Attachment_3_-_Offeror_Schedule_Revised.XLSX
XLSX spreadsheet 46 KB Posted
- Attached to
- 5 Year Protective Coatings IDIQ Federal contract opportunity
- Solicitation number
- FA4528-18-R-0008
About this file
Attachment 3 - Offeror Schedule Revised
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_-_Offeror_Schedule_Revised_5.11.18.XLSX | XLSX spreadsheet | |
| FA4528-18-R-0008_Amendment_3.pdf | ||
| FA4528-18-R-0008_Amendment_2.pdf | ||
| Attachment_3_-_Offeror_Schedule_Revised.XLSX | XLSX spreadsheet | |
| FA4528-18-R-0008-0001.pdf | ||
| Attachment_1_-_SOW_5_Year_Paint_IDIQ_-_28_Nov_17.pdf | ||
| Attachment_3_-_Offer_Schedule.XLSX | XLSX spreadsheet | |
| FA4528-18-R-0008_Painting_IDIQ.pdf | ||
| Attachment_5_-_Financial_Responsibility.docx | DOCX document | |
| Attachment_4_-_Past_Performance_Information_Form.docx | DOCX document | |
| Attachment_6_-_Project_Detail_Sheet_-_Seed_Project.XLS | XLS spreadsheet | |
| Attachment_7_-_Site_Drawing_-_Seed_Project.pdf | ||
| Attachment_2_-_Davis_Bacon_Wage_Determination.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Parking Lot SF
| BLDG # | Master SF | DESCRIPTION | #of Symbols | Type | Pkng TSF |
| 121 | 214 | Comm Facility | N/A | 214 | |
| 122 | 475 | DORM | N/A | 475 | |
| 123 | 160 | Dorm | N/A | 160 | |
| 128 | 181 | 91 SW training/kitchn | 181 | ||
| 130&131 | 773 | DORMS | N/A | 773 | |
| 135 | 1445 | Post Office/Lemon Lot | N/A | 1445 | |
| 140 | 563 | Bowling Alley | 563 | ||
| 145 & 155 | 1411 | Mini Mall | 9 | Arrows | 1411 |
| 156 | 1337 | Ed Center/Library | N/A | 1337 | |
| 158-161 | 433 | TLF's | N/A | 433 | |
| 164 & 168 | 426 | Housing Mgmt | 6 | Arrows | 426 |
| 166 | 646 | CDC | 7 | Arrows & 1 crswlk | 646 |
| 168 | 500 | 5Cons/Wellness | 500 | ||
| 167 | 427 | BW Hdqrtrs | 427 | ||
| 167 | 429 | 5SVS | 429 | ||
| 174 & 175 | 811 | O-Club/Sak Inn | N/A | 811 | |
| 178 | 677 | Linen Exchange | N/A | 677 | |
| 183 & 184 | 341 | VAQ | N/A | 341 | |
| 194 | 1870 | Hosp Staff lot | 7 | Arrows | 1870 |
| 194 | 234 | Hosp Emergency lot | N/A | 234 | |
| 194 | 1523 | Hosp Patient lot | N/A | 1523 | |
| 196 | 313 | Visitors Center | 2 | Arrows | 313 |
| 205 | 316 | DORM | 316 | ||
| 202 | 256 | Community Center | N/A | 256 | |
| 207/Theater | 2055 | Dorm/Theater/Community | Handcap | 1 crswlk | 2055 |
| 208 | 718 | DORM | N/A | 718 | |
| 210,211,213,217 | 2328 | Chow Hall | N/A | 2328 | |
| 215,220,222,224 | 2171 | FTAC Dorm | 3 | 2171 | |
| 246 | 3108 | Commissary | 12 | Arrows | 3108 |
| 260 | 745 | Professional Dev cntr | 2 | Arrows | 745 |
| 270 | 277 | Burger King | N/A | 277 | |
| 275 | 575 | Dorm West lot | 575 | ||
| 276/284 | 1006 | Vet Clinic/Dorm | N/A | 1006 | |
| 280 | Base Pool | 2 | Arrows | ||
| 286 | 563 | Youth Center | 4 | Arrows | 563 |
| 289 | 645 | Hsng Maint Shop | 645 | ||
| 291 | 92 | Family Spt Cent | 2 | Arrows | 92 |
| 292 | 512 | JR ROCKERS | N/A | 512 | |
| 393 | 735 | Combat Arms | N/A | 735 | |
| 420 | 176 | POL | N/A | 176 | |
| 437 | 3123 | BX | 12 Arrow | 4 hand caps | 3123 |
| 442 | 694 | Bus Barn | 15 | Arrows | 694 |
| 445 | 563 | MAIN CE pkng | 3 | Arrows | 563 |
| 455 | 2200 | Base Gym | N/A | 2200 | |
| 460 | 1045 | Vehicle Trans | 2 | 5MPH | 1045 |
| 460 | 393 | Vehicle trans east lot | 393 | ||
| 475 | 2369 | PRIDE East lot | 2369 | ||
| 475 | 4094 | Pride main pkng | 12 | Arrows | 4094 |
| 476 | 365 | Flight Simulator | 365 | ||
| 505 | 1050 | 5SFS/Water shop | 1050 | ||
| 521 & 526 | 998 | Cocess/Road&Grnds | 5 | Arrows | 998 |
