDF
02751FL_.pdf PDF
Sht02.pdf PDF
1-60.pdf PDF
Spec Appendices.pdf PDF
Sht01.pdf PDF
1-70.pdf PDF
02230FL_.pdf PDF
02920FL_.pdf PDF
Sht09.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFUTT PROJECT NO: SGBP 06-0023 MAY 2008

TITLE: REPAIR GAS MAINS/VALVES BASE-WIDE

EARTHWORK 02300 - 1

SECTION 02300 - EARTHWORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Preparing subgrades.

2. Excavating and backfilling.

3. Subbase course for concrete walks and pavements.

4. Base course for asphalt paving.

5. Excavating and backfilling for utility trenches.

B. Related Sections include the following:

1. Division 2 Section "Site Clearing" for temporary erosion and sedimentation control measures, site stripping, grubbing, stripping and stockpiling topsoil, and removal of above- and below-grade improvements and utilities.

2. Division 2 Section "Lawns and Grasses" for finish grading, including preparing and placing topsoil and planting soil for lawns.

1.2 DEFINITIONS

A. Backfill: Soil material used to fill an excavation.

B. Base Course: Course placed between the subbase course and hot-mix asphalt paving.

C. Bedding Course: Course placed over the excavated subgrade in a trench before laying pipe.

D. Borrow Soil: Satisfactory soil imported from Government provided stockpile for use as fill or backfill.

E. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Contracting Officer’s Representative.

Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Contracting Officer’s Representative.

Unauthorized excavation, as well as remedial work directed by Contracting Officer’s Representative, shall be without additional compensation.

F. Fill: Soil materials used to raise existing grades.

G. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

OFFUTT PROJECT NO: SGBP 06-0023 MAY 2008

EARTHWORK 02300 - 2

H. Subbase Course: Course placed between the subgrade and base course for hot-mix asphalt pavement, or course placed between the subgrade and a cement concrete pavement or a cement concrete walk.

I. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below subbase, drainage fill, or topsoil materials.

J. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.

1.3 SUBMITTALS (NOT USED)

1.4 PROJECT CONDITIONS

A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Government or others unless permitted in writing by Contracting Officer’s Representative and then only after arranging to provide temporary utility services according to requirements indicated.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Unsatisfactory Soils: Soil Classification Groups GC, ML, OL, CH, MH, OH, and PT, or a combination of these groups.

C. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.

D. Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.

E. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; except with 100 percent passing a 1-inch (25-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.

F. Sand: ASTM C 33; fine aggregate, natural, or manufactured sand.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.

OFFUTT PROJECT NO: SGBP 06-0023 MAY 2008

EARTHWORK 02300 - 3

B. Preparation of subgrade for earthwork operations including removal of vegetation, topsoil, debris, obstructions, and deleterious materials from ground surface is specified in Division 2 Section "Site Clearing."

C. Protect and maintain erosion and sedimentation controls, which are specified in Division 2 Section "Site Clearing," during earthwork operations.

D. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

E. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

3.2 EXCAVATION, GENERAL

A. Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.

1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.

3.3 EXCAVATION FOR STRUCTURES

A. Excavate for structures, pavements and walls to indicated elevations. If applicable, extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.

3.4 EXCAVATION FOR UTILITY TRENCHES

A. Excavate trenches to indicated gradients, lines, depths, and elevations.

B. Excavate trenches to uniform widths to provide the following clearance on each side of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit, unless otherwise indicated.

1. Clearance: 12 inches (300 mm) each side of pipe or conduit.

C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform bearing and support of pipes and conduit. Shape subgrade to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits. Remove projecting stones and sharp objects along trench subgrade.

D. Trench Bottoms: Excavate trenches 4 inches (100 mm) deeper than bottom of pipe elevation to allow for bedding course. Hand excavate for bell of pipe.

OFFUTT PROJECT NO: SGBP 06-0023 MAY 2008

EARTHWORK 02300 - 4

3.5 SUBGRADE INSPECTION

A. Notify Contracting Officer’s Representative when excavations have reached required subgrade.

B. If Contracting Officer’s Representative determines that unsatisfactory soil is present, continue excavation and replace with compacted backfill or fill material as directed.

C. Proof-roll subgrade before filling or placing aggregate courses with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Contracting Officer’s Representative, and replace with compacted backfill or fill as directed.

D. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by Contracting Officer’s Representative., without additional compensation.

