Attachment_1_-_SOW_-_Repair_970_Roof.pdf

PDF 36 KB Posted

Attached to
Repair Roof Bldg 970 Federal contract opportunity
Solicitation number
FA4528-17-R-0033
Issued by
Department of the Air Force Global Strike Command

About this file

SOW for FA4528-17-R-0033

View the file

Other files for this federal contract opportunity

Other files attached to Repair Roof Bldg 970, newest first.
File Type Posted
FA4528-17-R-0033-0001.pdf PDF
Attachment_2_-_BLDG_970_ROOF_DRAWING.pdf PDF
FA4528-17-R-0033_Repair_970_Roof.pdf PDF
Attachment_3_-_DBA_Wage_Determination_-_Heavy.pdf PDF
Attachment_4_-_Financial_Responsibility.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. AFID 1054767

14 JUN 2017

Repair Roof- (Temp), Dock 7, B970 Statement of Work

STATEMENT OF WORK

PROJECT NO. AFID 1054767

REPAIR ROOF- (TEMP), DOCK 7, BLDG 970

1. GENERAL

1.1 The existing roofing system on the upper roof of Building 970 is a 60 mil EPDM membrane fully adhered to a 2” isocynurate insulation board that is over a 3” isocynurate insulation board that is a filler in the pans of an existing standing seam metal roof; over batt insulation that is on a structural steel deck. Both layers of insulation board have screw fasteners that penetrate through the bottom structural steel deck. About two thirds of the north portion of the roofing was torn and blown off over the east end of the building. Most of the insulation board is still intact but, a small amount of the insulation board was pulled up and removed with the roofing membrane tear off. All torn off roofing membrane with some insulation board and fascia wood/metal blew over the east wall, was cut off and hauled away. There are other areas on the upper roof that existing EPDM membrane is loose but has not torn and blown away. If possible this could be reused with added surfaced mounted strip furring. Contractor shall retain the existing lightning protection system on the upper roof.

2. DESCRIPTION OF PROJECT

2.1. Contractor shall provide all labor, material and equipment to install a water tight temporary membrane over entire upper main roof of Building 970. See enclosed roof plan for roof area and dimensions. Contractor shall verify all existing dimensions and conditions. Any exposed wood walls shall not have a new temporary cover membrane installed.

2.2. Contractor shall remove all damaged roof membrane, insulation board and perimeter wood/metal flashing as required that will not be retained. Contractor shall provide and install a 60 mil EPDM temporary roof membrane over all areas on the roof that have blown off or cannot be reused. Provide surface mounted strip furring with mechanical fasteners as required to keep the loose membrane and insulation from blowing off.

2.3. All work areas will be cleaned of debris on a daily basis and a final cleanup at the end of the job. No debris shall be allowed on any airfield aprons or main landing strip.

2.4. No implied warranty for any of the above work shall be

included.

3. OVERVIEW

Project No. AFID 1054767

Repair Roof- (Temp), Dock 7, B970 Statement of Work

3.1. As a submittal, provide cut sheets of all material to be used for approval. Use AF Form 3000 for submittal cover sheet.

3.2. As a submittal, Contractor shall coordinate with appropriate utility locating agencies, including base communications cable maintenance, AF Form 103, Base Civil Engineering Work Clearance Request. Contractor shall complete and follow all instructions on AF Form 103 before start of work on base.

3.3. Submit and obtain a written permit prior to performing "Hot Work" (i.e. welding or cutting) or operating other flame-producing/spark producing devices, from the Fire Department. A permit is required from the Explosives Safety Office for work in and around where explosives are processed, stored, or handled. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. Provide at least two 20 pound 4A:20 BC rated extinguishers for normal "Hot Work". The extinguishers must be current inspection tagged, and contain an approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch must be trained in accordance with NFPA 51B and remain on-site for a minimum of one hour after completion of the task or as specified on the hot work permit.

3.4. All regulations pertaining to safety as noted in OSHA

Standards, applicable AFOSH Standards, and base regulations shall be strictly adhered to by the contractor. Particular care shall be exercised in connection with the operation of vehicles and other equipment on the site.