| 532 thru 527 | 2049 | Zone #3 & LRS | 2049 | ||
| 531 | 144 | DRMO(east) | N/A | 144 | |
| 543 | 1033 | 91 Mw Maint garage | N/A | 1033 | |
| 546 | 175 | 91 SW Front lot | N/A | 175 | |
| 546 | 1500 | 91SW NE Portion | 4 | Arrows | 1500 |
| 546 | 3002 | 91 MW NW pkng | 7 | Arrows | 3002 |
| 546 | 944 | MW S Center lot | 5 | Arrows | 944 |
| 547 | 3425 | 5 SPS Hdqtrs | 5 | Arrows | 3425 |
| 583 | 110 | Skills Development | 2 | Arrows | 110 |
| 585 | 642 | Aafees gas station | 3 | 2 Arrows & 1EXIT | 642 |
| 587 | 959 | SubShop | 2 | Arrows | 959 |
| 598 | 101 | Bioenvironmental | N/A | 101 | |
| 679 | 150 | SP Maint Office bldg | 150 | ||
| 692 | 120 | Uniform-1 U-1 | 120 | ||
| 746 | 1037 | Base Ops | 5 | Arrows | 1037 |
| 748 | 901 | 5 MXS maint shop | 9 | Arrows | 901 |
| 758 | 120 | Dock #9 | 120 | ||
| 763 | 300 | Dock #10 | 300 | ||
| 767 | 106 | Base photo lab | 2 | Arrows | 106 |
| 768 | 606 | Logistics Hdqrtrs | 606 | ||
| 773,774,775 | 651 | 5 SPTG Hqs | 1 | Arrows | 651 |
| 846 | 891 | INN Flight (South) | N/A | 891 | |
| 848 | 408 | 5AMXS | 408 | ||
| 781 | 176 | POL | N/A | 176 | |
| 857 | 1448 | 5 MXS Acft North lot | 5 | Arrows | 1448 |
| 857 | 367 | 5 MXS Facility | South lot | 367 | |
| 859 | 408 | MUNS | 5 | Arrows | 408 |
| 862 & 863 | 614 | Docks #2 & #4 | N/A | 614 | |
| 869 | 393 | 23BS Maint shop | N/A | 393 | |
| 870 | 901 | Comm Sqdn | 1 | 901 | |
| 879 | 245 | Liquid fuel/PowerPro | 3 | Arrows | 245 |
| 893 | 195 | Parachute Shop | 3 | Arrows | 195 |
| 896 | 265 | Fire Dept | 265 | ||
| 897 | 382 | 5 CES EOD | 3 | Arrows | 382 |
| 898 | 308 | Heli Hanger | 308 | ||
| 970 | 325 | DOCK #7 | N/A | 325 | |
| 973 | 64 | 5SUPS Storage | 64 | ||
| 975 | 372 | 5 MXS Maint shop | N/A | 372 | |
| 1088 | 208 | Comm Ops | N/A | 208 | |
| 1115 | 757 | WSA | N/A | 0 | |
| 1134 & Guide lines | 7000 | WSA | N/A | 0 | |
| 1142 &1144 | 2175 | 5MXS Facility | Includes Yellow | 2175 | |
| 1176 | 725 | Golf Club | N/A | 725 | |
| 85063 | Total SF | 77306 |
Street Paint
| Area Discription | Square Footage | Waterborne | Epoxy | Epoxy Removal | Total Waterborne | Total Epoxy | Total removal |
| Apply Epoxy - 4'' width "YELLOW" center skips, intesrsection turn channels,& diversion Y's (EST 8,888 Square Feet)_ Turn Channels Located on Missile Ave Intersections located at Missile/Peacekeeper Ave and Missile/Summit Ave_Diversion Y's located at main and south gates |
| 9770 | $0.55 | $2.73 | $3.63 | $5,373.50 | $26,672.10 | $35,465.10 |
| Apply Epoxy - 4'' width "WHITE" continuous edge line (EST 6,002) Square Feet)_White edge line is located in various areas. Construction Inspector will Identify areas during project completion. | ||||||
| 6706 | $0.55 | $2.73 | $3.63 | $3,688.30 | $18,307.38 | $24,342.78 |
| Apply Epoxy - 6'' width "WHITE" Intersection Turn Channels (EST 490 Square Feet)_Intersections are located on Missile/Peacekeeper Ave, Missile/Summit Ave and Missile Ave | ||||||
| 590 | $0.55 | $2.73 | $3.63 | $324.50 | $1,610.70 | $2,141.70 |
| Apply Epoxy - "WHITE" Turn Arrow Intersection symbol markings (8' height) QTY -29_Intersections are located on Missile/Peacekeeper Ave, Missile/Summit Ave and Missile Ave | ||||||
| 512 | $0.90 | $5.45 | $3.63 | $460.80 | $2,790.40 | $1,858.56 |
| Apply Epoxy - "WHITE" Stop Bars (12" width x 10' length) Est 80 Stop Bars_Stop Bars are located throughout the industrial side of the base streets. Apply Stop Bars adjacent to the Stop signs. | ||||||
| 940 | $0.90 | $5.45 | $3.63 | $846.00 | $5,123.00 | $3,412.20 |