3.6 UNAUTHORIZED EXCAVATION

A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill, with 28-day compressive strength of 2500 psi (17.2 MPa), may be used when approved by Contracting Officer’s Representative.

1. Fill unauthorized excavations under other construction or utility pipe as directed by Contracting Officer’s Representative.

3.7 STORAGE OF SOIL MATERIALS

A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.

Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.

3.8 BACKFILL

A. Place and compact backfill in excavations promptly, but not before completing the following:

1. Surveying locations of underground utilities for Record Documents.

2. Testing and inspecting underground utilities.

3. Removing concrete formwork.

4. Removing trash and debris.

5. Removing temporary shoring and bracing, and sheeting.

B. Place backfill on subgrades free of mud, frost, snow, or ice.

OFFUTT PROJECT NO: SGBP 06-0023 MAY 2008

EARTHWORK 02300 - 5

3.9 UTILITY TRENCH BACKFILL

A. Backfill trenches immediately after the location of all lines, connections, and appurtenances are recorded, or at the Government Construction Representative direction.

B. Backfill with suitable material removed from excavation except where sand back fill may be specified. Backfill material shall be as specified herein and shall not contain any debris, frozen earth, large clods, stones, or other unsuitable material.

C. Place backfill simultaneously on both sides of the pipe to prevent displacement. Place backfill into the trench at an angle so that the impact on the installed pipe is minimized. Install a cushion of four feet of compacted backfill above the pipe evelope before using heavy compaction equipment.

D. Hand place backfill in the pipe envelope and compact finely divided material to 12 inches over the top of the pipe. Compact the material to 95 percent of maximum density, as determined by

ASTM D 698.

E. Backfill remainder of trench with suitable material up to the bottom of the specified surface restoration. Compact to 98 percent of maximum density under and within nine inches of pavement area and 95 percent of maximum density in other areas, as determined by ASTM D 698.

3.10 SOIL FILL

A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.

B. Place soil fill on subgrades free of mud, frost, snow, or ice.

3.11 SOIL MOISTURE CONTROL

A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.

2. Remove and replace, or scarify and air dry otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.

3.12 COMPACTION OF SOIL BACKFILLS AND FILLS

A. Place backfill and fill soil materials in layers not more than 8 inches (200 mm) in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches (100 mm) in loose depth for material compacted by hand-operated tampers.

B. Place backfill and fill soil materials evenly on all sides of structures to required elevations, and uniformly along the full length of each structure.

C. Compact soil materials to not less than the following percentages of maximum dry unit weight according to ASTM D 698:

OFFUTT PROJECT NO: SGBP 06-0023 MAY 2008

EARTHWORK 02300 - 6

1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12 inches (300 mm) of existing subgrade and each layer of backfill or fill soil material at 95 percent.

2. Under walkways, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 92 percent.

3. Under lawn or unpaved areas, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 92 percent.

3.13 GRADING

A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.

1. Provide a smooth transition between adjacent existing grades and new grades.

2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.

B. Site Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to required elevations within the following tolerances:

1. Lawn or Unpaved Areas: Plus or minus 1 inch (25 mm).

2. Walks: Plus or minus 1 inch (25 mm).

3. Pavements: Plus or minus 1/2 inch (13 mm).

3.14 FIELD QUALITY CONTROL

A. Testing Agency: The Contractor will engage a qualified independent geotechnical engineering testing agency to perform field quality-control testing and inspection and to prepare test reports at no additional cost to the Government.

B. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequent earthwork only after test results for previously completed work comply with requirements.

C. Testing agency will test compaction of soils in place according to ASTM D 1556, ASTM D 2167, ASTM D 2922, and ASTM D 2937, as applicable. Tests will be performed at the following locations and frequencies:

1. Pavement Slab Areas: At subgrade and at each compacted fill and backfill layer, at least 1 test for every 2000 sq. ft. (186 sq. m) or less of paved slab, but in no case fewer than 3 tests.

2. Trench Backfill: At each compacted initial and final backfill layer, at least 1 test for each 150 feet (46 m) or less of trench length, but no fewer than 2 tests.

D. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil to depth required; recompact and retest until specified compaction is obtained.

OFFUTT PROJECT NO: SGBP 06-0023 MAY 2008

EARTHWORK 02300 - 7

3.15 PROTECTION

A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

C. Where settling occurs within the warranty period, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

3.16 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Owner's property.

END OF SECTION 02300