| Apply Epoxy - "WHITE" Crosswalks (18" x 6' marks, 18" spaced) Est 123 Hash Marks_Crosswalks are located throughout the industrial side of the base streets. | ||||||
| 828 | $0.90 | $5.45 | $3.63 | $745.20 | $4,512.60 | $3,005.64 |
| base housing crosswalks and stopbars at the following_3 each at intersection of Huey Lane and Roaming road |
locations_4 ea at intersection of Roaming Road and Peacekeeper Place_1 each at the intersection of H Street and Dauphin Drive
| 1102 | $0.90 | $5.45 | $3.63 | $991.80 | $6,005.90 | $4,000.26 | |
| Project Totals | $12,430.10 | $65,022.08 | $74,226.24 |
Parking Form 9 Contract # FA4528-11-R-0014 Option Year 1: Furnish all labor, transportation, tools, materials, equipment, and supervision as specified in the Protective Coatings Statement of Work at Minot AFB ND for 1 Oct 2012-30 Sep 2013 DO# 5019
| ITEM | DESCRIPTION | EST QUANTITY | UNIT | Unit Price | CLIN Total |
| 1009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 1009AA | Routine (TTP-1952 Water Borne Paint) | 79,100 | SF | 0.60 | $47,460.00 |
| Peroid of Performance | 20 August 2013 thru 19 August 2014 | DO Total | 47,460.00 | ||
| Description: Perform Restriping of all base parking lots. |
BasicYr
| Offer Schedule - 08 May 18 | |
| FA4528-18-R-0008 | |
| Paint IDIQ | Contractor Name |
| Attachment 3 | Date |
| CLIN 0001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 001AA | Prime Coat or 1st Coat Paint | 250,000 | SF | $0.00 | |
| 001AB | 2nd Coat paint if required | 250,000 | SF | $0.00 | |
| 002 | INTERIOR PAINTING (Section C-6) | ||||
| 002AA | Prime Coat or 1st Coat Paint | 500,000 | SF | $0.00 | |
| 002AB | 2nd Coat paint if required | 200,000 | SF | $0.00 | |
| 003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 003AA | Remove existing wall covering | 10,000 | SF | $0.00 | |
| 003AB | Routine Installation | 2,500 | SF | $0.00 | |
| 004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 004AA | Routine | 75,000 | SF | $0.00 | |
| 005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 005AA | Routine | 75,000 | SF | $0.00 | |
| 006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 006AA | Routine | 10,000 | SF | $0.00 | |
| 007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 007AA | Routine (TTP-1952 Water Borne) | 0 | SF | $0.00 | |
| 008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 008AA | Routine (TTP-1952 Water Borne Paint) | 0 | SF | $0.00 | |
| 009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 009AA | Routine (TTP-1952 Water Borne Paint) | 40,000 | SF | $0.00 | |
| 010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 010AC | Rubber Removal | 640,000 | SF | $0.00 | |
| 011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 011AC | Special request,(with/without beads) | 4,000 | SF | $0.00 | |
| 011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 012AA | Routine | 1,000 | SF | $0.00 | |
| 013 | WOODWORK REFINISHING (Section C-11) | ||||
| 013AA | Routine | 500 | SF | $0.00 | |
| 014 | SECURITY DELAYS (Section C-1.5) | ||||
| 014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 015AA | Sandblasting/Hydroblasting | 1,000 | SF | $0.00 | |
| 016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 016AA | Routine | 2,000 | SF | $0.00 | |
| 017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 5,000 | SF | $0.00 | |
| 017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior Teflon coating | 4,000 | SF | $0.00 | |
| 018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 018AA | Routine | 40 | SF | $0.00 | |
| 019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 019AA | Routine | 0 | SF | $0.00 | |
| 020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 020AA | Routine | 0 | SF | $0.00 | |
| 021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 021AA | Routine | 1,860 | SF | $0.00 | |
| 022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 022AA | Routine | 9,605 | SF | $0.00 | |
| 023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 023AA | EPOXY (Existing)Scarifying/Removal | 0 | SF | $0.00 | |
| 024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 0025 | MAF MOBILIZATION | ||||
| 0025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 0026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 7,575 | SF | $0.00 | |
| 0026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 0 | SF | $0.00 | |
| Total Basic Yr | $0.00 |
OptYrOne
| Offer Schedule - 08 May 18 | |
| FA4528-18-R-0008 | |
| Paint IDIQ | Contractor Name |
| Attachment 3 | Date |
| CLIN 0001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 1001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 1001AA | Prime Coat or 1st Coat Paint | 250,000 | SF | $0.00 | |
| 1001AB | 2nd Coat paint if required | 250,000 | SF | $0.00 | |
| 1002 | INTERIOR PAINTING (Section C-6) | ||||
| 1002AA | Prime Coat or 1st Coat Paint | 500,000 | SF | $0.00 | |
| 1002AB | 2nd Coat paint if required | 200,000 | SF | $0.00 | |
| 1003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 1003AA | Remove existing wall covering | 10,000 | SF | $0.00 | |
| 1003AB | Routine Installation | 2,500 | SF | $0.00 | |
| 1004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 1004AA | Routine | 75,000 | SF | $0.00 | |
| 1005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 1005AA | Routine | 75,000 | SF | $0.00 | |
| 1006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 1006AA | Routine | 10,000 | SF | $0.00 | |
| 1007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 1007AA | Routine (TTP-1952 Water Borne) | 1,800 | SF | $0.00 | |
| 1008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 1008AA | Routine (TTP-1952 Water Borne Paint) | 15,000 | SF | $0.00 | |
| 1009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 1009AA | Routine (TTP-1952 Water Borne Paint) | 40,000 | SF | $0.00 | |
| 1010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 1010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 1010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 1010AC | Rubber Removal | 640,000 | SF | $0.00 | |
| 1011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 1011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 1011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 1011AC | Urgent (special request, with/without beads) | 4,000 | SF | $0.00 | |
| 1011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 1012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 1012AA | Routine | 1,000 | SF | $0.00 | |
| 1013 | WOODWORK REFINISHING (Section C-11) | ||||
| 1013AA | Routine | 500 | SF | $0.00 | |
| 1014 | SECURITY DELAYS (Section C-1.5) | ||||
| 1014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 1015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 1015AA | Sandblasting/Hydroblasting | 1,000 | SF | $0.00 | |
| 1016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 1016AA | Routine | 2,000 | SF | $0.00 | |
| 1017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 1017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 1017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 5,000 | SF | $0.00 | |
| 1017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior coating | 4,000 | SF | $0.00 | |
| 1018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 1018AA | Routine | 0 | SF | $0.00 | |
| 1019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 1019AA | Routine | 0 | SF | $0.00 | |
| 1020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 1020AA | Routine | 0 | SF | $0.00 | |
| 1021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 1021AA | Routine | 1,860 | SF | $0.00 | |
| 1022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 1022AA | Routine | 9,605 | SF | $0.00 | |
| 1023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 1023AA | EPOXY (Existing)Scarifying/Removal | 0 | SF | $0.00 | |
| 1024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 1024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 1024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 1024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 1025 | MAF MOBILIZATION | ||||
| 1025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 1026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 1026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 0 | SF | $0.00 | |
| 1026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 4,865 | SF | $0.00 | |
| Total Opt Yr One | $0.00 |
OptYrTwo
| Offer Schedule - 08 May 18 | |
| FA4528-18-R-0008 | |
| Paint IDIQ | Contractor Name |
| Attachment 3 | Date |
| CLIN 0001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 2002 | INTERIOR PAINTING (Section C-6) | ||||
| 2002AA | Prime Coat or 1st Coat Paint | 500,000 | SF | $0.00 | |
| 2002AB | 2nd Coat paint if required | 200,000 | SF | $0.00 | |
| 2003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 2003AA | Remove existing wall covering | 10,000 | SF | $0.00 | |
| 2003AB | Routine Installation | 2,500 | SF | $0.00 | |
| 2004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 2004AA | Routine | 75,000 | SF | $0.00 | |
| 2005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 2005AA | Routine | 75,000 | SF | $0.00 | |
| 2006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 2006AA | Routine | 10,000 | SF | $0.00 | |
| 2007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 2007AA | Routine (TTP-1952 Water Borne) | 0 | SF | $0.00 | |
| 2008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 2008AA | Routine (TTP-1952 Water Borne Paint) | 0 | SF | $0.00 | |
| 2009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 2009AA | Routine (TTP-1952 Water Borne Paint) | 40,000 | SF | $0.00 | |
| 2010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 2010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 2010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 2010AC | Rubber Removal | 640,000 | SF | $0.00 | |
| 2011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 2011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 2011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 2011AC | Urgent (special request, with/without beads) | 4,000 | SF | $0.00 | |
| 2011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 2012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 2012AA | Routine | 1,000 | SF | $0.00 | |
| 2013 | WOODWORK REFINISHING (Section C-11) | ||||
| 2013AA | Routine | 500 | SF | $0.00 | |
| 2014 | SECURITY DELAYS (Section C-1.5) | ||||
| 2014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 2015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 2015AA | Sandblasting/Hydroblasting | 1,000 | SF | $0.00 | |
| 2016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 2016AA | Routine | 2,000 | SF | $0.00 | |
| 2017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 2017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 2017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 5,000 | SF | $0.00 | |
| 2017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior coating | 4,000 | SF | $0.00 | |
| 2018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 2018AA | Routine | 0 | SF | $0.00 | |
| 2019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 2019AA | Routine | 0 | SF | $0.00 | |
| 2020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 2020AA | Routine | 1,860 | SF | $0.00 | |
| 2021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 2021AA | Routine | 1,860 | SF | $0.00 | |
| 2022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 2022AA | Routine | 9,605 | SF | $0.00 | |
| 2023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 2023AA | EPOXY (Existing)Scarifying/Removal | 0 | SF | $0.00 | |
| 2024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 2024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 2024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 2024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 2025 | MAF MOBILIZATION | ||||
| 2025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 2026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 2026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 0 | SF | $0.00 | |
| 2026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 0 | SF | $0.00 | |
| Total Opt Yr Two | $0.00 |
OptYrThree
| Offer Schedule - 08 May 18 | |
| FA4528-18-R-0008 | |
| Paint IDIQ | Contractor Name |
| Attachment 3 | Date |
| CLIN 0001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 3001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 3001AA | Prime Coat or 1st Coat Paint | 250,000 | SF | $0.00 | |
| 3001AB | 2nd Coat paint if required | 250,000 | SF | $0.00 | |
| 3002 | INTERIOR PAINTING (Section C-6) | ||||
| 3002AA | Prime Coat or 1st Coat Paint | 500,000 | SF | $0.00 | |
| 3002AB | 2nd Coat paint if required | 200,000 | SF | $0.00 | |
| 3003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 3003AA | Remove existing wall covering | 10,000 | SF | $0.00 | |
| 3003AB | Routine Installation | 2,500 | SF | $0.00 | |
| 3004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 3004AA | Routine | 75,000 | SF | $0.00 | |
| 3005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 3005AA | Routine | 75,000 | SF | $0.00 | |
| 3006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 3006AA | Routine | 10,000 | SF | $0.00 | |
| 3007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 3007AA | Routine (TTP-1952 Water Borne) | 0 | SF | $0.00 | |
| 3008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 3008AA | Routine (TTP-1952 Water Borne Paint) | 0 | SF | $0.00 | |
| 3009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 3009AA | Routine (TTP-1952 Water Borne Paint) | 40,000 | SF | $0.00 | |
| 3010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 3010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 3010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 3010AC | Rubber Removal | 640,000 | SF | $0.00 | |
| 3011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 3011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 3011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 3011AC | Urgent (special request, with/without beads) | 4,000 | SF | $0.00 | |
| 3011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 3012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 3012AA | Routine | 1,000 | SF | $0.00 | |
| 3013 | WOODWORK REFINISHING (Section C-11) | ||||
| 3013AA | Routine | 500 | SF | $0.00 | |
| 3014 | SECURITY DELAYS (Section C-1.5) | ||||
| 3014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 3015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 3015AA | Sandblasting/Hydroblasting | 1,000 | SF | $0.00 | |
| 3016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 3016AA | Routine | 2,000 | SF | $0.00 | |
| 3017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 3017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 3017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 5,000 | SF | $0.00 | |
| 3017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior coating | 4,000 | SF | $0.00 | |
| 3018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 3018AA | Routine | 0 | SF | $0.00 | |
| 3019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 3019AA | Routine | 0 | SF | $0.00 | |
| 3020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 3020AA | Routine | 0 | SF | $0.00 | |
| 3021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 3021AA | Routine | 1,860 | SF | $0.00 | |
| 3022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 3022AA | Routine | 9,605 | SF | $0.00 | |
| 3023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 3023AA | EPOXY (Existing)Scarifying/Removal | 0 | SF | $0.00 | |
| 3024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 3024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 3024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 3024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 3025 | MAF MOBILIZATION | ||||
| 3025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 3026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 3026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 0 | SF | $0.00 | |
| 3026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 0 | SF | $0.00 | |
| Total Opt Yr Three | $0.00 |
OptYrFour
| Offer Schedule - 08 May 18 | |
| FA4528-18-R-0008 | |
| Paint IDIQ | Contractor Name |
| Attachment 3 | Date |
| CLIN 0001 | Description of Item | Estimated Quantity | Unit | Unit Price | Extended Price |
| 4001 | EXTERIOR PAINTING, (Section C-6) | ||||
| 4001AA | Prime Coat or 1st Coat Paint | 250,000 | SF | $0.00 | |
| 4001AB | 2nd Coat paint if required | 250,000 | SF | $0.00 | |
| 4002 | INTERIOR PAINTING (Section C-6) | ||||
| 4002AA | Prime Coat or 1st Coat Paint | 500,000 | SF | $0.00 | |
| 4002AB | 2nd Coat paint if required | 200,000 | SF | $0.00 | |
| 4003 | GOVERNMENT-FURNISHED VINYL WALLCOVERING (Sections C-4.4.6, and C-9) | ||||
| 4003AA | Remove existing wall covering | 10,000 | SF | $0.00 | |
| 4003AB | Routine Installation | 2,500 | SF | $0.00 | |
| 4004 | REPAIR WALL SURFACES (Section C-6) | ||||
| 4004AA | Routine | 75,000 | SF | $0.00 | |
| 4005 | APPLY TEXTURE COATING (Section C-6) | ||||
| 4005AA | Routine | 75,000 | SF | $0.00 | |
| 4006 | TAPE & BED NEW GYPSUM BOARD (Section C-6) | ||||
| 4006AA | Routine | 10,000 | SF | $0.00 | |
| 4007 | STREETS (Lettering/Arrows/Crosswalks/Stop Bars)(Section C-7) | $0.00 | |||
| 4007AA | Routine (TTP-1952 Water Borne) | 0 | SF | $0.00 | |
| 4008 | STREET STRIPING (Section C-7) | $0.00 | |||
| 4008AA | Routine (TTP-1952 Water Borne Paint) | 0 | SF | $0.00 | |
| 4009 | PARKING LOTS (Striping/Arrows/Lettering/Symbols) (Section C-7) | ||||
| 4009AA | Routine (TTP-1952 Water Borne Paint) | 40,000 | SF | $0.00 | |
| 4010 | AIRFIELD RUNWAY (Section C-7) | ||||
| 4010AA | Routine (with reflective beads) | 150,746 | SF | $0.00 | |
| 4010AB | Routine (without reflective beads) | 64,708 | SF | $0.00 | |
| 4010AC | Rubber Removal | 640,000 | SF | $0.00 | |
| 4011 | AIRFIELD TAXIWAY AND RAMPS (Section C-7) | ||||
| 4011AA | Routine (with reflective beads) | 118,406 | SF | $0.00 | |
| 4011AB | Routine (without reflective beads) | 188,655 | SF | $0.00 | |
| 4011AC | Urgent (special request, with/without beads) | 4,000 | SF | $0.00 | |
| 4011AD | Paint Restricted Area Signs Waterborne (Attachment 1, Section C-7) | 379 | EA | $0.00 | |
| 4012 | WOOD FLOOR REFINISHING (Section C-10) | ||||
| 4012AA | Routine | 1,000 | SF | $0.00 | |
| 4013 | WOODWORK REFINISHING (Section C-11) | ||||
| 4013AA | Routine | 500 | SF | $0.00 | |
| 4014 | SECURITY DELAYS (Section C-1.5) | ||||
| 4014AA | Security Delay | 100 | Per 15 Mins | $0.00 | |
| 4015 | SANDBLASTING/HYDROBLASTING (Section 6.3.8.3 and 7.3.2) | ||||
| 4015AA | Sandblasting/Hydroblasting | 1,000 | SF | $0.00 | |
| 4016 | MASONARY JOINT SEALING/CAULKING (Section C-12) | ||||
| 4016AA | Routine | 2,000 | SF | $0.00 | |
| 4017 | SPECIAL AREAS (Section C-8, Sign Posts, Fire Hydrants, etc.)(Section C-13, Oil/Alkyd Hangar Floor Marking Application) | ||||
| 4017AA | Routine--Section C-8 Sign Posts, Fire Hydrants, etc. | 100 | EA | $0.00 | |
| 4017AB | Routine--Section C-13, Oil/Alkyd Hangar Floor Markings | 5,000 | SF | $0.00 | |
| 4017AC | Routine--Section C-8, Hangers Anti-Bird Nest exterior coating | 4,000 | SF | $0.00 | |
| 4018 | PREFORMED PLASTIC PAVEMENT TAPE (12" or 16" width White 65 Mils Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Crosswalks/Stop Bars)(Section C-7.5) | ||||
| 4018AA | Routine | 0 | SF | $0.00 | |
| 4019 | PREFORMED PLASTIC PAVEMENT TAPE STREET STRIPING (4" or 6" width White or Yellow 65 Mills Grooved 80 Mils +/- 10 & Glued 3M-380 ES) (Section C-7.5) | ||||
| 019AA | Routine | 0 | SF | $0.00 | |
| 020 | PREFORMED PLASTIC PAVEMENT TAPE(Existing) Grinding / Removal Groove 80 Mils +/- 10) (Section C-7.5) | ||||
| 4020AA | Routine | 0 | SF | $0.00 | |
| 4021 | EPOXY STREETS (Lettering/Arrows/Crosswalks/Stop Bars) (Section C-7.4) | ||||
| 4021AA | Routine | 1,860 | SF | $0.00 | |
| 4022 | EPOXY STREET STRIPING (Section C-7.4) | ||||
| 4022AA | Routine | 9,605 | SF | $0.00 | |
| 4023 | "EPOXY" PAVEMENT MARKING PAINT Scarifying/Removal (Section C-7.4) | ||||
| 4023AA | EPOXY (Existing)Scarifying/Removal | 19,210 | SF | $0.00 | |
| 4024 | STATE CERTIFIED LBP INSPECTOR (Section C-1.6.7) | ||||
| 4024AA | Analysis including XRF Machine (Sections 1.6.7.2) | 20 | HOURS | $0.00 | |
| 4024AB | Mobilization to Minot AFB or Missile Alert Facilities (1 fee per project)Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 4024AC | Lab Analysis Per Chip Sample -- Turn around time within 72 hours (Section 1.6.7.2) | 10 | EA | $0.00 | |
| 0025 | MAF MOBILIZATION | ||||
| 0025AA | MOBILIZATION to Off Base sites Missile Alert Facilities, MAF (1 fee per project) Sec 1.5.6.5 | 3 | EA | $0.00 | |
| 4026 | Base Swimming Pool Preparation & Painting (Section C-14) | ||||
| 4026AA | Surface Preparation and Painting - Outdoor Pool (Sec C-14) | 7,575 | SF | $0.00 | |
| 4026AB | Surface Preparation and Painting - Indoor Pool (Sec C-14) | 4,865 | SF | $0.00 | |
| Total Opt Yr 4 | $0.00 |
TOTAL Basic + 4 option years $0.00
File details come from the government source that posted it.